Form_2_-_Price_Schedule.docx
DOCX document 18 KB Posted
- Attached to
- Rehab campground water system, Olympic NP, WA
- Solicitation number
- 140P8322R0008
About this file
This request for proposals solicits offers to rehabilitate the public water system at Heart o' the Hills campground within Olympic National Park near Port Angeles, Washington. The scope of work includes replacing the well pump and controls, the water treatment building, interior and exterior tank coatings, distribution piping with HDPE, backflow prevention, and directional drilling under Ennis Creek. Additives provide options to maintain the wastewater system, replace tanks, and refurbish lift station equipment. The National Park Service seeks a firm-fixed-price small business contract set aside under NAICS 237110 with Davis-Bacon wages. Proposals are due approximately 30 days after posting of the solicitation package in June 2022. The contractor must substantially complete performance by June 2023. This best value procurement will consider both technical capability and price in awarding to the offer representing the best value.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rehabilitate Public Water System (215339) Olympic National Park
INSTRUCTIONS
Offerors are required to submit, at minimum, an offer that conforms to the solicitation documents with pricing for base items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of an error in the calculation of extended prices, the unit price governs. In case of an error in summation, the total of the corrected amounts governs. Round totals and extended prices to whole dollars.
Complete this page and return with other documents described in Section L.
CONTRACT PRICE SCHEDULE
All work shall be performed in accordance with the attached specifications, drawings, and wage determination. Refer to Attachment 1 for line item definitions.
| Contract Line Item |
| Price |
| 1: Well Rehabilitation |
| $__________________ |
| 2: Water Treatment Building Replacement |
| $__________________ |
| 3: Water Storage Tank Rehabilitation |
| $__________________ |
| 4: Water Distribution System Replacement |
| $__________________ |
| 5: Asphalt Repair |
| $__________________ |
| TOTAL PRICE FOR BASE ITEMS 1 through 5: |
| $__________________ |
The Government reserves the right to unilaterally award any or no options at or after time of award.
See Paragraphs H.6 and M.1 C for details.
| Option A – Wastewater Collection System Maintenance & Inspection |
| $_________________ |
| Option B – Wastewater Tank Rehabilitation |
| $_________________ |
| Option C – Gate Replacement |
| $_________________ |
| TOTAL FOR ALL ITEMS and ALL OPTIONS |
| $_________________ |
Business name (Offeror): _________________________________________ UEI: _______________________________________ CAGE code: ______________________ Point of contact name: ____________________________________ E-mail: ________________________________________________ Phone number: __________________________________________ The representations and certifications in SAM apply to this proposal (see FAR provision 52.204-8(b)(2)):
__yes __no.
File details come from the government source that posted it. Updated .