FN1612-26 SPACE PLAN AND INSTALL 2.pdf

PDF 4 MB Posted

Attached to
Space Planning and Design
Solicitation number
FN1612-26
Issued by

About this file

This is a Standard Form 1449 (SF 1449) Solicitation/Contract/Order for Commercial Items issued by Federal Prison Industries (FPI, operating as UNICOR) for design and space planning services related to office furniture products.

The solicitation (FN1612-26) seeks a single-award, indefinite delivery/indefinite quantity (IDIQ) contract with a five-year performance period and a guaranteed minimum of $1,000.00. The contract is unrestricted, with a NAICS code 541410 (Interior Design Services) and a $9.0 million business size standard. Services must be provided throughout the continental United States, Alaska, Puerto Rico, Hawaii, and OCONUS locations. The solicitation is issued as a Request for Proposal (RFP) with an offer due date of September 4, 2026, at 2:00 PM EST. Offerors must be registered in the System for Award Management (SAM) and hold a valid UEI and TIN. The primary contracting officer is Brent Ponder at UNICOR FCC Coleman (Forrest City, AR), with secondary contact Barbara McMaster at UNICOR Yazoo City (MS).

Key service requirements include design and space planning for UNICOR's office furniture products, with designers requiring National Council for Interior Design Qualification (NCIDQ) certification. Services encompass site visits (within 72 hours of task order issuance for continental US), initial drawings (within 10 calendar days), final bill of materials (within 10 calendar days), and installation manuals (within 3 calendar days). Pricing is based on US Department of Labor wage determinations, with services priced per workstation by region and site visit type (prepared/unprepared/conversion/verification). The contract includes one major and one minor revision as standard. Evaluation factors include technical ability (pass/fail), past performance (excellent/good/fair/poor), and price, weighted equally. Payment will be made by UNICOR FPI Central Accounts Payable (PO Box 11849, Lexington, KY 40578-1849), and all invoices must reference the purchase order number. Proposals must include NCIC forms, past performance surveys, pricing spreadsheets, sales sample justification, and copies of NCIDQ certifications for all designers.

View the file

Other files

File Type Posted
FN1612-26 A0001 Space Plan Design.pdf PDF
FN1612-26 A0001 Space Plan Design.pdf PDF
Past Performance Survey FN1612 26 REVISED.docx DOCX document
Spaceplan Pricing Spreadsheet 26-31.xlsx XLSX spreadsheet
NCIC FORM.doc DOC document
Discount Request.pdf PDF
SalesTools_ChairSample_Justification.pdf PDF
Past Performance Survey FN1612 26.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 1 of 79ORDER NUMBER:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

Coll. No.

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

UEI

Document Number

Page 2 of 79ORDER NUMBER:

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date

Page 3 of 79ORDER NUMBER:

Page 4 of 79ORDER NUMBER:

Page 5 of 79ORDER NUMBER:

Page 6 of 79ORDER NUMBER:

Page 7 of 79ORDER NUMBER:

Page 8 of 79ORDER NUMBER:

Page 9 of 79ORDER NUMBER:

Page 10 of 79ORDER NUMBER:

Page 11 of 79ORDER NUMBER:

Page 12 of 79ORDER NUMBER:

Page 13 of 79ORDER NUMBER:

Page 14 of 79ORDER NUMBER:

Page 15 of 79ORDER NUMBER:

Page 16 of 79ORDER NUMBER:

Page 17 of 79ORDER NUMBER:

Page 18 of 79ORDER NUMBER:

Page 19 of 79ORDER NUMBER:

Page 20 of 79ORDER NUMBER:

Page 21 of 79ORDER NUMBER:

Page 22 of 79ORDER NUMBER:

Page 23 of 79ORDER NUMBER:

Page 24 of 79ORDER NUMBER:

Page 25 of 79ORDER NUMBER:

Page 26 of 79ORDER NUMBER:

Page 27 of 79ORDER NUMBER:

Page 28 of 79ORDER NUMBER:

Page 29 of 79ORDER NUMBER:

Page 30 of 79ORDER NUMBER:

Page 31 of 79ORDER NUMBER:

Page 32 of 79ORDER NUMBER:

Page 33 of 79ORDER NUMBER:

Page 34 of 79ORDER NUMBER:

Page 35 of 79ORDER NUMBER:

Page 36 of 79ORDER NUMBER:

Page 37 of 79ORDER NUMBER:

Page 38 of 79ORDER NUMBER:

Page 39 of 79ORDER NUMBER:

Page 40 of 79ORDER NUMBER:

Page 41 of 79ORDER NUMBER:

Page 42 of 79ORDER NUMBER:

Page 43 of 79ORDER NUMBER:

Page 44 of 79ORDER NUMBER:

Page 45 of 79ORDER NUMBER:

Page 46 of 79ORDER NUMBER:

Page 47 of 79ORDER NUMBER:

Page 48 of 79ORDER NUMBER:

Page 49 of 79ORDER NUMBER:

Page 50 of 79ORDER NUMBER:

Page 51 of 79ORDER NUMBER:

Page 52 of 79ORDER NUMBER:

Page 53 of 79ORDER NUMBER:

Page 54 of 79ORDER NUMBER:

Page 55 of 79ORDER NUMBER:

Page 56 of 79ORDER NUMBER:

Page 57 of 79ORDER NUMBER:

Page 58 of 79ORDER NUMBER:

Page 59 of 79ORDER NUMBER:

Page 60 of 79ORDER NUMBER:

Page 61 of 79ORDER NUMBER:

Page 62 of 79ORDER NUMBER:

Page 63 of 79ORDER NUMBER:

Page 64 of 79ORDER NUMBER:

Page 65 of 79ORDER NUMBER:

Page 66 of 79ORDER NUMBER:

Page 67 of 79ORDER NUMBER:

Page 68 of 79ORDER NUMBER:

Page 69 of 79ORDER NUMBER:

Page 70 of 79ORDER NUMBER:

Page 71 of 79ORDER NUMBER:

Page 72 of 79ORDER NUMBER:

Page 73 of 79ORDER NUMBER:

Page 74 of 79ORDER NUMBER:

Page 75 of 79ORDER NUMBER:

Page 76 of 79ORDER NUMBER:

Page 77 of 79ORDER NUMBER:

Page 78 of 79ORDER NUMBER:

Page 79 of 79ORDER NUMBER:

Page of

ORDER NUMBER:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PAGE 1 OF

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO

16. ADMINISTERED BY

CODE

18a. PAYMENT WILL BE MADE BY

CODE

17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ

IFB

RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS

UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE:

% FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE

ARE NOT ATTACHED

ARE

ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA \\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg Right Arrow Pointing to Call the Contact Point for this Solicitation/Contract/Order 8 (A)

EDWOSB

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SMALL BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

SMALL BUSINESS

Page of

UEI

Document Number Printing C:\FORMFLOW\FORMS\SF\S1449_3.FRP BarbMWilliams

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No. SUPPLIES OR SERVICE Quantity U/M UNIT PRICE AMOUNT IN US$ Delivery Date

LV_TITLE: Request for Quotation
CurrentSheet:
SheetCount:
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
20. SCHEDULE OF SUPPLIES/ SERVICES: 1620000344
1. REQUISITION NUMBER:
PAGE 1 OF:
2. CONTRACT NUMBER:
4. ORDER NUMBER:
5. SOLICITATION NUMBER: 50-5263
31b. NAME OF CONTRACTING OFFICER (Type or print): Erik Ponder
31b. NAME OF CONTRACTING OFFICER (Type or print): Erik Ponder
7. FOR SOLICITATION INFORMATION CALL: b. TELEPHONE NUMBER (No collect calls): 870-630-6000
7. FOR SOLICITATION INFORMATION CALL: b. TELEPHONE NUMBER (No collect calls): 870-630-6000
15. DELIVER TO CODE: OFMP
15. DELIVER TO CODE: OFMP
% For :
12. DISCOUNT TERMS:
13b. RATING:
15. DELIVER TO:
17a. CONTRACTOR/ OFFEROR CODE: 391014499
17a. CONTRACTOR/ OFFEROR CODE: 391014499
17a. CONTRACTOR/ OFFEROR CODE: 391014499
17a. CONTRACTOR/ OFFEROR: UNDETERMINED SOURCE

NA BLANK

WASHINGTON DC 20534

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER:
18a. PAYMENT WILL BE MADE BY:
19. ITEM NUMBER. Line 1 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES: See Section B
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 2 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 3 of 8.:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 4 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES: 50-5263
20. SCHEDULE OF SUPPLIES/ SERVICES: 50-5263
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 5 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 6 of 8.:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 7 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
19. ITEM NUMBER. Line 8 of 8.:
20. SCHEDULE OF SUPPLIES/ SERVICES:
21. QUANTITY:
22. UNIT:
23. UNIT PRICE:
25. ACCOUNTING AND APPROPRIATION DATA:
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED. INITIALS :

29. AWARD OF CONTRACT: REFERENCE OFFER:
DATE. YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS.:

30b. NAME OF SIGNER (Type or print):
30b. TITLE OF SIGNER (Type or print):
10. THIS ACQUISITION IS UNRESTRICTED: 1
10. THIS ACQUISITION IS SET ASIDE:: 0
11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED SEE SCHEDULE: X
13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700): 0
14. METHOD OF SOLICITATION RFQ: 0
10. THIS ACQUISITION IS NAICS:: 541410
14. METHOD OF SOLICITATION IFB:
14. METHOD OF SOLICITATION RFP: 1
18a. PAYMENT WILL BE MADE BY CODE:
17a. CONTRACTOR/ OFFEROR TELEPHONE NUMBER:
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA: 0
29. AWARD OF CONTRACT :
27a. ARE ATTACHED: 0
29. AWARD OF CONTRACT DATE Enter 2 digit month, 2 digit day and 4 digit year.:
30c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
6. SOLICITATION ISSUE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2026-02-26
8. OFFER DUE DATE Enter 2 digit month, 2 digit day and 4 digit year.: 2026-09-04
8. OFFER LOCAL TIME: 2:00 PM
9. ISSUED BY: UNICOR OFMP FCC COLEMAN

846 NE 54TH TERRACE

COLEMAN FL 33521

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK IS CHECKED SEE ADDENDUM:
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
26. TOTAL AWARD AMOUNT (FOR GOVT. USE ONLY): 0.00
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER :

31A. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) :
10. THIS ACQUISITION IS SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS: 0
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0
27a. ARE ATTACHED:
6. SOLICITATION ISSUE DATE. Enter 2 digit month, 2 digit day and 4 digit year.: 2026-02-26
10. THIS ACQUISITION IS SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS: 0
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0
10. THIS ACQUISITION IS HUBZONE SMALL BUSINESS: 0
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
23. UNIT PRICE:
27a. ARE ATTACHED: 0
10. THIS ACQUISITION IS NAICS::
17a. CONTRACTOR/ OFFEROR TELEPHONE NUMBER:
LV_TERMS_OF_DELIV: Terms:
INCO1:
INCO2:
LV_TARGET_VALUE_CHAR:
TDLINE: DC-REGION-W/SITE-VISIT-UNPREPARED
TDLINE: DC-REGION-W/SITE-VISIT-PREPARED
TDLINE: DC-REGION-W/SITE-VISIT-CONVERSION
TDLINE: DC-REGION-W/SITE-VISIT-VERIFICATION
TDLINE: DC-REGION-W/O-SITE-VISIT-UNPREPARED
TDLINE: DC-REGION-W/O-SITE-VISIT-PREPARED
TDLINE: DC-REGION-W/O-SITE-VISIT-CONVERSION
TDLINE: DC-REGION-W/O-SITE-VISIT-VERIFICATION
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-UNPREP
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-PREP
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-CONV
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-VER
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-UNPREP
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-PREP
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-CONV
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-VER
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-UNPREP
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-PREP
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-CONV
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-VER
TDLINE: SPL-HOURLY-RATE.
TDLINE: SSA-NO-SITE-VISIT.
TDLINE: OCONUS-UPCHARGE-GUAM-INSTALL
TDLINE: DC-REGION-W/SITE-VISIT-UNPREPARED
TDLINE: DC-REGION-W/SITE-VISIT-PREPARED
TDLINE: DC-REGION-W/SITE-VISIT-CONVERSION
TDLINE: DC-REGION-W/SITE-VISIT-VERIFICATION
TDLINE: DC-REGION-W/O-SITE-VISIT-UNPREPARED
TDLINE: DC-REGION-W/O-SITE-VISIT-PREPARED
TDLINE: DC-REGION-W/O-SITE-VISIT-CONVERSION
TDLINE: DC-REGION-W/O-SITE-VISIT-VERIFICATION
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-UNPREP
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-PREP
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-CONV
TDLINE: ALL-OTHER-REGION-W/SITE-VISIT-VER
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-UNPREP
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-PREP
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-CONV
TDLINE: ALL-OTHER-REGION-W/O-SITE-VISIT-VER
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-UNPREP
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-PREP
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-CONV
TDLINE: OCONUS-AK<(>&<)>HI-(PLUS-EXPENSES)-VER
TDLINE: SPL-HOURLY-RATE.
TDLINE: SSA-NO-SITE-VISIT.
TDLINE: OCONUS-UPCHARGE-GUAM-INSTALL
TDLINE: SECTION A - Solicitation FN1612-26
TDLINE: SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
TDLINE: Federal Prison Industries (FPI), which operates under the trade name
TDLINE: UNICOR, is a wholly-owned Government Corporation within the Department
TDLINE: of Justice, under the Federal Prison System. The Corporation was created
TDLINE: by Congress in 1934, and provides employment, education, and training
TDLINE: opportunities to inmates under Federal custody. UNICOR operates
TDLINE: approximately 62 factories in over 52 locations. Its production lines
TDLINE: are extensive and include over 118 different products and services sold
TDLINE: to other Federal Agencies and the Department of Defense.
TDLINE: Interested offerors shall read the solicitation in its entirety prior to
TDLINE: submission of any questions, All questions shall be submitted in writing
TDLINE: to Brent Ponder at Brent.Ponder@usdoj.gov and Barbara McMaster at
TDLINE: Barbara.McMaster@usdoj.gov by Monday, August 24, 2026, @ 2:00 pm EST. No
TDLINE: questions will be answered verbally. No questions will be answered after
TDLINE: August 24, 2026. An amendment will be issued after August 25, 2026, with
TDLINE: answers to all written questions received before the deadline date.
TDLINE: GENERAL INTENTION: It is the intent of this solicitation to result in an
TDLINE: Single Award Indefinite Delivery Indefinite Quantity Type Contract with
TDLINE: a five year period of performance for space planning and Design of
TDLINE: UNICOR furniture products. Solicitation number is FN1612-26 and this
TDLINE: solicitation is issued as a Request for Proposal (RFP). This
TDLINE: solicitation is unrestricted full and open solicitation. Offers from
TDLINE: any size will be considered for award. Guaranteed Minimum is $1,000.00
TDLINE: over the duration of the contract.
TDLINE: contract. NAICS Code 541410 Business Size Standard is $9.0 million
TDLINE: Services are to be provided throughout the continental United States.
TDLINE: States, Alaska, Puerto Rico, and Hawaii and occasionally OCONUS. If
TDLINE: you disagree with the NAICS code used for this requirement it must be
TDLINE: brought up during the question phase of the solicitation.
TDLINE: The following information pertains to the Standard Form 1449
TDLINE: Solicitation: OMB 1103-0018 The offer acceptance period is 120 calendar
TDLINE: days. Block 25, Funds (15X4500) will be obligated by each delivery order
TDLINE: and not by the contract itself. Block 31b, Brent Ponder, Contract
TDLINE: Specialist.
TDLINE: NOTE: UNICOR may add services to the contract at a later date through
TDLINE: modification to the awarded contract. All solicitations (also future
TDLINE: procurement) and any other information (amendments, etc.) may be
TDLINE: obtained through beta.SAM.gov.
TDLINE: THE FOLLOWING INFORMATION IS REQUIRED TO BE COMPLETED BY THE OFFEROR:
TDLINE: SAM UNIQUE ENTITY NUMBER:_______________________________________
TDLINE: VENDOR'S POINT OF CONTACT: _____________________________________
TDLINE: VENDOR'S TELEPHONE & FAX NUMBER: _______________________________
TDLINE: VENDOR'S EMAIL ADDRESS: ________________________________________
TDLINE: VENDOR'S BUSINESS SIZE (i.e. SMALL, LARGE, ETC.): ________________
TDLINE: By submission of an offer, the offeror acknowledges the requirement that
TDLINE: a prospective awardee shall be registered in the SAM database (System
TDLINE: Award Management) prior to award, during performance and through final
TDLINE: payment of any contract resulting from this solicitation.
TDLINE: _______________________________________________ Signature
TDLINE: The Administrative Contracting officer is Brent Ponder at
TDLINE: Brent.Ponder@usdoj.gov.
TDLINE: All offerors must complete the following information prior to submission
TDLINE: of offer to be considered for award, in addition to the requirements of
TDLINE: Section L.
TDLINE: Provide pricing on all services to be performed under this contract
TDLINE: utilizing the excel pricing sheet attached. An electronic copy must be
TDLINE: submitted by closing date and time of solicitation. This electronic form
TDLINE: is posted as part of this solicitation package. Electronic copy of
TDLINE: solicitation must be returned to Brent.Ponder@usdoj.gov by offer closing
TDLINE: date and listed on the SF1449. To be considered for award, a bid must
TDLINE: comply in all material respects with the request for proposal. Such
TDLINE: compliance enables offerors to stand on an equal footing and maintain
TDLINE: the integrity of the bidding process.,, Offers shall be filled out,
TDLINE: executed, and submitted in accordance with the instructions in the
TDLINE: proposal. Award on the proposal will result in a binding contract with
TDLINE: terms and conditions that do not vary from the terms and conditions of
TDLINE: the proposal. The UEI and TIN numbers must match your information on
TDLINE: www.sam.gov: UEI Number: TIN Number: A copy of the entire proposal shall
TDLINE: be sent to the two (2) individuals listed below. The proposals shall
TDLINE: reference FN1612-26.
TDLINE: UNICOR FCI Forrest City
TDLINE: Attn: Brent Ponder Contract Specialist
TDLINE: Reference: FN1612-26
TDLINE: UNICOR WAREHOUSE 1400 Dale Bumpers Rd.
TDLINE: Forrest City, AR 72335
TDLINE: Email: Brent.Ponder@usdoj.gov
TDLINE: Phone: (870)633-6000 ext1375
TDLINE: UNICOR Yazoo City, MS
TDLINE: Attn: Barbara McMasters, Contract Specialist
TDLINE: Reference: FN1612-26
TDLINE: 2225 Haley Barbour Parkway Yazoo City, MS. 39194.
TDLINE: Email: Barbara.McMaster@usdoj.gov
TDLINE: Phone: (662)751-4800 x 4112.
TDLINE: Contractor agrees that FPI is in the category of the most favored or
TDLINE: best commercial customer category of the Contractor and as such, the
TDLINE: Contractor will:
TDLINE: During the contract period, the Contractor shall report to the
TDLINE: Contracting Officer all price reductions offered to the category of
TDLINE: customers that are considered by the Contractor to be their most favored
TDLINE: or best commercial customer.
TDLINE: 1. A price reduction shall apply to purchases under this contract if,
TDLINE: after the award date, the Contractor-
TDLINE: ,,i) Revises downward its commercial catalog, price list, schedule,
TDLINE: etc., to its best commercial customers (or category of customers) below
TDLINE: the awarded price under this contract;
TDLINE: ,,ii) Grants more favorable discounts or terms and conditions to its
TDLINE: best commercial customers than those contained in this contract that
TDLINE: would result in prices below the awarded price under this contract,
TDLINE: an/or
TDLINE: ,,iii) Grants special discounts to its best commercial customer (or
TDLINE: category of
TDLINE: customers) that would result in prices lower than the awarded price
TDLINE: under this contract.
TDLINE: 2. The Contractor shall offer the price reduction to FPI with
TDLINE: the same effective date, and for the same time period, as extended to
TDLINE: the commercial customer (or category of customers).
TDLINE: The Contractor may offer the Contracting Officer a voluntary price
TDLINE: reduction at any time during the contract period.
TDLINE: The Contractor shall notify the Contracting Officer of any price
TDLINE: reduction subject to this clause as soon as possible, but not later than
TDLINE: 15 calendar days after its effective date. All
TDLINE: Future requirements for these or similar items from this or other UNICOR
TDLINE: factories may be added to the resulting contract if considered to fall
TDLINE: within the scope of work and the price is determined to be fair and
TDLINE: reasonable.
TDLINE: Section C - Statement of Work
TDLINE: UNICOR Office Furniture Group has a contract requirement for design and
TDLINE: space planning services. Successful offeror(s) will be responsible for
TDLINE: design and space planning of UNICOR’S Office Furniture Group product
TDLINE: offering during the term of the contract. Successful offeror(s) will be
TDLINE: required to work with UNICOR’s sales and marketing vendor(s) on a daily
TDLINE: basis for the duration of this award. This shall include existing
TDLINE: products as well as new products added to our lines at a later date.
TDLINE: Designers shall be qualified by National Council for Interior Design
TDLINE: Qualification (NCIDQ) and shall provide a copy of their registered
TDLINE: license number at the time of submitting the proposal.
TDLINE: Offeror(s) serves as the primary point of contact on day to day
TDLINE: communication for design and project related tasks. Offeror(s) shall be
TDLINE: responsible for the design, development, fit and management of the
TDLINE: project schedule; manage the project budget and document project
TDLINE: reporting and communication. Services shall also include the following:
TDLINE: •,,Meet and participate with customer in project planning
TDLINE: •,,Lead project communication, programming, space planning and analysis
TDLINE: of suggesting furniture and finish specifications that meet the design
TDLINE: requirements
TDLINE: •,,Responsible for customer communications, design and deliverables,
TDLINE: drawings and design intent package to include bill of materials
TDLINE: •,,De-Installation/Installation quoting for UNICOR products, ancillary
TDLINE: items, as well as UNICOR services. This includes providing a statement
TDLINE: of work packet to UNICOR installation contracting. This packet will
TDLINE: include site survey, statement of work, product listing, PDF drawings,
TDLINE: and any other relevant material. This packet will be sent to UNICOR
TDLINE: contracting on a schedule or as needed per UNICOR’s request. All
TDLINE: installations that could be completed in an 8 hour day (10 workstations
TDLINE: or less) will be quoted with receive/delivery to a warehouse. Install
TDLINE: regions will be as follows: West, East, Central, OCONUS/Alaska, and
TDLINE: Metropolitan. Metro areas will be as follows: New York City (including
TDLINE: Burroughs), Boston, Chicago, San Francisco, Seattle. Any changes to
TDLINE: specific areas lists will be made by modification of contract.
TDLINE: •,,Installation minimum charge remote/metro area- Remote areas will be
TDLINE: looked at on a case-by-case basis and an upcharge will be added if
TDLINE: necessary. The metro areas listed above will have an upcharge added.
TDLINE: •,,Provide timely support to UNICOR installation vendors for any
TDLINE: design/space planning issues or questions.
TDLINE: Layout services - Offeror(s) shall provide customers with complete
TDLINE: interior design, space planning, and furniture consultation and product
TDLINE: specifications.
TDLINE: •,,Evaluation of customer's overall office space and furniture
TDLINE: requirements, existing inventory, space standards, the functional office
TDLINE: environment, work flow, special space or electrical/data requirements.
TDLINE: •,,Formulation of design solution.
TDLINE: •,,Development of detailed plans based on evaluation and proposed design
TDLINE: solutions.
TDLINE: •,,Production of documentation in print and electronic formats.
TDLINE: •,,Production of drawings and other documentation_ containing sufficient
TDLINE: detail or design intent for use by all parties and trades.
TDLINE: •,,Offeror(s) shall provide comprehensive management support for design,
TDLINE: reconfiguration, relocation, increase or downsizing of office spaces.
TDLINE: •,,Development of project related tasks and the implementation of
TDLINE: strategies.
TDLINE: •,,Development of project phasing.
TDLINE: •,,Preparation of design and acquisition budgets.
TDLINE: •,,Management of the Design process.
TDLINE: •,,Compliance with applicable codes and regulations.
TDLINE: •,,Responsibility for adherence to scope of work.
TDLINE: •,,Feasibility forecasting of space and building analyses.
TDLINE: The design process will include all steps necessary to ensure that
TDLINE: project designs will meet customer needs. This may include conducting
TDLINE: customer interviews, estimating/quoting the value of installed product,
TDLINE: providing initial designs to customers for design confirmation,
TDLINE: developing product specifications, furniture layouts, creating a bill of
TDLINE: materials, and meeting any special customer requirements. Project
TDLINE: designs will maximize the inclusion of all FPI products (systems
TDLINE: furniture, seating, case goods, and metal products, etc.). Offeror(s)
TDLINE: shall provide quality assurance checks prior to issuing any bill of
TDLINE: materials and drawings to the customer. Under no circumstances shall
TDLINE: designers provide a final bill of materials (BOM) to the customer until
TDLINE: all selections are made (i.e. laminates, fabrics, selection of wood
TDLINE: colors and hardware). Failure to comply with the above will result in
TDLINE: the vendor being responsible for any customer delays as a result of
TDLINE: providing inaccurate information. The one exception to providing the
TDLINE: final BOM prior to the customer finalizing their selections is that
TDLINE: customers may need to fund their projects prior the end of the fiscal
TDLINE: year (September 1st – September 30th). The successful offeror will not
TDLINE: be penalized during this time period.
TDLINE: The design and space planning will be required for the Continental
TDLINE: United States, Alaska, Puerto Rico, Hawaii and other OCONUS (Outside the
TDLINE: Continental United States) locations. Locations shall be staffed at a
TDLINE: level and physically located sufficiently to provide timely responses to
TDLINE: customers.
TDLINE: The following space planning lead times will be incorporated into the
TDLINE: contract:
TDLINE: Site Visit: The space planning site visit or contact with the customer
TDLINE: shall be made within 72 hours after issuance of a task order by UNICOR,
TDLINE: regardless of the number of workstations. This 72 hour response time
TDLINE: applies to the continental United States. This service will be provided
TDLINE: at no additional cost to UNICOR or its customers for 5 workstations or
TDLINE: fewer.
TDLINE: Site Survey: A site survey will be completed by the customer as part of
TDLINE: the design process. It will be included in the installation statement of
TDLINE: work package to UNICOR. It will be updated when any major revisions are
TDLINE: made to the order or the site and also if the site survey is older than
TDLINE: six months.
TDLINE: Initial Drawings: An initial set of plans (up to 50 workstations) shall
TDLINE: be sent to UNICOR’s customers within ten (10) calendar days after the
TDLINE: site visit.
TDLINE: Final Bill of Materials (FBOM): A final bill of materials shall be sent
TDLINE: to UNICOR’s customers within ten (10) calendar days after written
TDLINE: approval (customer’s signature) of the plans by UNICOR’s customers. Add
TDLINE: one calendar day for each additional 50 workstations.
TDLINE: Installation Manual: An installation manual shall be provided to the
TDLINE: installer within three (3) calendar days after a request has been made.
TDLINE: Offeror(s) shall provide design/space planning services for the National
TDLINE: Capital Region and all other regions as listed below:
TDLINE: National Capital Region (NCR) to include:
TDLINE: Washington, DC
TDLINE: Baltimore, Maryland
TDLINE: Charles County, Maryland
TDLINE: Prince Georges County, Maryland
TDLINE: Montgomery County, Maryland
TDLINE: Frederick County, Maryland
TDLINE: Loudon County, Virginia
TDLINE: Prince William County, Virginia
TDLINE: Fairfax County, Virginia
TDLINE: Fauquier County, Virginia
TDLINE: All other regions to include:
TDLINE: West Region
TDLINE: Washington
TDLINE: Oregon
TDLINE: Montana
TDLINE: Idaho
TDLINE: Wyoming
TDLINE: California
TDLINE: Nevada
TDLINE: Utah
TDLINE: Colorado
TDLINE: New Mexico
TDLINE: Arizona
TDLINE: Alaska
TDLINE: Hawaii
TDLINE: Central Region
TDLINE: North Dakota
TDLINE: South Dakota
TDLINE: Nebraska
TDLINE: Kansas
TDLINE: Oklahoma
TDLINE: Texas
TDLINE: Minnesota
TDLINE: Iowa
TDLINE: Missouri
TDLINE: Arkansas
TDLINE: Wisconsin
TDLINE: Illinois
TDLINE: Michigan
TDLINE: Indiana
TDLINE: Ohio
TDLINE: Kentucky
TDLINE: Tennessee
TDLINE: Louisiana
TDLINE: Mississippi
TDLINE: Alabama
TDLINE: East Region
TDLINE: Maine
TDLINE: New Hampshire
TDLINE: Vermont
TDLINE: Massachusetts
TDLINE: New York
TDLINE: Rhode Island
TDLINE: Connecticut
TDLINE: New Jersey
TDLINE: Delaware
TDLINE: Maryland (Excluding areas noted in NCR above)
TDLINE: Pennsylvania
TDLINE: Virginia (Excluding areas noted in NCR above)
TDLINE: West Virginia
TDLINE: Georgia
TDLINE: North Carolina
TDLINE: South Carolina
TDLINE: Florida
TDLINE: UNICOR will bear none of the operational costs associated with design
TDLINE: and space planning services performed in the Continental United States.
TDLINE: This includes, but is not limited to, salaries, benefits, office costs,
TDLINE: office expenses, and travel costs. This shall be considered a cost of
TDLINE: doing business and will be the sole responsibility of the successful
TDLINE: offeror. However, design and space planning services performed OCONUS
TDLINE: will be reimbursed for cost to include airfare, lodging and rental car,
TDLINE: in accordance with GSA travel regulations.
TDLINE: Design/space planning services conducted outside of the continental
TDLINE: United States will be quoted on a project by project basis.
TDLINE: Product to be designed and space planned may consist of but not limited
TDLINE: to:
TDLINE: Systems
TDLINE: Movable/Demountable Walls
TDLINE: Privacy Screens/Panels
TDLINE: Work Surfaces
TDLINE: Storage Products
TDLINE: Miscellaneous Office Enhancements
TDLINE: UNICOR Case Goods Product Line
TDLINE: Baritone Wood
TDLINE: Integrate Laminate
TDLINE: Harmony Laminate
TDLINE: Relevate Wood
TDLINE: UNICOR Seating
TDLINE: Ergonomic Task
TDLINE: Lounge (1 place, 2 place and 3 place Seating)
TDLINE: Executive
TDLINE: Guest and Reception
TDLINE: Drafting Stools
TDLINE: Stacking Chairs
TDLINE: Tables
TDLINE: Breakroom Conference
TDLINE: Occasional
TDLINE: Training/Classroom
TDLINE: Float
TDLINE: Coffee Table
TDLINE: End Table
TDLINE: Sofa Table
TDLINE: Files/Bookcases/Storage
TDLINE: Lateral files - Wood, Metal and Laminate (2, 3, 4 and 5 high)
TDLINE: Stationary/Mobile Storage Pedestals - Wood, Metal and Laminate
TDLINE: Vertical filing Systems - Wood, Metal and Laminate (4 and 5 high)
TDLINE: Bookcases - Wood, Metal and Laminate (2, 3, 4 and 5 high)
TDLINE: Accessories
TDLINE: Wood Accessories
TDLINE: Monitor Arms
TDLINE: Ergonomic Keyboards
TDLINE: Mouse Pads
TDLINE: CPU Holder and Mount
TDLINE: Desk Lights
TDLINE: Access Rails
TDLINE: Cable Management
TDLINE: Designers may be required to attend pre-site meetings.
TDLINE: PRICING
TDLINE: All pricing shall be based on the US Department of Labor Wage
TDLINE: Determination.
TDLINE: After contract award, offeror(s) may be required to provide special
TDLINE: pricing for various customers.
TDLINE: NOTE: UNICOR may add services to the contract at a later date through a
TDLINE: modification to the awarded contract.
TDLINE: Offeror(s) shall only utilize the attached Excel spreadsheet and submit
TDLINE: pricing for design/space planning services for the National Capital
TDLINE: Region and all other regions as listed above.
TDLINE: All projects outside the continental United States will be priced on a
TDLINE: quote basis. Space planning projects for 5 workstations or less will be
TDLINE: performed at no charge to UNICOR or its customers (excluding
TDLINE: reconfigurations, relocations, SSA projects, or other interagency
TDLINE: agreements where the customer is paying for specific services). The no
TDLINE: charge for 5 workstations or fewer shall only apply to the initial site
TDLINE: visit and original drawing package. Each additional site visit and/or
TDLINE: modification to the original drawing package will be charged based on
TDLINE: the standard rates contained within.
TDLINE: There will be no differentiation in pricing for Systems and Freestanding
TDLINE: product.
TDLINE: Pricing for services will be based on the number of workstations and the
TDLINE: following:
TDLINE: DC Region with Site Visit Unprepared
TDLINE: DC Region with Site Visit Prepared
TDLINE: DC Region with Site Visit Conversion
TDLINE: DC Region with Site Visit Verification
TDLINE: DC Region without Site Visit Unprepared
TDLINE: DC Region without Site Visit Prepared
TDLINE: DC Region without Site Visit Conversion
TDLINE: DC Region without Site Visit Verification
TDLINE: All Other Regions with Site Visit Unprepared
TDLINE: All Other Regions with Site Visit Prepared
TDLINE: All Other Regions with Site Visit Conversion
TDLINE: All Other Regions with Site Visit Verification
TDLINE: All Other Regions without Site Visit Unprepared
TDLINE: All Other Regions without Site Visit Prepared
TDLINE: All Other Regions without Site Visit Conversion
TDLINE: All Other Regions without Site Visit Verification
TDLINE: OCONUS (Plus Expenses) Unprepared
TDLINE: OCONUS (Plus Expenses) Prepared
TDLINE: OCONUS (Plus Expenses) Conversion
TDLINE: OCONUS (Plus Expenses) Verification
TDLINE: In addition, offeror(s) shall provide an hourly rate for only the
TDLINE: following:
TDLINE: •,,Design/space planning above the one major and one minor changes.
TDLINE: •,,Partial services required to complete projects initially planned by
TDLINE: UNICOR or the customer.
TDLINE: •,,On-site design service.
TDLINE: •,,Supplying budget cost estimates and or take-offs using block layouts
TDLINE: provided by UNICOR or the customer.
TDLINE: •,,Development of drawings required by the customer other than standard
TDLINE: plans (floor plans, electrical plans, installation drawings, key alike)
TDLINE: such as isometric or perspective drawings of typicals or areas;
TDLINE: elevations of typicals.
TDLINE: •,,Miscellaneous design services shall be approved in writing by
TDLINE: UNICOR’s Chief of Sales.
TDLINE: Successful offeror will be required to have a point of contact and an
TDLINE: alternate to set up designers for projects and to ensure the contact is
TDLINE: made with the customer within 72 hours after receipt of task order.
TDLINE: All designers shall perform in a professional manner at all times. Upon
TDLINE: completion of the design/space plan, the offeror shall submit the space
TDLINE: plan and bill of material to the customer and provide a copy to the
TDLINE: sales person and UNICOR project manager. A list of sales persons and
TDLINE: project managers will be provided after contract award.
TDLINE: Successful offeror shall provide and maintain a detailed list of all
TDLINE: designers to include but not limited to:
TDLINE: Name
TDLINE: Location
TDLINE: Phone Number
TDLINE: Email
TDLINE: Territory to be covered
TDLINE: This information shall be provided as part of the written proposal
TDLINE: utilizing a 1 page color-coded, map format. Also, it shall be kept up to
TDLINE: date and provided to the Chief of Sales and Chief of Project Management
TDLINE: bi-annually. Offeror(s) is to notify UNICOR Contracting Officer, Chief
TDLINE: of Sales and Chief of Project Managers in writing of any changes to the
TDLINE: list of designers.
TDLINE: FPI's intention is to award a single award contract.
TDLINE: Successful offeror(s) shall ensure that designers are able to pass
TDLINE: security requirements as set forth by the agency. This may vary based on
TDLINE: level of security at site. Offeror will be responsible for verifying
TDLINE: on-site security requirements prior to conducting a site visit. All
TDLINE: staff must complete and pass an NCIC check. Forms are provided in the
TDLINE: attachments and must be completed and returned with written proposal.
TDLINE: Offeror(s) shall provide one (1) major and one (1) minor revisions as
TDLINE: part of the standard pricing structure.
TDLINE: TERMINOLOGY AND CONCEPT DEFINITION FOR PLANNING
TDLINE: PROJECT DEFINITIONS
TDLINE: Project - A single geographic location (e.g. one city, one military base
TDLINE: ,) and a single building location that has one point of contact. When
TDLINE: multiple geographic locations, multiple building locations or multiple
TDLINE: points of contact exist, the quantity of locations, buildings or
TDLINE: contacts and their respective workstation count will determine the
TDLINE: number of projects. UNICOR will be required to qualify their customer
TDLINE: and correctly identify the number of projects using the definition
TDLINE: above. The workstation typical drawings must include a plan view of the
TDLINE: workstation and a listing of product specified either (1) specifically,
TDLINE: using the manufacturer’s model number, description, sizes and finish
TDLINE: options or (2) generically, giving the type of furniture component (ex:
TDLINE: powered panel, overhead storage unit with door, mobile pedestal, work
TDLINE: surface, etc.), description, sizes and finish options. All space
TDLINE: allocation, workstation placement and code adherence (building, GSA,
TDLINE: local, city, state, etc.) will be the responsibility of the firm
TDLINE: generating the "prepared" plan. All dimensional modularity issues must
TDLINE: also be resolved by the firm generating the plan. The plans and
TDLINE: information must be prepared by a professional interior design,
TDLINE: architectural or engineering firm.
TDLINE: Drawings - The drawing package consists of blocking, typicals, furniture
TDLINE: plans drawings, and electrical plan drawings. This includes one major
TDLINE: and one minor revision; additional revisions will be done on a quote
TDLINE: basis.
TDLINE: Final Bill of Materials - Final bill of materials will be sent to the
TDLINE: customer within ten (10) calendar days after approval of the plans by
TDLINE: the customer.
TDLINE: Initial contact - Contact with customer shall take place within 72 hours
TDLINE: after issuance of a task order by UNICOR, regardless of the number of
TDLINE: workstations.
TDLINE: Initial Drawings - Initial set of plans (up to 50 workstations) will be
TDLINE: sent to the customer within ten (10) calendar days after the site visit
TDLINE: or initial contact.
TDLINE: Site Visit - At the customer's or UNICOR’s direction, the Contractor
TDLINE: will conduct a site visit to gather all appropriate information to
TDLINE: ensure that a space plan can be completed for that location.
TDLINE: Scale Price - Variable prices for installation of product that increase
TDLINE: or decrease based upon the quantity installed.
TDLINE: Delivery/Task Order - An order for supplies/services placed against an
TDLINE: established contract or with Government sources. A task order for
TDLINE: services will be issued before design/space planning services or site
TDLINE: visits will begin.
TDLINE: PROJECT SIZE CHANGES
TDLINE: As project's initial size, in terms of number of workstations, may go up
TDLINE: or down after the initial site visit; charges incurred for each separate
TDLINE: phase as the project is completed will be billed according to the number
TDLINE: of workstations done for that phase.
TDLINE: DESIGN AND SPACE PLANNING PLAN DEFINITIONS
TDLINE: Prepared Plan - architectural plans and information that include a
TDLINE: dimensionally accurate building shell drawing, a block layout of the
TDLINE: proposed workstation configuration and drawings of the workstation
TDLINE: typicals. The block plan must have workstation typical types designated,
TDLINE: the orientation of their respective layouts indicated and the doorway
TDLINE: opening of each workstation identified.
TDLINE: The workstation typical drawings must include a plan view of the
TDLINE: workstation and a listing of product specified either (1) specifically,
TDLINE: using the manufacturer’s model number, description, sizes and finish
TDLINE: options or (2) generically, giving the type of furniture component (ex:
TDLINE: powered panel, overhead storage unit with door, mobile pedestal, work
TDLINE: surface, etc.), description, sizes and finish options.
TDLINE: All space allocation, workstation placement and code adherence
TDLINE: (building, GSA, local, city, state, etc.) will be the responsibility of
TDLINE: the firm generating the "prepared" plan. All dimensional modularity
TDLINE: issues must also be resolved by the firm generating the plan. The plans
TDLINE: and information must be prepared by a professional interior design,
TDLINE: architectural or engineering firm.
TDLINE: Unprepared Plan - Any plan provided to the government/contractor that
TDLINE: does not meet the requirements of a "prepared plan” as defined above.
TDLINE: Conversion - All CAD work done in AutoCAD with building shell and
TDLINE: details completed in generic or competitors CAD blocks.
TDLINE: Verification - a quality assurance system of checks prior to issuing any
TDLINE: bill of materials and drawings to the customer.
TDLINE: FACILITIES MANAGEMENT CAD SYSTEM (FMCS)
TDLINE: The Facilities Management CAD System (FMCS) software was developed and
TDLINE: is supported by
TDLINE: Engineering to assist in developing modular office systems layouts.
TDLINE: The software is designed to work as an overlay to a designer’s CAD
TDLINE: software incorporating the standard Auto-Cad commands as well as
TDLINE: specialized ones specific to systems and freestanding furniture. The
TDLINE: Auto-Cad platform was chosen because of its wide acceptance as an
TDLINE: industry standard for Architectural and Facilities Planning. Auto-Cad's
TDLINE: other advantage is that it easily customized, and can be adapted to
TDLINE: handle unique possibilities. The Auto-Cad and FMCS is PC based.
TDLINE: WORKSTATION DEFINITIONS
TDLINE: Systems Furniture - The space and furniture components, either panel
TDLINE: wrapped or panel-supported, required to accommodate one person. The
TDLINE: furniture components may include, but not be limited to, panels, work
TDLINE: surfaces, storage components and seating. Workstations that have the
TDLINE: ability to accommodate more than one person is a shared application,
TDLINE: which will be counted by the number of occupants.
TDLINE: Free Standing Furniture - Space and furniture components, self-supported
TDLINE: and without panel separation, required to accommodate one person. The
TDLINE: furniture components may include, but not be limited to, desks,
TDLINE: credenzas, tables, storage components and seating.
TDLINE: Task areas - Support functions such as shared equipment, mail sorting,
TDLINE: printers and copiers etc., will be counted as half of a workstation and
TDLINE: identified on both the floor plan and bill of materials. In stations

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .