FIRE PROTECTION DRAWING SET.pdf
PDF 3 MB Posted
- Attached to
- Z2AA - Renovate Historic Building 4 Federal contract opportunity
- Solicitation number
- 36C24624R0030
About this file
This document is a set of fire protection demolition and new construction plans for the renovation of Historic Building 4 at the Fayetteville VA Medical Center. The project involves a complete renovation of the existing building for administrative space and offices, with necessary upgrades to the mechanical, plumbing, electrical, and fire protection systems.
The key details include:
- Removal of the existing fire sprinkler system and installation of a new automatic wet pipe fire protection system in accordance with NFPA 13 and VA requirements.
- The new fire suppression system will include a 6-inch double check valve assembly, 6-inch underground piping, 4-inch and 2-inch distribution piping, and sprinklers throughout the building.
- The building will be fully sprinklered with sprinklers sized based on the hazard classifications (light, ordinary hazard group 1, ordinary hazard group 2).
- The project is designated as Mission Critical and must comply with VA Physical Security and Resiliency Design Manual requirements.
- This project is part of Solicitation #36C24624R0030 for the "Renovate Historic Building 4" at the Fayetteville VA Medical Center.
View the file
Other files for this federal contract opportunity
Show all 50
Z2AA - Renovate Historic Building 4 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRAWL SPACE
003A
MECHANICAL
OFFICE
ASSOCIATE CHIEF, CPS
PHARMACY RESIDENTS
FEMALE TOILET
MALE TOILET
AFGE STORAGE OFFICE
MECHANICAL
TRAINING ROOM
AFGE LIASISON OFFICE
STORAGE
STORAGE
007A
MECHANICAL ROOM
007B
STORAGE
STAIRS
4" FP
4" FP
4" FP4" FP
4" FP UP
1 1/2" FP
FP DRAIN
FP HOSE
CONNECTION
UG 4" FP
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:5
P
M
FD100
BASEMENT FIRE PROTECTION
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
BASEMENT FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 REFER TO SITE UTILITY DRAWINGS FOR CONTINUATION.
2 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
3 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
4 REMOVE FIRE DEPARTMENT CONNECTION AND ASSOCIATED PIPING. PATCH WALL TO MATCH
EXISTING.
No. Revisions: Date:
REV 0 07/24/2023
07/24/2023
OFFICE
STORAGE
RESTROOM
OFFICE
STAIRS
OFFICE
RESTROOM
HOUSEKEEPING
OFFICE
CLOSET
109A
CLOSET
108A
CLOSET
107A
OFFICE
OFFICE
OFFICE
CLOSET
105A
BREAK
OFFICE
107B
OFFICE
CLOSET
104A
OFFICE
OFFICE
OFFICE
WAITING/ENTRY
OFFICE
CLASSROOM
CLASSROOM
OFFICE
4" FP UP & DN
1 2
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:0
P
M
FD101
FIRST FLOOR FIRE PROTECTION
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
2 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
No. Revisions: Date:
OFFICE
CLOSET
216A
OFFICE
CLOSET
215A
RESTROOM
215B
OFFICE
RESTROOM
213B
CLOSET
213A
KITCHEN
STAIRS
114MEN
WOMEN
HOUSEKEEPING
OFFICE
CLOSET
208A
OFFICE
CLOSET
207A
CLOSET
206A
OFFICE
OFFICE
CLOSET
205A
RESTROOM
205B
RESTROOM
203B
OFFICE
CLOSET
203A
OFFICE
CLOSET
202A
RESTROOM
202B OFFICE
OFFICE
CLOSET
219A
RESTROOM
219B
CLOSET
201A
RESTROOM
218B
CLOSET
218A
OFFICE
OFFICE
4" FP UP & DN
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:0
P
M
FD102
SECOND FLOOR FIRE
PROTECTION DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
2 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
No. Revisions: Date:
2" FP
2" FP
1 1/2" FP
1 1/2" FP
2" FP
2" FP2" FP
2" FP
4" FP DN 1
A. REMOVE ALL FIRE SPRINKLER PIPING AND ACCESSORIES IN ENTIRE BUILDING. A NEW AUTOMATIC
WET PIPE FIRE SPRINKLER SYSTEM WILL BE INSTALLED IN THE NEW WORK PHASE OF
CONTRCUTION. REFER TO FX DRAWINGS.
B. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:1
P
M
FD103
ATTIC FIRE PROTECTION
DEMOLITION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
ATTIC FIRE PROTECTION DEMOLITION PLAN
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 PATCH FLOOR PENETRATION TO MATCH EXISTING AFTER REMOVAL OF PIPING.
2 REMOVE FIRE SPRINKLER PIPING AND ASSOCIATED VALVES AND HOSE CONNECTIONS.
No. Revisions: Date:
6" DOUBLE
CHECK VALVE
6" SWING CHECK VALVE &
ALARM FLOW SWITCH
FPFP
STAIR A
S000A
ELEVATOR
E000
ELEC RM
E001
PIV VISITOR
GROUND DEFENSE TRAINING
PIV STAFF
STORAGE
DETECTIVE
TRAINING SARGENT
COMM DEVICE STO.
EVIDENCE STO.
PIV PICTURE RM
DEPUTY CHIEF
CHIEF
ADMIN/PIV/CHECK IN
EAST CORRIDOR
EMERGENCY MANAGER
BREAK/WORK RM
TOILET
007B
STAIR B
S000B
ELEC/UTILITY
F I R E H A Z A R D L E G E N D
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
PIV STORAGE
ARMORY
SECURE CAGE
TOILET
006B
SHOWER
006A
H.C.SUPP.
WOMEN
SHOWER
007A
MEN
H.C.
FX501
UG 6" FP
FIRE DEPARTMENT
CONNECTION
6" FP
MAJOR OFFICE
SOUTH CORRIDOR
SUPPLY
FX501
6" FP
4" FP UP
2" FP DRAIN UP
FP
SOUTH CORRIDOR
NORTH CORRIDOR
STORAGE
ELEV LOBBY
2" FP DRAIN
4" FP
6" FP
FX501
UTILITY
2" FP
1" FP DRAIN
DRAIN
ELEV MACHINE RM
E002
6'x6'x2' PLUMBING
DRAINAGE PIT
4" BYPASS
PIPE
4" NC CONTROL VALVE WITH
SUPERVISORY SWITCH
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:1
P
M
FX100
BASEMENT FIRE SUPPRESSION
PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
BASEMENT FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO SITE UTILITY DRAWINGS FOR CONTINUATION.
2 CORE DRILL THROUGH FOUNDATION WALL FOR INSTALLATION OF NEW UNDERGROUND PIPING.
PROVIDE PIPE SLEEVE AND SEAL AROUND PENETRATION. REFER TO PIPE PENETRATION THROUGH
WALLS BELOW GRADE DETAIL ON SHEET PL501.
3 REFER TO FIRE SERVICE SECTIONS ON SHEET FX501 FOR WORK IN THIS AREA.
4 CORE DRILL THROUGH WALL FOR PIPE PENETRATION. PROVIDE PIPE SLEEVE AND SEAL AROUND
PENETRATION.
5 REFER TO FIRE RISER SECTION ON SHEET FX501 FOR WORK IN STAIRWELL.
6 INSTALL SIDEWALL SPRINKLER NOT MORE THAN 2'-0" ABOVE FLOOR OF ELEVATOR PIT. REFER TO
PLUMBING DRAWINGS FOR ELEVATOR PIT SUMP PUMP.
7 PIPING DISCHARGES TO PLUMBING DRAINAGE PIT. REFER TO ARCHITECTURAL AND STRUCTURAL
DRAWINGS FOR LOCATION OF PLUMBING DRAINAGE PIT.
8 REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR PLUMBING DRAINAGE PIT.
No. Revisions: Date:
4" FP UP & DN
FP
FP
FP
STAIR A
S100A
ELEVATOR
E100
ELEV LOBBY
SECURITY SCREEN AREA
QUALITY SAFETY STAFF
SYSTEM REDESIGN STAFF
QUALITY SAFETY SUP
WEST CORRIDOR
QUALITY MANAGER
CONFERENCE/INCIDENT
COMMAND
VOLUNTARY SERVICE
TR
SOUTH CORRIDOR
SHAFTELEC
STAIR B
S100B
MEN
WOMEN
BREAK/WORK RM
CHIEF, SYSTEM REDESIGN
EAST CORRIDOR
LEAF COORD OFFICE
LEAF COORD STAFF
F I R E H A Z A R D L E G E N D
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
ENCLOSURE
SUPPLY
FX501
FP
2" FP DRAIN UP & DN
NORTH CORRIDOR
PORTICO NORTH
PORTICO SOUTH
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:1
P
M
FX101
FIRST FLOOR FIRE SUPPRESSION
PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO FIRE RISER SECTION ON SHEET FX501 FOR WORK IN STAIRWELL.
No. Revisions: Date:
FP
FP
STAIR A
S200B
ELEV LOBBY
ELEVATOR
E200
ELEV LOBBY
CHIEF OF STAFF
SECRETARY
SECRETARY
ASSISTANT DIRECTOR
VISITOR
SECRETARY
NURSE EXECUTIVE
HSS
HSS
HSS
HSS
PUBLIC AFFAIRS
COMPLIANT OFFICER
ASSOCIATE DIRECTOR
SECRETARY
SECRETARY
SUPPLY
PRIVATE TOILET
DIRECTOR
STAIR B
S201B
SHAFTELEC
WOMEN
BREAK/WORK RM
RECEP/WAITING
F I R E H A Z A R D L E G E N D
LIGHT HAZARD
ORDINARY HAZARD GROUP 1
ORDINARY HAZARD GROUP 2
EAST CORRIDOR
4" FP UP & DN
NORTH CORRIDOR
NORTH CORRIDOR-3
216-3
NORTH CORRIDOR-2
216-2
NORTH CORRIDOR-1
216-1
ENCLOSURE
SOUTH CORRIDOR-1
216-1
SUPPLY
FX501 1 1/2" FP DRAIN UP & DN
NORTH CORRIDOR
SOUTH CORRIDOR
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:2
P
M
FX102
SECOND FLOOR FIRE
SUPPRESSION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
SECOND FLOOR FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO FIRE RISER SECTION ON SHEET FX501 FOR WORK IN STAIRWELL.
No. Revisions: Date:
4" FP DN
FX501
F I R E H A Z A R D L E G E N D
ORDINARY HAZARD GROUP 1
1 1/2" FP DRAIN DN
FP
FPFP
FP
FPFP
FP FP FP
ATTIC
FX501
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD GROUP I
ORDINARY HAZARD GROUP II
0.10 GPM/SF OVER 1500 SF
0.15 GPM/SF OVER 1500 SF
0.20 GPM/SF OVER 1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 225 SF
1 SPRINKLER PER 130 SF
1 SPRINKLER PER 130 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:2
P
M
FX103
ATTIC FIRE SUPPRESSION PLAN
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
N 1/4" = 1'-0"
ATTIC FIRE SUPPRESSION PLAN
G E N E R A L N O T E S :D R A W I N G N O T E S :
1 REFER TO FIRE SERVICE SECTIONS ON SHEET FX501 FOR WORK IN THIS AREA.
No. Revisions: Date:
1ST FLOOR
0'-0"
BASEMENT
-10'-0"
6" DOUBLE CHECK
DETECTOR VALVE
WITH SUPERVISORY
SWITCHES UG 6" FP
FROM SITE
6" SWING CHECK VALVE
WITH PRESSURE GAUGES &
DRAIN CONNECTION
MAIN DRAIN VALVE
6" WATER FLOW ALARM
SWITCH WITH RETARD
UTILITY ROOM FLOOR
2" DRAIN OUTLET
TO PLUMBING
DRAINAGE PIT
EXTERIOR FIRE
DEPARTMENT CONNECTION
6" FP
GRADE
1" DRAIN OUTLET TO
PLUMBING DRAINAGE PIT
1" FP DRAIN
BALL DRIP VALVE
4" CHECK VALVE
FX501
EXTERIOR WALL
CRAWL SPACE
-8'-0"
6" FP
4" FP
NORMALLY CLOSED CONTROL
VALVE WITH SUPERVISORY SWITCH
FOR FORWARD FLOW BACKFLOW
PREVENTER TESTING
4" BYPASS PIPE
1ST FLOOR
0'-0"
BASEMENT
-10'-0"
2ND FLOOR
11'-0"
ATTIC
21'-2"
FIRE HOSE
CONNECTION VALVE
FIRE HOSE
CONNECTION VALVE
FIRE HOSE
CONNECTION VALVE
6" FP
2" FP DRAIN
4" FP
4" FP
4" FP
4" FP
4" FP TO ATTIC
INSPECTOR'S TEST AND
DRAIN CONNECTION
1 1/2" FP
DRAIN
1 1/2" FP DRAIN
1 1/2" FP DRAIN
2" FP DRAIN RISER
2" FP DRAIN RISER
4" FP RISER
INSPECTOR'S TEST AND
DRAIN CONNECTION
INSPECTOR'S TEST AND
DRAIN CONNECTION
INDICATING TYPE
CONTROL VALVE WITH
SUPERVISORY SWITCH
CHECK VALVE
PRESSURE GAUGE
WATERFLOW SWITCH
INDICATING TYPE
CONTROL VALVE WITH
SUPERVISORY SWITCH
CHECK VALVE
PRESSURE GAUGE
WATERFLOW SWITCH
INDICATING TYPE
CONTROL VALVE WITH
SUPERVISORY SWITCH
CHECK VALVE
PRESSURE GAUGE
WATERFLOW SWITCH
1 1/2" FP DRAIN RISER
FROM ATTIC
6" FP
2" FP DRAIN TO
UTILITY 002
4" FP
1 1
ATTIC
21'-2"
ATTIC
21'-2"
4" FP
PRESSURE GAUGE
WATERFLOW SWITCH
CHECK VALVE
INDICATING TYPE CONTROL VALVE
WITH SUPERVISORY SWITCH
INSPECTOR'S TEST AND
DRAIN CONNECTION
1-1/2" FP DRAIN
4" FP RISER
1ST FLOOR
0'-0"
BASEMENT
-10'-0"
1ST FLOOR
0"
BASEMENT
-10'-0"
STAIR LANDING
-5'-0"
CRAWL SPACE
-8'-0"
WEST STAIR GRADE
-2'-7"
FX501
4" FP
6" FP
6" FP FROM SITE
BALL DRIP
VALVE
1" FP DRAIN
4" CHECK
VALVE
4" FP TO EXTERIOR FDC & BYPASS
FOR FORWARD FLOW BACKFLOW
PREVENTER TESTING
UTILITY ROOM FLOOR
CRAWL SPACE
-8'-0"
A. INSTALL COMPLETE AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA
13 AND VA FIRE PROTECTION MANUAL.
B. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH
EQUIPMENT CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND
COVERAGE.
C. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
D. PROVIDE AUXILIARY DRAIN WHERE CHANGE IN PIPING DIRECTION PREVENTS DRAINAGE OF
SYSTEM PIPING THROUGH MAIN DRAIN VALVE.
E. CONTRACTOR SHALL DETERMINE PIPE SIZES BY HYDRAULIC CALCULATION AND SUBMIT
SPRINKLER DESIGN.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES.
EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON PLANS IS TO CONVEY DESIGN INTENT AND
DOES NOT DICTATE THE MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO ALL HAZARD
CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE ALARM ZONES, SMOKE
PARTITIONS, AND FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS.
I. REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /F a y e tt e v ill e N
C V
A
B ld g
R e n o v a ti o n
/F F
E
F a y e tt e v ill e
R e n o v a te B
M E
P rv t
/2
/2
:0
:3
P
M
FX501
FIRE SUPPRESSION SECTIONS
AND DETAILS
07/24/2023 PP GP
RENOVATE HISTORIC BUILDING 4 565-20-101
2300 RAMSEY STREET, FAYETTEVILLE, NC 28301
ISSUED FOR
CONSTRUCTION 4
FAYETTEVILLE
VA MEDICAL
CENTER Approved: FAYETTEVILLE VA MEDICAL CENTER
1/2" = 1'-0"
FIRE SERVICE SECTION 1
1/2" = 1'-0"
FIRE RISER SECTION - STAIR B
1/2" = 1'-0"
FIRE RISER SECTION - ATTIC
1/2" = 1'-0"
FIRE SERVICE SECTION 2
G E N E R A L N O T E S :
D R A W I N G N O T E S :
1 CORE DRILL THROUGH FLOOR FOR INSTALLATION OF PIPE PENETRATING FLOOR. REFER TO
SUPPORT/ANCHOR FOR PIPE RISERS DETAILS ON SHEET PL501.
No. Revisions: Date:
| 10.00_FD100 - BASEMENT FIRE PROTECTION DEMOLITION PLAN |
| FD100 - BASEMENT FIRE PROTECTION DEMOLITION PLAN |
| 10.01_FD101 - FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN |
| FD101 - FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN |
| 10.02_FD102 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN |
| FD102 - SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN |
| 10.03_FD103 - ATTIC FIRE PROTECTION DEMOLITION PLAN |
| FD103 - ATTIC FIRE PROTECTION DEMOLITION PLAN |
| 10.04_FX100 - BASEMENT FIRE SUPPRESSION PLAN |
| FX100 - BASEMENT FIRE SUPPRESSION PLAN |
| 10.05_FX101 - FIRST FLOOR FIRE SUPPRESSION PLAN |
| FX101 - FIRST FLOOR FIRE SUPPRESSION PLAN |
| 10.06_FX102 - SECOND FLOOR FIRE SUPPRESSION PLAN |
| FX102 - SECOND FLOOR FIRE SUPPRESSION PLAN |
| 10.07_FX103 - ATTIC FIRE SUPPRESSION PLAN |
| FX103 - ATTIC FIRE SUPPRESSION PLAN |
| 10.08_FX501 - FIRE SUPPRESSION SECTIONS AND DETAILS |
| FX501 - FIRE SUPPRESSION SECTIONS AND DETAILS |
File details come from the government source that posted it. Updated .