Statement of Work - Renovate Historic Building 4.pdf

PDF 109 KB Posted

Attached to
Z2AA - Renovate Historic Building 4 Federal contract opportunity
Solicitation number
36C24624R0030
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

The document is a Statement of Work (SOW) for the Renovation of Historic Building 4 at the Fayetteville VA Medical Center in North Carolina. The project consists of a complete renovation of the existing historic building to provide administrative space and offices, along with necessary support and utility requirements. The renovation must comply with VA Physical Security and Resiliency Design Manual (PSRDM) requirements for Mission Critical structures and will include an addition for an elevator and code-compliant stairwells. Exterior renovations will be done per National and State Historic Preservation Office (SHPO) requirements. The project will modernize the space with new mechanical, plumbing, electrical, and fire protection systems, utilizing Revit and Building Information Modeling (BIM) at a minimum LOD 300. The project requires asbestos and lead abatement, and relocation of existing underground utilities. The estimated construction duration is 545 calendar days from the Notice to Proceed. This SOW is related to Solicitation Number 36C24624R0030 for the "Z2AA - Renovate Historic Building 4" project, issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 6.

View the file

Other files for this federal contract opportunity

Other files attached to Z2AA - Renovate Historic Building 4, newest first.
File Type Posted
36C24625C0027_1 Award Notice.docx DOCX document
230923 Direct-Digital Control System Connect to Existing N4.pdf PDF
1_b H - Renovate Building 4 IFC pages 12-14.pdf PDF
1_a G - Renovate Building 4 IFC page 1.pdf PDF
1_a G - Renovate Building 4 IFC pages 2-3.pdf PDF
1_a G - Renovate Building 4 IFC pages 4-6.pdf PDF
1_a G - Renovate Building 4 IFC pages 7-10.pdf PDF
2_C - L and S - Renovate Building 4 IFC pages 15-35.pdf PDF
4_FP and P - Renovate Building 4 IFC pages 86-109.pdf PDF
36C24624R0030 0005.docx DOCX document
3_Arch - Renovate Building 4 IFC pages 36-85.pdf PDF
5_Mech - Renovate Building 4 IFC pages 110-128.pdf PDF
6_Elec - Renovate Building 4 IFC pages 129-155.pdf PDF
Drawings.zip ZIP file
36C24624R0030 0004.docx DOCX document
INSTRUCTIONS CONDITIONS AND OTHER STATEMENTS TO BIDDERS-OFFERORS .docx DOCX document
Proposal Item I Cost Breakdown.xlsx XLSX spreadsheet
Fayetteville - Temp Fence.pdf PDF
230541 - NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT.pdf PDF
230512 - GENERAL MOTOR REQUIREMENTS FOR HAVAC AND STEAM GENERATION EQUIPMENT.pdf PDF
014529 - TESTING LABORATORY SERVICES.pdf PDF
234000 - HVAC AIR CLEANING DEVICES.pdf PDF
232300 - REFRIGERANT PIPING.pdf PDF
Proposal Item V Cost Breakdown.xlsx XLSX spreadsheet
Asbestos - Lead Paint Survey 12-31-2020.pdf PDF
Geotech Report_Fayetteville Bldg 4 Renovation.pdf PDF
230593 - TESTING ADJUSTING AND BALANCING FOR HVAC.pdf PDF
238129 - VARIABLE REFRIGERANT FLOW HVAC SYSTEMS.pdf PDF
230923 - DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.pdf PDF
238143 - AIR SOURCE UNITARY HEAT PUMPS.pdf PDF
230800 - COMMISSIONING OF HVAC SYSTEMS.pdf PDF
36C24624R0030 0003.docx DOCX document
Proposal Item II Cost Breakdown.xlsx XLSX spreadsheet
Proposal Item III Cost Breakdown.xlsx XLSX spreadsheet
Proposal Item IV Cost Breakdown.xlsx XLSX spreadsheet
PL902 - PLUMBING DOMESTIC WATER ISOMETRICS.pdf PDF
232113 - Hydronic Piping.pdf PDF
233400 - HVAC FANS.pdf PDF
238216 - AIR COILS.pdf PDF
238200 - CONVECTION HEATING AND COOLING UNITS.pdf PDF
36C24624R0030 0002.docx DOCX document
STRUCTRAL DRAWING SET.pdf PDF
Specifications - Renovate Building 4 Issued For Construction.pdf PDF
Wage Determination.pdf PDF
PLUMBING DRAWING SET.pdf PDF
MECHANICAL DRAWING SET.pdf PDF
LANDSCAPE DRAWING SET.pdf PDF
FIRE PROTECTION DRAWING SET.pdf PDF
ELECTRICAL DRAWING SET.pdf PDF
CIVIL DRAWING SET.pdf PDF
Show all 50

Z2AA - Renovate Historic Building 4 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Project # 565-20-101 VAMC FAYETTEVILLE NC

Fayetteville VA Medical Center Renovation of Historic Building 4

Project Address Fayetteville VAMC

2300 Ramsey Street Fayetteville, NC 28301

Description of Work This project consists of a complete renovation of the existing Historic Building 4 for administrative space and offices along with necessary support and utility requirements. This is designated as Mission Critical and must comply with VA Physical Security and Resiliency Design Manual (PSRDM) requirements for Mission Critical structures as incorporated in this design and the specifications. The project provides an addition for an elevator with access to all levels, and addresses life safety egress issues with the addition of code-compliant stairwells. Exterior renovations of the historical building will be renovated per National and State Historic Preservation Office (SHPO) requirements outlined in the specifications and drawings. The project will modernize the space with the most current level of technology and design including all new mechanical, plumbing, electrical, and fire protections systems. This design was created using Revit and Building Information Modeling (BIM) and all efforts post construction award shall be required to use Revit level of detail (LOD) 300 or higher. The Revit drawings will only be made available to the contractor awarded this project.

This project does require asbestos and lead abatement.

There are underground existing utilities and installations this contactor shall relocate.

There is mobilization and project area located at the building, but pedestrian and vehicle traffic ways must be kept open for facility use. Any additional space required may be remote on the facility or the contractor shall have to find a location off station but will not be compensated by the VA.

See specification section 01 35 26 Safety Requirements for detailed requirements of the Site Superintendent, SSHO, and Quality Control Manager.

The contractor shall provide a mobilization plan along with all other required plans prior to being allowed on this station. MOB plan shall address all temporary utility measures, fence/gates, contractor parking, temporary signage/project signage, materials storage, dumpsters and any other details as requested by the VA COR.

Construction Duration Estimated construction duration of 545 calendar days from issuance of a Notice To Proceed (NTP).

File details come from the government source that posted it. Updated .