This is a Financial Proposal document for the Muscogee County School District in Georgia related to the purchase and installation of video surveillance equipment. The project encompasses security surveillance system installation across all high schools, middle schools, elementary schools, administrative office buildings, maintenance facilities, warehouses, and bus depots within the district. The scope of work requires qualified contractors to provide comprehensive proposals including equipment specifications, installation services, and related security infrastructure for the entire school system. Specific response dates, site visit requirements, bidder's conference details, and contract award timelines should be referenced in the related RFP document for complete project parameters and submission requirements.
The financial proposal evaluation will assess pricing structures, equipment costs, installation fees, and any ongoing maintenance or service agreements proposed by contractors. Additional considerations for proposal evaluation include contractor qualifications, past performance, warranty terms, and financing options. The funding source and total budget allocation for this security surveillance project should be detailed within the district's procurement documents. Contractors should ensure their proposals clearly itemize all costs associated with equipment procurement, labor for installation, project management, and any post-installation support services required by the Muscogee County School District.
Text of this file
Sheet1
APPENDIX B
| FINANCIAL FORM |
| REQUEST FOR PROPOSAL 23-001 |
| PURCHASE AND INSTALLATION OF VIDEO SURVEILLANCE EQUIPMENT |
FOR VARIOUS LOCATIONS
| ITEM | LOCATIONS | TOTAL COST P/LOCATION |
| 1 | Aaron Cohn Middle School (71 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Ten (10) AXIS P3719-PLE | ||
| Four (4) AXIS P3267-LVE | ||
| Two (2) AXIS P3265-LVE | ||
| Interior Cameras: | ||
| Four (4) AXIS P3719-PLE | ||
| Twenty-Four (24) AXIS P3267-LV | ||
| Twenty-Five (25) AXIS P3265-LV | ||
| Two (2) M3058 PLVE | ||
| 2 | Arnold Middle School (76 cameras– confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Seventeen (17) AXIS P3719-PLE | ||
| Fifteen (15) AXIS P3267-LVE | ||
| Interior Cameras: | ||
| Six (6) AXIS P3719-PLE | ||
| Thirty-three (33) AXIS P3267-LV | ||
| Three (3) AXIS P3265-LV | ||
| Two (2) M3058 PLVE | ||
| 3 | Baker Middle School (82 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Fourteen (14) AXIS P3719-PLE | ||
| Nine (9) AXIS P3267-LVE | ||
| Interior Cameras: | ||
| Two (2) AXIS P3719-PLE | ||
| Forty-three (43) AXIS P3267-LV | ||
| Seven (7) AXIS P3265-LV | ||
| Seven (7) M3058 PLVE | ||
| 4 | Blackmon Road Middle School (61 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Five (5) AXIS P3719-PLE | ||
| Eleven (11) AXIS P3267-LVE | ||
| Seven (7) AXIS P3265-LVE | ||
| Five (5) P1448- LE | ||
| Interior Cameras: | ||
| Six (6) AXIS P3719-PLE | ||
| Fourteen (14) AXIS P3267-LV | ||
| Nine (9) AXIS P3265-LV | ||
| Four (4) P1447 LE | ||
| 5 | Carver High School (132 cameras - confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Eight (8) AXIS P3719-PLE | ||
| Sixteen (16) AXIS P3267-LVE | ||
| Interior Cameras: | ||
| Fifteen (15) AXIS P3719-PLE | ||
| Forty-seven (47) AXIS P3267-LV | ||
| Twenty (20) AXIS P3265-LV | ||
| Six (6) P1448 LE | ||
| Twenty (20) M3058 PLVE | ||
| 6 | Columbus High School (129 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Two (2) AXIS P3719-PLE | ||
| Twenty (21) AXIS P3267-LVE | ||
| One (1) AXIS P3265-LVE | ||
| Seven (7) AXIS P1448-LE | ||
| Eight (8) Encoders (existing) | ||
| Interior Cameras: | ||
| Three (3) AXIS P3719-PLE | ||
| Thirty-six (36) AXIS P3267-LV | ||
| Twenty-nine (29) AXIS P3265-LV | ||
| Two (2) P1448 LE | ||
| Twenty (20) M3058 PLVE | ||
| 7 | Double Churches Middle School (66 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Seven (7) AXIS P3719-PLE | ||
| Five (5) AXIS P3267-LVE | ||
| Seven (7) AXIS P1448-LE | ||
| Interior Cameras: | ||
| One (1) AXIS P3719-PLE | ||
| Twenty-four (24) AXIS P3267-LV | ||
| Seventeen (17) AXIS P3265-LV | ||
| Four (4) P1448 LE | ||
| One (1) M3058 PLVE | ||
| 8 | Eddy Middle School (69 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Twelve (12) AXIS P3719-PLE | ||
| Ten (10) AXIS P3267-LVE | ||
| Nine (9) AXIS P3265-LVE | ||
| Two (2) AXIS P1448-LE | ||
| Interior Cameras: | ||
| Six (6) AXIS P3719-PLE | ||
| Twenty-seven (27) AXIS P3267-LV | ||
| Two (2) AXIS P3265-LV | ||
| One (1) M3058 PLVE | ||
| 9 | Fort Middle School (83 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Six (6) AXIS P3719-PLE | ||
| Eight (8) AXIS P3267-LVE | ||
| Eleven (11) AXIS P3265-LVE | ||
| Four (4) AXIS P1448-LE | ||
| Interior Cameras: | ||
| Two (2) AXIS P3719-PLE | ||
| Thirty-three (33) AXIS P3267-LV | ||
| Ten (10) AXIS P3265-LV | ||
| Four (4) AXIS P1448-LE | ||
| Five (5) M3058 PLVE | ||
| 10 | Hardaway High School (89 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Three (3) AXIS P3719-PLE | ||
| Seventeen (17) AXIS P3267-LVE | ||
| Two (2) AXIS P3265-LVE | ||
| Five (5) AXIS P1448-LE | ||
| Interior Cameras: | ||
| Sixteen (16) AXIS P3719-PLE | ||
| Twenty-nine (29) AXIS P3267-LV | ||
| Ten (10) AXIS P3265-LV | ||
| Seven (7) M3058 PLVE | ||
| 11 | Jordan High School (133 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Fourteen (14) AXIS P3719-PLE | ||
| Twenty-one (21) AXIS P3267-LVE | ||
| Eight (8) AXIS P3265-LVE | ||
| One (1) AXIS P1448-LE | ||
| Interior Cameras: | ||
| Three (3) AXIS P3719-PLE | ||
| Fifty-five (55) AXIS P3267-LV | ||
| Twelve (12) AXIS P3265-LV | ||
| Nineteen (19) AXIS M3058-PLVE | ||
| 12 | Kendrick High School (103 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Five (5) AXIS P3719-PLE | ||
| Sixteen (16) AXIS P3267-LVE | ||
| One (1) AXIS P3265-LVE | ||
| Five (5) AXIS P1448-LE | ||
| Interior Cameras: | ||
| Six (6) AXIS P3719-PLE | ||
| Forty-eight (48) AXIS P3267-LV | ||
| Ten (10) AXIS P3265-LV | ||
| Twelve (12) AXIS M3058-PLVE | ||
| 13 | Midland Middle School (68 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Four (4) AXIS P3719-PLE | ||
| Twenty-three (23) AXIS P3267-LVE | ||
| One (1) AXIS P3265-LVE | ||
| Interior Cameras: | ||
| Six (6) AXIS P3719-PLE | ||
| Thirty-two (32) AXIS P3267-LV | ||
| One (1) AXIS P3265-LV | ||
| One (1) AXIS M3058-PLVE | ||
| 14 | Northside High School (141 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Eighteen (18) AXIS P3719-PLE | ||
| Eleven (11) AXIS P3267-LVE | ||
| One (1) AXIS P3058 PLVE | ||
| One (1) AXIS P1448-LE | ||
| Interior Cameras: | ||
| Fourteen (14) AXIS P3719-PLE | ||
| Seventy-two (72) AXIS P3267-LV | ||
| Fourteen (14) AXIS P3265-LV | ||
| Two (2) AXIS P1448-LE | ||
| Eight (8) AXIS M3058-PLVE | ||
| 15 | Richards Middle School (67 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Thirteen (13) AXIS P3719-PLE | ||
| Five (5) AXIS P3267-LVE | ||
| Three (3) AXIS P3265-LVE | ||
| One (1) AXIS P1448-LE | ||
| Interior Cameras: | ||
| Ten (10) AXIS P3719-PLE | ||
| Twenty-one (21) AXIS P3267-LV | ||
| Eleven (11) AXIS P3265-LV | ||
| Three (3) AXIS M3058-PLVE | ||
| 16 | Rothschild Middle School (52 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Twelve (12) AXIS P3719-PLE | ||
| Six (6) AXIS P3267-LVE | ||
| One (1) AXIS P3265-LVE | ||
| Interior Cameras: | ||
| Eight (8) AXIS P3719-PLE | ||
| Seventeen (17) AXIS P3267-LV | ||
| Six (6) AXIS P3265-LV | ||
| Two (2) AXIS M3058-PLVE | ||
| 17 | Shaw High School (126 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Eleven (11) AXIS P3719-PLE | ||
| Four (4) AXIS P3265-LVE | ||
| Eight (8) AXIS P1448-LE | ||
| Ten (10) AXIS P1447-LE | ||
| Interior Cameras: | ||
| Seventeen (17) AXIS P3719-PLE | ||
| Thirty-five (35) AXIS P3267-LV | ||
| Twenty-one (21) AXIS P3265-LV | ||
| Ten (10) AXIS P1448-LE | ||
| Ten (10) AXIS M3058-PLVE | ||
| 18 | Spencer High School (131 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Fifteen (15) AXIS P3719-PLE | ||
| Eighteen (18) AXIS P3267-LVE | ||
| Two (2) AXIS P1447-LE | ||
| Interior Cameras: | ||
| Four (4) AXIS P3719-PLE | ||
| Sixty-three (63) AXIS P3267-LV | ||
| Fourteen (14) AXIS P3265-LV | ||
| Fifteen (15) AXIS M3058-PLVE | ||
| 19 | Veterans Memorial Middle School (62 cameras – confirm with Camera Schedule) | |
| Exterior Cameras: | ||
| Twelve (12) AXIS P3719-PLE | ||
| One (1) AXIS P3267-LVE | ||
| Six (6) AXIS P1447-LE | ||
| Interior Cameras: | ||
| Three (3) AXIS P3719-PLE | ||
| Thirty-one (31) AXIS P3267-LV | ||
| Five (5) AXIS P3265-LV | ||
| Four (4) AXIS M3058-PLVE | ||
| 20 | New Elementary School (79 cameras – confirm with Camera Schedule) | |
| Ten (10) AXIS P3719-PLE | ||
| Ten (10) AXIS P3267-LVE | ||
| Five (5) AXIS P3265-LVE | ||
| Interior Cameras: | ||
| Eleven (11) AXIS P3719-PLE | ||
| Thirty-seven (37) AXIS P3267-LV | ||
| Five (5) AXIS P3265-LV | ||
| One (1) AXIS M3058-PLVE | ||
| 21 | Sports Complex (33 cameras – cameras already installed. Configuration with Genetec system only) | |
| Exterior Cameras: | ||
| AXIS P3719-PLE | ||
| AXIS P3265-LVE | ||
| AXIS P1448-LE | ||
| AXIS P1447-LE | ||
| TOTAL PROJECT COST | $0.00 |
| COMPANY NAME: _______________________________________________________ |
| PRINT NAME: ___________________________________________________________ |
| SIGNATURE: ____________________________________________________________ |
| DATE: ____________________________________ |
&"Times New Roman,Regular"&9&P
Other files
| File | Type | Posted |
|---|---|---|
| Financial Proposal Revised | — | |
| Financial Proposal Revision 2 | — | |
| Equipment Cost | — | |
| Award Information | — | |
| Addendum 2 | — | |
| Addendum 3 | — | |
| Purchase&Installation Cameras | — | |
| Addendum 1 | — | |
| Addendum 4 | — | |
| Equipment Cost Revised | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .