Fiber & Network Requirements
10 KB Posted
- Solicitation number
- 23-34
- Issued by
- Henry County, Georgia
About this file
This is an Invitation to Bid document issued by Henry County, Georgia Purchasing Department for the purchase and installation of equipment on five 2022 Chevrolet Tahoe vehicles for the Police Department's K-9 units. The contractor must furnish all labor, materials, equipment, and services required to complete the installation work. Bids were due on February 23, 2023 at 3:00 p.m. local time at the Henry County Purchasing Department, 140 Henry Parkway, Room 209, McDonough, Georgia 30253. Late bids were not accepted. Bids could not be withdrawn for sixty days following the bid closing deadline, except as permitted by the Official Code of Georgia Annotated. Henry County reserved the right to reject any and all proposals and to waive any technicalities.
West Chatham Warning Devices Inc was awarded the contract in the amount of $126,006.25. No pricing terms, set asides, or renewal options were specified in the document. The bid documents and specifications were available for download from the Purchasing Department office. The document does not contain information regarding funding sources, ongoing contract terms, or other salient financial details beyond the awarded contract amount.
Text of this file
eRFP 23-34 JCHS Fiber and Network Equipment REQUIREMENTS
JCHS English Wing IDF
Terminate fiber from Baseball Pressbox
Provide and install:
2 Aruba J9152D SFP+ LRM Module (or equivalent)
1 Rackmount fiber enclosure with LC connectors
2 1m mode conditioning LC/LC fiber jumpers
JCHS Baseball Pressbox
Bore and install conduit approximately 600 feet from English Wing
Pull approximately 800 feet of 6+ strand outdoor rated OM4 fiber optic cable from English Wing
Terminate fiber from English Wing into a fiber patch panel
Terminate fiber from Cheer Factory
Provide and install -
Tripp Lite SRWF6U 6U Wall Mount Rack Enclosure Cabinet Low Profile (or equivalent)
1 Rackmount fiber enclosure with LC connectors
2 1m mode conditioning LC/LC fiber jumpers
Aruba 3810m 24 port PoE+ (or equivalent)
Aruba JL083A SFP+ expansion module (or equivalent)
Aruba J9152D SFP+ LRM Module (or equivalent)
Aruba JL086A#ABA PoE+ Power Supply (or equivalent)
1 24 port Panduit NetKey Faceplate Modular Patch Panel (or equivalent)
1 APC SMT1000RM2UC Smart-UPS 1000VA (or equivalent)
JCHS Cheer Factory
Bore and install conduit approximately 380 feet from Baseball Pressbox
Pull approximately 400 feet of 6+ strand outdoor rated OM4 fiber optic cable from Baseball
Pressbox
Terminate fiber from Baseball Pressbox into a fiber patch panel
Provide and install -
Tripp Lite SRWF6U 6U Wall Mount Rack Enclosure Cabinet Low Profile (or equivalent)
1 Rackmount fiber enclosure with LC connectors
1 1m mode conditioning LC/LC fiber jumpers
Aruba 3810m 24 port PoE+ (or equivalent)
Aruba JL083A SFP+ expansion module (or equivalent)
Aruba J9152D SFP+ LRM Module (or equivalent)
Aruba JL086A#ABA PoE+ Power Supply (or equivalent)
1 24 port Panduit NetKey Faceplate Modular Patch Panel (or equivalent)
1 APC SMT1000RM2UC Smart-UPS 1000VA (or equivalent)
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .