FDA CMc Pricing Sheet.pdf
PDF 23 KB Posted
- Solicitation number
- 47PF0020R0057S
About this file
This document contains a pricing sheet for a Construction Manager as Constructor (CMc) contract for modernization and expansion projects at two FDA facilities. The CMc will provide design phase services and a guaranteed maximum price for work at the FDA Forensic Chemistry Center in Cincinnati, OH, including optional enhancements. Estimated costs of work and contingency amounts are listed for the FCC base project and optional building enhancement, along with fees to calculate guaranteed maximum prices. Design phase services and guaranteed maximum prices are also included for additional work at the nearby Peck Federal Building. The total evaluated price will be the sum of all design phase services, guaranteed maximum prices and fees. The related federal contract opportunity outlines Solicitation Number 47PF0020R0057S for this CMc contract issued by the GSA to modernize outdated systems and expand laboratory spaces for the FDA per the agency's long-term requirements at the specified locations in Cincinnati.
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
CLIN ITEM PRICE
1 Design Phase Services FCC (Firm Fixed Price) $
2 Design Phase Services FCC Building Enhancements Option (Firm Fixed Price)
3 Design Phase Services Peck (Firm Fixed Price) $
4 Estimated Cost of Work FCC (ECW) $
5 CMc Contingency Allowance (CCA) Percentage 3%
6 CCA ( 4x5 ) $
7 Fee $
8 Guaranteed Maximum Price (GMP) Option (4+6+7) $
9 Estimated Cost of Work FCC Building Enhancements Option (ECW)
10 CMc Contingency Allowance (CCA) Percentage 3%
11 CCA ( 9x10 ) $
12 Fee $
13 Guaranteed Maximum Price (GMP) Option (9+11+12)
14 Estimated Cost of Work Peck (ECW) $
15 CMc Contingency Allowance (CCA) Percentage 3%
16 CCA ( 14x15 ) $
17 Fee $
18 Guaranteed Maximum Price (GMP) Option (14+16+17)
19 Total Evaluated Price (1+2+3+8+13+18) $
File details come from the government source that posted it. Updated .