FDA Equipment_Responsibility_ Matrix.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Solicitation - Construction Manager as Constructor (CMc) contract for the FDA Forensic Chemistry Center Project
Solicitation number
47PF0020R0057S
Issued by

About this file

This document contains an equipment responsibility matrix and federal contract solicitation. The matrix lists various types of building equipment and systems and identifies whether they are considered standard or above standard building components. It also notes which entities, such as GSA, the lessor, or FDA, are responsible for the equipment's maintenance, repairs, warranties and preventative maintenance. The solicitation seeks a Construction Manager as Constructor contractor to perform repair and alteration work for the FDA Forensic Chemistry Center and Peck Federal Building in Cincinnati, Ohio. The project aims to modernize outdated building systems and expand FDA's laboratory spaces. Offerors must submit proposals by the specified due date to be considered for the award of a Guaranteed Maximum Price contract. Relevant agencies involved include GSA and FDA.

View the file

Other files

File Type Posted
EpsteinCombinedPart-4.pdf PDF
EpsteinCombinedPart-3Part-2.pdf PDF
EpsteinCombined Part 1.pdf PDF
EpsteinCombinedPart-2Part-1.pdf PDF
EpsteinCombinedPart-3Part-1.pdf PDF
EpsteinCombinedPart-2Part-2.pdf PDF
Appendix A.pdf PDF
Appendix H.pdf PDF
Appendix B.pdf PDF
Amendment 02_47PF0020R0057S.pdf PDF
Drawings Amendment 02.pdf PDF
Appendix J.pdf PDF
Appendix I.pdf PDF
Appendix E.pdf PDF
Concept Design Report.pdf PDF
Appendix F.pdf PDF
Pre Alteration Assessment Survey.pdf PDF
Appendix D.pdf PDF
Appendix C.pdf PDF
Amendment 01_RFP 47PF0020R0057S.pdf PDF
02_08_60_Lead_Mitigation.doc DOC document
Wage Determnation.pdf PDF
R5_Asbestos_Pre-Alteration_Assessment_Guidance.pdf PDF
Appendix-F_GPC_Checklist.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014.docx DOCX document
FDA CMc Solicitation_SOW.pdf PDF
Appendix-E_LEED-CI_Scorecard.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015930 Security Regulations FY15 Update Oct. 1, 2014.docx DOCX document
GSA 014025 Quality Control Testing for Air Barriers FY15 Update Oct. 1, 2014.docx DOCX document
GSA 011400 Work Restrictions FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-D_InteriorDesign_Concepts.pdf PDF
SSL_TLS_Implementation_Guide_10-17-2016.docx DOCX document
GSA 019113 Commissioning FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-H_ProjectLocation_FIRM_Map.pdf PDF
GSA_ACM_Notification_Form.pdf PDF
FDA-FCC_ConceptNarrative.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014.docx DOCX document
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-A_MeetingMinutes.pdf PDF
GSA 014000 Quality Assurance_Control FY15 Update Oct 1_2014.docx DOCX document
GSA 018111 Sustainable Design Requirements FY15 Update Oct. 1 2014.docx DOCX document
Appendix-C-DepartmentalDrawings.pdf PDF
FDA CMa and CXa SOW.pdf PDF
Peck DID Drawings.pdf PDF
GSA Smart Buildings Program Guide_v11.pdf PDF
SF24.pdf PDF
GSA 013220 Photographic Documentation FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015950 Safety_Health FY15 Update Oct 1_2014.doc DOC document
BuildingTechnologiesTechnicalReferenceGuidev11-2514.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FDA Equipment Responsiblity Mat

FDA Equipment Responsibility Matrix
(Insert Location Here)
Date Revised: XX/XX/XXXX
EquipmentResponsibilityPM Specification / StandardsFrequencyFootnote
Core/ShellTIRepair

: Is there a threshold?

-Christine Ewing - WPM1C This is a critical point that will depend on the circumstances of the lab location (owned/leased, etc.)

-Nathan Ingersoll - 5P1CAT I agree. A column listing the threshold amount would make it clear based on the particular owned/leased bldg -Christine Ewing - WPM1C Added a column for this - please let me know if what I added makes sense.

-Ron Snow - PCBAB : Define: 1. Who manages this? Regional PM? 2. When do they start filling this out? 3. When does it need to be filled out by?

-Ron Snow - PCBAB : Edit instructions to note further that team must edit standard and above standards items based on type of space and TI and above TI items, etc. Use pricing policy language. Check with Bill Hunt on language before finalizing.

-Ron Snow - PCBABRepair Threshold?Under Warranty?Warranty Expiration DatePreventative Maintanence (PM)Please Read Prior to Completing:
Standards ItemsYes or No?Yes or No?GSA/Lessor/FDA?Yes or No? If so, list amount.Yes or No?xx/xx/xxxxGSA/Lessor/FDA?I.E.: ASHRAE Standard 135i.e. Monthlyi.e 1
1Building Automation Systems (BAS)Instructions:

FDA and GSA Project Teams are to edit the equipment lists to the specific project that they are working on. Add/Delete equipment specific to the location as well as all other applicable information for each item. The intent is for the FDA and GSA have a clear understanding and expectation prior to occupancy as well as throughout.

Responsibilty for this Document:

GSA Regional Project Manager is responsible for this matrix during the project lifecycle and shall ensure it is filled out accurately and timely. Once the facility is occupied, it shall be the responsibility of the GSA Facilities Management team to maintain and update.

Timing of Completing this Document:

This document should be filled out as early on in the project planning as possible and updated throughout the life of the project. Once the construction is complete, it should be turned over to the GSA Facilities Management team.

Standard vs. Above Standard (Pricing Policy):

Standard (Core/Shell):

Building shell is the complete enveloping structure, the base building systems, and the finished common areas (building common and floor common) of a building that adjoin the tenant areas. Please see Chapter 2 of the GSA Pricing Desk Guide for a more detailed description.

Above Standard (Tenant Improvements or TI):

TIs are the finishes and fixtures that typically take space from the shell condition to a finished, usable condition. The resulting space is complete, meets applicable building codes, and meets the tenant agency’s functional needs. Please see Chapter 2 of the GSA Pricing Desk Guide for a more detailed description.

2JACE's
3Air Handling Units
4VAV Boxes
5Fan Coil Units
6Permiter Radiation
7Hot Water Pumps

: One of the difficulties we have had at the FCC is that these central systems are sized to meet the mission needs of the FDA lab and therefore much larger than "standard" sizes for a commercial office application. Perhaps we assign Shell/TI percentages for some of these items?

-Nathan Ingersoll - 5P1CAT
8Chilled Water Pumps
9Chillers
10Cooling Tower
11Switch Gear
12Panel Boards
13Lighting
14Domestic Plumbing
15Sanitary Piping
16Storm Piping
17Fire Alarm
18Fire Sprinkler
19Elevators
20Roof
21Exterior Facade
22Doors and Windows
Above Standard Items
1Special architectural features in GSA controlled public areas
2Display cases
3Building fire alarm system- including annunicators and announcement components.
4All biosafety cabinets & fume hoods including annual certification
5Laboratory exhaust systems
6Compressed air system (both central & sub-system)
7Vacuum system (for FDA equipment)
8Reverse osmosis deionizer water system including all sub-systems, controls, & fixtures
9Chilled water closed loop (secondary loop) (Bldg 62)
10Cold Rooms including all sub-systems, controls, and fixtures
11Lab water softener system and sub-systems and water conditioners
12UPS systems- Building Life Safety-
13Reese system
14Public address system- not associated with fire alarm system
15AV system including all controls and all sub-systems (controls, fixtures, etc.)
16Window blinds and roller shades (Building Std only)
17Autoclave and all sub-systems, controls, fixtures, and replacement parts
18Safety showers
19Emergency eye wash stations
20Dishwashers / glass washers
21Stand-alone ice makers
22Refrigerators including water filtration and ice maker
23Freezers & ultra low freezers
24Air & water cooled chillers / exchangers water & air
25Water purifier / polisher
26Glass washing units
27Base building air handling units
28Variable air volume boxes
29Air terminal boxes
30HVAC units for special space supplemental HVAC air handling units; data center, computer room and laboratory CRAC units, A/C units for the FDA UPS systems, DX cooling systems, heat exchangers for FDA equipment cooling.
31Building reheat system including all controls and all sub-systems, controls, and fixtures
32UV lights in base building air handling units
33Building plumbing system including all controls and all sub-systems, controls, and fixtures for domestic water and sewer. Potable water.
34Building room fan coil units including all controls and all sub-systems, controls, and fixtures
35Building room electric heaters including all controls and all sub-systems, controls, and fixtures
36Building electrical systems including standard ceiling and wall lights, motion detectors, dimmer lights / switches / sub-systems, and remotes including all controls and fixtures serving base building.
37Specialized electrical systems including voltage converters, power suppliers, controllers and specialized lighting fixtures for FDA equipment. Including 60 HZ to 50Hz, 50HZ 230 V power system.
38Specialized lighting systems in laboratories and procedure rooms- includes special spectrum, temperature and intensity lights. Std flurorescent ceiling lights are GSA.
39Building automation system including all sub-systems, controls, and fixtures
40Steam Stations
41Boilers including all sub-systems, controls, and replacement parts.
42Humidifiers- base building tied into main AHUs
43General exhaust systems- pantry and restroom
44HEPA filters
45Tunnel washer including all associated traps, controls, sub-systems, and replacement parts
46Cage washer including all associated traps, controls, sub-systems, and replacement parts
47Table top steam sterilizer including all sub-systems, controls, & replacement parts
48Automatic animal drinking water system
49Facility access panels throughout hallways and inside rooms
50Automatic doors
51Roll up doors at loading docks incl. controls and fixtures
52Dock levelers
53Chemical feed system associated with above standard equipment
54Hose system, hot water mixing station for domestic water
55Gantries, monorails, unistruct support rails in laboratories
56Skylights
57Prefab rooms
58Anechoic chambers & accessories (4) in G101 including grounding, shielding, electronic, electrical, mechanical, pneumatic systems, air compress or absorption replacement, re-calibrating, and general maintenance. Includes specialized fire alrm system and suspression system.
59RF Shielding
60Degassed water system including all sub-systems, controls, fixtures, and high purified 99.995% nitrogen
61Antenna systems - external and internal including towers, antennas, cabling, rotors, grounding, controls and other assocaited components used by FDA.
62Instant hot and under counter water heaters for pantries and restrooms
63Garbage disposals in pantries
64Waste treatment equipment for labs or vivarium
65FDA owned portable air conditioning units and spot coolers
66Package AC units in MPOP rooms
67Package AC units and heat pumps in Child Care Center
68Vibration isolation floors and tables
69Phoenix control systems including fixtures and controls for spaces
70Phoenix controls for anteroom alarm and interlock systems
71DI and watering system
72Plate and frame heat exchangers- Building HVAC system only
73Enthalpy wheels- Building HVAC system only
74Hot and chilled water system filters in primary loop
75Communciation systems including subsystems, controls, and fixtures including Wifi, cellular repeaters and amplifiers
76Batteries: wet cell / lead acid batteries for Data Center and agency UPS
77Battery monitoring systems for Data Center
78Bedding machine and dumpster service
79Down draft table
80Microscope chiller
81Liquid nitrogen systems including subsystems, controls and fixtures
82Site Scan system (data center)
83Sterlizers
84Airquity system
85Rotary UPS
86Bubble dampers
87Security equipment including maglocks, card readers and electroninc security equipment including exterior call stations.
88Door locks and keys
89Electric or hydraulic vehicle control devices incl. security lift gates, bollards, traffic signal lights
90Insect control devices in labs
91Foundation distribution cabinet (power for Data center)
92Power distribution system to CSU Data Center
93Furniture task lighting
94Site lighting along sidewalks, roads and parking lots
95Art In Architecture - interior and exterior
96Interior plants in lobbies and atriums
97Playground Equipment
98North Garage UPS
99Emergency Generators within the Central Utility Plant
100Emergency Generators (EGEN) outisde of the Central Utility Plant
101Special wall, floor or ceiling finishes in labs and vivarium
General Notes
AExample: PM and repairs by GSA will be provided by the O&M contractor or a specialized vendor
B
C
D
Footnotes
1Example: The base building Building Automation System (BAS) is maintained by GSA- Systems such as the AirQuity, animal drinking water system, "Watch Dog" , or Phoenix door interlock and access control systems are the responsibility of FDA.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

&F &P