This specification section outlines requirements for structural testing laboratory services for a project to modernize and expand FDA laboratory spaces located in Cincinnati, Ohio. The project will be completed using a Construction Manager as Constructor contract awarded by the General Services Administration Public Buildings Service Region 5.

The specification defines responsibilities for independent structural testing and special inspections to be managed separately from quality assurance testing and the contractor's quality control plan. It requires the contractor to obtain and include the cost for special inspections as a separate line item in the contract price. The contractor must submit payment requests for inspection and testing services, track the budget, and keep GSA informed on projected costs and remaining funds.

View the file

Other files

File Type Posted
EpsteinCombinedPart-4.pdf PDF
EpsteinCombinedPart-3Part-2.pdf PDF
EpsteinCombined Part 1.pdf PDF
EpsteinCombinedPart-2Part-1.pdf PDF
EpsteinCombinedPart-3Part-1.pdf PDF
EpsteinCombinedPart-2Part-2.pdf PDF
Appendix A.pdf PDF
Appendix H.pdf PDF
Appendix B.pdf PDF
Amendment 02_47PF0020R0057S.pdf PDF
Drawings Amendment 02.pdf PDF
Appendix J.pdf PDF
Appendix I.pdf PDF
Appendix E.pdf PDF
Concept Design Report.pdf PDF
Appendix F.pdf PDF
Pre Alteration Assessment Survey.pdf PDF
Appendix D.pdf PDF
Appendix C.pdf PDF
Amendment 01_RFP 47PF0020R0057S.pdf PDF
02_08_60_Lead_Mitigation.doc DOC document
Wage Determnation.pdf PDF
R5_Asbestos_Pre-Alteration_Assessment_Guidance.pdf PDF
Appendix-F_GPC_Checklist.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014.docx DOCX document
FDA CMc Solicitation_SOW.pdf PDF
Appendix-E_LEED-CI_Scorecard.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015930 Security Regulations FY15 Update Oct. 1, 2014.docx DOCX document
GSA 014025 Quality Control Testing for Air Barriers FY15 Update Oct. 1, 2014.docx DOCX document
GSA 011400 Work Restrictions FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-D_InteriorDesign_Concepts.pdf PDF
SSL_TLS_Implementation_Guide_10-17-2016.docx DOCX document
GSA 019113 Commissioning FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-H_ProjectLocation_FIRM_Map.pdf PDF
GSA_ACM_Notification_Form.pdf PDF
FDA-FCC_ConceptNarrative.pdf PDF
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-A_MeetingMinutes.pdf PDF
GSA 014000 Quality Assurance_Control FY15 Update Oct 1_2014.docx DOCX document
GSA 018111 Sustainable Design Requirements FY15 Update Oct. 1 2014.docx DOCX document
Appendix-C-DepartmentalDrawings.pdf PDF
FDA CMa and CXa SOW.pdf PDF
Peck DID Drawings.pdf PDF
GSA Smart Buildings Program Guide_v11.pdf PDF
SF24.pdf PDF
FDA Equipment_Responsibility_ Matrix.xlsx XLSX spreadsheet
GSA 013220 Photographic Documentation FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015950 Safety_Health FY15 Update Oct 1_2014.doc DOC document
BuildingTechnologiesTechnicalReferenceGuidev11-2514.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name Project Location PCN #

[Div 1 Reviewer/Writer Instructions: 1. Turn ON Show/Hide feature in the Home tab to see any hidden instructions that may be embedded in each specification. Turn OFF after completing your final version. 2. Comments in [ ] are guidance for AE spec. writers to consider during the design phase. Delete in final version.]

SECTION 014100 – STRUCTURAL TESTING LABORATORY SERVICES

[GSA Team and your A/E Spec Writer: Remove blue and red text and table after editing spec.]

[The intent of this Div 1; 014100 specification “Structural Testing Laboratory Services” is to layout the independent structural testing for this project and supplement Div1; 014000 – Quality Assurance & Control Requirements. The Contractor remains completely responsible for the performance and characteristics of materials that are provided under this Contract whether or not they are tested. Avoid language that could detract from this direction.

The Contractor will also be completely responsible, as indicated in this section, for the coordination and cooperation with the independent testing agency; providing access, conveyance, work areas and storage areas to the independent testing agency and submitting/making payments to the testing agency as a Contractor’s subcontractor. This includes, but is not limited to monitoring the Agency hours on site and witnessing reports and conditions as necessary.

The A/E will determine the specifics of an independent testing program that meet the IBC Code and other industry standards requirements and amplify the requirements, where necessary, for the quality expected per P100, this project and the critical nature of the elements involved. This will include the A/E listing the A/E, as required, for special inspections and structural observations per IBC Code, i.e., seismic element observations, etc. The necessary references and standards shall be included in the specifics of the testing. The specifics of the independent testing will be included in a paragraph (titled: Quality Assurance) at the end of each of the structurally related technical specifications, including but not limited to: See Table below.

Edit this section to address qualifications for the independent testing agency, reporting and recording procedures, responsibilities, report formats, etc.

THIS IS A GENERIC SPECIFICATION IN THE FORMAT DETERMINED BY THE GSA AND MUST BE APPROPRIATELY EDITED AND COORDINATED BY THE A/E WITH ALL OF THE CONTRACT DOCUMENTS. REVISE THIS SECTION BY DELETING AND INSERTING TEXT TO MEET PROJECT SPECIFICS.

Specifications and notes in the Contract Documents should be written as addressing the Contractor. The words Constructor, Contractor, CMc, etc., referring to the party who is under contract with the GSA for construction, should be avoided as it is implied. If unavoidable, coordinate the phrasing with the CO, PM and COR. Use the term ‘CONTRACTOR’, if necessary, until the review with GSA is accomplished.

The following terms are used in this specification format. Do not use others unless directed by the CO.

1. A/E – The contracted professional architectural or engineering firm(s) and their consultants that are responsible for preparing the Contract Documents for the GSA.

2. GSA – The Owner’s agent for the project. Do not use the terms Owner, Government, CO, PM, COR, etc. or Federal Agencies.

3. If off-site coordination is necessary with local authorities having jurisdiction (Local AHJ), e.g., fire department, utility provider, etc., be as specific as possible in describing the particular authority.

Comments and information in borders or boxes are intended to assist the A/E in preparing and fully coordinating the specification with the PM and COR for this specific project. These comments and information are not a guideline, textbook, handbook, training manual, or substitute for the technical competence expected of the design professional contracted for the preparation of the Contract Documents.

DIVISION 2 - SITE CONSTRUCTION
02221BUILDING DEMOLITION
02240DEWATERING
02260EXCAVATION SUPPORT AND PROTECTION
02300EARTHWORK
02456CONCRETE-FILLED STEEL PILES
02457PRESTRESSED CONCRETE PILES
02458STEEL H PILES
02459TIMBER PILES
02466DRILLED PIERS

DIVISION 3 - CONCRETE

03300CAST-IN-PLACE CONCRETE
03301CAST-IN-PLACE CONCRETE (LIMITED APPLICATIONS)
03331CAST-IN-PLACE ARCHITECTURAL CONCRETE
03371SHOTCRETE
03410PLANT-PRECAST STRUCTURAL CONCRETE
03450PLANT-PRECAST ARCHITECTURAL CONCRETE
03470TILT-UP PRECAST CONCRETE
03491GLASS FIBER REINFORCED CONCRETE
03930CONCRETE REHABILITATION
DIVISION 4 - MASONRY
04810UNIT MASONRY ASSEMBLIES
04851DIMENSION STONE CLADDING

DIVISION 5 - METALS

05120STRUCTURAL STEEL
05210STEEL JOISTS
05310STEEL DECK
05400COLD-FORMED METAL FRAMING
05500METAL FABRICATIONS
05511METAL STAIRS
05521PIPE AND TUBE RAILINGS
05530GRATINGS

DIVISION 6 - WOOD AND PLASTICS

06100ROUGH CARPENTRY
06130HEAVY TIMBER CONSTRUCTION
06150WOOD DECKING
06176METAL-PLATE-CONNECTED WOOD TRUSSES
06185STRUCTURAL GLUED-LAMINATED TIMBER

While specification sections are being submitted to the GSA for review, any changes shall be clearly marked or ‘tracked’ using electronic format. Draw a line through language to be removed and retain comments, in borders or boxes, in the specifications until the Contract Documents are issued to Contractors. Confirm the timing of deleting the crossed-out language and comments with PM.

Delete the guidance above in final version.]

Use this section for required “Special Structural Inspection Services” to provide for the expenses and procedural requirements for special structural inspections. This not part of the Quality Assurance in Section 014000.

REMOVE THIS SECTION ENTIRELY IF SPECIAL STRUCTURAL INSPECTIONS ARE NOT REQUIRED BY IBC.

Edit this section as necessary to suit the qualifications of the person overseeing the inspection. Do not include the special inspection program description in this section.

The A/E must determine the specifics of a Special Structural Inspection program that meet the IBC Code and other industry standards requirements. The specifics of the special inspection must be included in a description on the Structural Drawings. The necessary additional references and standards shall be included in the specifics of the inspection description, on the drawing Such quality assurance tests should only be considered for verification of those critical programmatic requirements that can not be adequately assured by standard submittals and routine practices.

The following abbreviations are used in this specification section. Do not use others unless directed by the CO:

CONTRACTOR - The CMc, General Contractor, etc. who is under contract with the GSA for construction.

AE – The contracted professional architectural or engineering firm(s) and their consultants that are responsible for preparing the Contract Documents for the GSA.

GSA – The Government’s (Owner) agent for the project. Do not use the terms Owner, Government, CO, PM, COR, etc. or Federal Agencies.

SECTION 014025 – STRUCTURAL TESTING LABORATORY SERVICES

GENERAL

1.1 SUMMARY: This section includes administrative and procedural requirements for the necessary special inspection services as determined and overseen by the Licensed Engineer responsible for the structural Contract Documents.

A. The administrative and procedural requirements of Division 1 Section "Quality Assurance and Control" apply to the work of this section, unless modified in this section for the special inspections only.

B. Special structural inspections and the testing for special structural inspections shall be managed and tracked separately from the Quality Assurance testing and the Contractor’s Quality Control Plan.

C. Duplication of the tests of the Independent Testing Agency is to be avoided, but the common testing is to be attached and recorded in both logs.

D. The scope of such inspection services shall be as defined in the prevailing edition of the International Building Code (IBC).

E. Only the GSA can modify scope.

1.2 Alternate Licensed Engineer: Should the Licensed Engineer responsible for the structural Contract Documents no longer be available due to relocation, or, the Government accepts a specific alternate Licensed Engineer. The alternate Licensed Engineer:

A. Shall be licensed in the State where the project is located, B. Shall review the Contract Documents and communicate with the responsible Licensed Engineer to achieve full understanding of the system design, C. Shall have any modifications reviewed and accepted by the Licensed Engineer responsible for the structural Contract Documents.

1.3 Contractor Responsibilities:

A. The presence of the Licensed Engineer shall in no way relieve the Contractor of his obligation to perform the work in accordance with the Contract Documents.

B. The Contractor shall provide the coordination and services for the special inspections as indicated in Section "Quality Assurance and Control" including, but not limited to:

1. Coordination of the trades, quality control and the sequence of construction to ensure continuity of the system for the inspection(s).

2. Not covering or encasing inspection areas prior to inspections.

3. Additional testing or retesting.

4. Associated services for the inspections.

5. Repair.

1.4 Payment for Special Inspections: The Contractor shall obtain and include the cost for special inspections as a separate line in the Contract Sum.

A. The Contractor shall submit payments for the inspecting and testing services, track the budget and keep the GSA informed on projected costs and remaining budget.

PART 1 - PRODUCTS (Not Used)

PART 2 - EXECUTION (Not Used)

END OF SECTION 014100