This solicitation is for a Construction Manager as Constructor (CMc) contract to modernize and expand laboratory spaces for the FDA Forensic Chemistry Center located in Cincinnati, OH. The General Services Administration (GSA) intends to award a guaranteed maximum price contract to provide repair and alteration services including upgrading outdated building systems. The proposed project will modernize building infrastructure and expand FDA laboratory capacity to meet future agency needs as outlined in the solicitation attachments. Pricing will be on a lump sum basis. The response due date is not provided in the document, but it indicates the GSA's intent to award a CMc contract to complete the described scope of work for the FDA facility.

View the file

Other files

File Type Posted
EpsteinCombinedPart-4.pdf PDF
EpsteinCombinedPart-3Part-2.pdf PDF
EpsteinCombined Part 1.pdf PDF
EpsteinCombinedPart-2Part-1.pdf PDF
EpsteinCombinedPart-3Part-1.pdf PDF
EpsteinCombinedPart-2Part-2.pdf PDF
Appendix A.pdf PDF
Appendix H.pdf PDF
Amendment 02_47PF0020R0057S.pdf PDF
Drawings Amendment 02.pdf PDF
Appendix J.pdf PDF
Appendix I.pdf PDF
Appendix E.pdf PDF
Concept Design Report.pdf PDF
Appendix F.pdf PDF
Pre Alteration Assessment Survey.pdf PDF
Appendix D.pdf PDF
Appendix C.pdf PDF
Amendment 01_RFP 47PF0020R0057S.pdf PDF
02_08_60_Lead_Mitigation.doc DOC document
Wage Determnation.pdf PDF
R5_Asbestos_Pre-Alteration_Assessment_Guidance.pdf PDF
Appendix-F_GPC_Checklist.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014.docx DOCX document
FDA CMc Solicitation_SOW.pdf PDF
Appendix-E_LEED-CI_Scorecard.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015930 Security Regulations FY15 Update Oct. 1, 2014.docx DOCX document
GSA 014025 Quality Control Testing for Air Barriers FY15 Update Oct. 1, 2014.docx DOCX document
GSA 011400 Work Restrictions FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-D_InteriorDesign_Concepts.pdf PDF
SSL_TLS_Implementation_Guide_10-17-2016.docx DOCX document
GSA 019113 Commissioning FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-H_ProjectLocation_FIRM_Map.pdf PDF
GSA_ACM_Notification_Form.pdf PDF
FDA-FCC_ConceptNarrative.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014.docx DOCX document
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-A_MeetingMinutes.pdf PDF
GSA 014000 Quality Assurance_Control FY15 Update Oct 1_2014.docx DOCX document
GSA 018111 Sustainable Design Requirements FY15 Update Oct. 1 2014.docx DOCX document
Appendix-C-DepartmentalDrawings.pdf PDF
FDA CMa and CXa SOW.pdf PDF
Peck DID Drawings.pdf PDF
GSA Smart Buildings Program Guide_v11.pdf PDF
SF24.pdf PDF
FDA Equipment_Responsibility_ Matrix.xlsx XLSX spreadsheet
GSA 013220 Photographic Documentation FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015950 Safety_Health FY15 Update Oct 1_2014.doc DOC document
BuildingTechnologiesTechnicalReferenceGuidev11-2514.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B - FCC Space list

6/12/2020 1

Rm # Dept Space HC Qty Unit Area

(SF)

Total Area

(SF)

USF/

Person

Dept Space HC Qty Unit Area

(SF)

Total Area (SF)

USF /

Person

Room Updates

Req'd

Opioid Related

Comments

Administration 155 Administration 149

Offices Offices 145 Assoc Director's OMPSLO Office - non FCC 1 1 394 394 146 FCC Lab Director 1 1 224 224 FCC Lab Director 1 1 225 225 X 147 SAMS DFA (non FCC) 1 1 148 148 SAMS DFA (non FCC) 1 1 120 120 X 148 Branch Director 1 1 151 151 Branch Director - Organic Branch 1 1 180 180 X 149 AMS DFA (non FCC) 3 1 223 223 AMS DFA (non FCC) 2 1 150 150 X 150 QSM (Quality Systems Manager) 1 1 149 149 QSM (Quality Systems Manager) 1 1 120 120 X 151 Branch Director 1 1 224 224 Branch Director - Inorganic Branch 1 1 180 180 X 153 IH / Sup. IH OBSO (non FCC) 2 1 277 277 Staff moved to non FCC space. Change back to Conference/Mail/File/Copy 154 Supervisor 1 1 133 133 Supervisor 0 0 120 0 Accounted for in Lab Section 155 Supervisor 1 1 134 134 Supervisor 0 0 120 0 Accounted for in Lab Section 156 Supervisor 1 1 137 137 Supervisor 0 0 120 0 X Accounted for in Lab Section 157 Support/IT 2 1 440 440 PSS, OSP, QSS 3 1.5 150 225 X 1 Program Support Specialist, 1 Operational Support Position 1 Quality Systems Specialist 144 Supervisor 1 1 142 142 AMS (non FCC) 1 1 150 150 X

Circulation - Actual 1,263 Circulation - 35% 473 FCC Admin Total: 17 4,039 FCC Admin Area Total: 11 1,823 8 on future org chart

Non-FCC Administration Non-FCC Administration Area Offices Offices

ORA/OM/DFO 1 1 180 180 X Gribbins ORA/ORS/MPT Associate Director 1 1 180 180 X Satzger ORA/ORS/MPT Program Management Analyst 1 1 120 120 X Duncan ORA/ORS/MPT Future Position 1 1 120 120 X ORA/ORS/MPT/Future Position (IMF related) 1 1 120 120 X ORA/ORS/OBSO/Supv IH 1 1 120 120 X Have access to the lab ORA/ORS/OBSO/IH 1 1 100 100 X Have access to the lab Flex 1 1 100 100 X

DPU DPU - Data Processing Unit Business Side 037 Equipment 1 244 244 Equipment 1 100 100 X 166 PIV 1 210 210 PIV 1 110 110 X Locate on non-secure side

Circulation - 35% 85 Circulation - 35% 399 Non-FCC Admin Total: 0 539 Non-FCC Admin Area Total: 8 1,649

Office Support Office Support 141 FCC Conference Room 1 796 796 0 750 0 50 person 142 FCC Library 1 665 665 0 600 0 40 person 003 Conference / Training 1 1,351 1,351 Conference / Training 1 1,500 1,500 100 person, sub-dividable into (2) 50 person rooms 52 Mother's Room 1 140 140 Mother's Room 1 150 150 X

New Medium Conference Room 2 240 480 X 10-12 person Mail / File / Copy 1 150 150 X Rm 153 277 SF

Off Support Total: 2,952 Off Support Total: 2,280

11,954 0

17 19,484 19 5,752

Space List – Existing vs. New - First Floor

Existing Building New Program

FCC Administration

Cincinnati District Administration Total

FCC Administration Area

Cincinnati District Administration Total

Admin Total:Admin Total:

6/12/2020 2

Rm # Dept Space HC Qty Unit Area

(SF)

Total Area

(SF)

USF/

Person

Dept Space HC Qty Unit Area

(SF)

Total Area (SF)

USF /

Person

Room Updates

Req'd

Opioid Related

Comments

Space List – Existing vs. New - First Floor

Existing Building New Program

Laboratory Space Laboratory Space Organic Branch Organic Branch Block A: Trace Evidence Section (TES) Trace Evidence Section (TES)

088-9 Data Room 2 2 100 200 Data Room - Supervisor 1 1 120 120 Rm 88 - Supervisor 090 Data Room 2 1 134 134 Data Room - Analyst 11 6 150 900 X 98-9 (from Separation III)

092-3 Data Room 4 2 134 268 081 Data Room 1 1 84 84 Tablet Press 1 84 84 X Separate room for dust 080 Fingerprint Lab 1 270 270 FTIR / XRD 1 270 270 X 082 Dark Room 1 232 232 Handheld Instrument Storage 1 232 232 X 086 Electron Microscopy 1 387 387 SEM 1 387 387 X Separate room for sensitive equipment 087 Microscopy/Photography 1 598 598 Microscopy/Photography 1 598 598 X 091 FTIR 1 1,054 1,054 FTIR 1 1,054 1,054 X Separate room for positive pressure

New Raman 1 844 844 X X 97A, Equip. moved from FTIR, separate rm for pos. press.

New Trace Vestibule 1 100 100 X X Make FTIR & Raman pos. pressure

Block A: TES Total: 9 3,227 TES Total: 12 4,589

Block C: Mass Spectrometry Section (MSS) Mass Spectrometry Section (MSS) 111-2 Data Room 4 2 135 270 Data Room - Supervisor 1 1 120 120

New Data Room - Analyst 10 5 150 750 100-3 (from Separation III) 110 Mass Spectrometry 1 1,562 1,562 Mass Spectrometry 1 1,562 1,562 X

New Mass Spectrometry 1 844 844 X X 97B Block C: MSS Total: 4 1,832 MSS Total: 11 3,276

Block B: Separations Laboratory III (SEP III) Separations Laboratory III (SEP III) New Separations Lab I 098-102 Data Room 9 5 135 675 Data Room 0 0 135 0 X These are reassigned to Trace and Mass Spec

097 Separation III 1 1,687 1,687 Separation III 0 1,687 0 Splits into 97A, 97B New Data Room - Supervisor 1 1 120 120 X New Data Room - Analyst 11 6 150 900 X New Separations Lab 1 - 035 1 2,000 2,000 X X New Gas Cylinder Closet 1 25 25 X X

Block B: SEP III Total: 9 2,362 SEP III Total: 12 3,045

Block H: Biology / General Chemistry (SSMBS) New Microbiology Section 064-5 Data Room 3 2 147 294 Data Room - Supervisors 1 1 120 120 076-7 Data Room 4 2 100 200 Data Room - Analysts 6 3 150 450 2 are chemists 063 General Chemistry Lab 1 1,174 1,174 General Chemistry Lab 1 1,174 1,174 X Similar work to Separations Labs. This space could move to New Chemistry Section 075 Micro/Molecular Biology 1 1,002 1,002 Micro/Molecular Biology 1 1,002 1,002 X? X

Microbiology - Sterility 1 295 295 X X 66A, separate rm to limit contamination Molecular Biology - Post PCR 1 295 295 X X 66B, separate rm to limit contamination

Block H: SSMBS Total: 7 2,670 New Microbiology Section Total: 7 3,336

Inorganic Branch Inorganic Branch Block E: Separations I Section (SEP I) Separations I Section

125-9 Data Room 9 5 135 675 Data Room - Supervisor 1 1 120 120 Data Room - Analyst 11 6 150 900

124 Separation I 1 1,690 1,690 Separation I 1 1,690 1,690 X Block E: SEP I Total: 9 2,365 SEP I Total: 12 2,710

Block F: Separations II Section (SEP II) Separations II Section (SEP II) 133-7 Data Room 8 5 135 675 Data Room - Supervisor 1 1 120 120

6/12/2020 3

Rm # Dept Space HC Qty Unit Area

(SF)

Total Area

(SF)

USF/

Person

Dept Space HC Qty Unit Area

(SF)

Total Area (SF)

USF /

Person

Room Updates

Req'd

Opioid Related

Comments

Space List – Existing vs. New - First Floor

Existing Building New Program

Data Room - Analyst 11 6 150 900 132 Separation II 1 1,690 1,690 Separation II 1 1,690 1,690 X

Block E: SEP II Total: 8 2,365 SEP II Total: 12 2,710

New Separations Laboratory II New Chemistry Lab New Separations Lab II New Data Room - Supervisor 1 1 120 120 X New Data Room - Analyst 10 5 150 750 X New Separations Lab 2 - 036 1 2,000 2,000 X X New Gas Cylinder Closet 1 25 25 X X

New Separations Laboratory II Total: 0 0 New Chemistry Lab Total: 11 2,895

Block D: Chromatography & Elemental Analysis Section (CES) Chromatography & Elemental Analysis Section (CES) Metals 118-9 Data Room 4 2 148 296 Data Room - Supervisor 1 1 120 120 114 Data Room 2 1 165 165 Data Room - Analyst 10 5 150 750 122 Data Room 1 1 162 162 113 Ion Photography 1 500 500 Ion Photography 1 500 500 117 ICP, ESI, Atomic Absorption 1 1,574 1,574 ICP, ESI, Atomic Absorption 1 1,574 1,574 120 Inorganic Sample Prep 1 704 704 Inorganic Sample Prep 1 704 704 X Separate room for pressure and contamination 121 ICP, Mass Spec 1 533 533 ICP, Mass Spec 1 533 533

Block D: CES Total: 7 3,934 CES Total: 11 4,181

BSL-3 Laboratory Total 2,370 BSL-3 Laboratory Total 2,370

Laboratory Support Space Laboratory Support Space 109 Photo Documentation 1 225 225 Photo Documentation 1 225 225 X 096 Analytical Sample Prep 1 470 470 Analytical Sample Prep 1 470 470 X X 104 Standards Preparation 1 467 467 Standards Preparation 1 467 467 X

105-8 NMR - Suite 1 1 578 578 NMR - Suite 1 578 578 X Staffed by SEP I 066 Laundry, Glassware, Autoclave 1 590 590 Laundry, Glassware, Autoclave 1 440 440 X X moves to 150 (or 051-2)

8 total Gas Closets 1 357 357 Gas Closets 1 357 357 X New Photo Document - Lab 3 1 440 440 X X New Analytical Sample Prep - Lab 4 1 440 440 X X New Flex Lab 1 440 440 X X Used to test new equipment. Could be an area in a larger lab

Laboratory Support Space Total 1 2,687 Laboratory Support Space Total 0 3,857

54 23,812 88 32,969

Common Building Space Common Building Space Building Support NSF Building Support NSF

001 Vestibule 1 77 77 Vestibule 1 77 77 002 Lobby/Corridor 1 743 743 Lobby/Corridor 1 743 743 004 Reception/Security 1 1 186 186 Reception/Security 2 1 186 186 2 guards on site 24/7 159 Men's Lockers 1 481 481 Men's Lockers 1 481 481 15 full size lockers 010 Men's Lockers 1 349 349 Men's Lockers 1 349 349 15 full size lockers 161 Women's Lockers 1 481 481 Women's Lockers 1 481 481 15 full size lockers 011 Women's Lockers 1 389 389 Women's Lockers 1 389 389 15 full size lockers 012 Food Service Area 1 1,476 1,476 Food Service Area 1 1,476 1,476 013 Vending 1 245 245 Vending 1 245 245 165 Computer & Evidence Destruction 1 210 210 Computer & Evidence Destruction 1 110 110 X

Receiving Receiving

Laboratory Total: Laboratory Total:

6/12/2020 4

Rm # Dept Space HC Qty Unit Area

(SF)

Total Area

(SF)

USF/

Person

Dept Space HC Qty Unit Area

(SF)

Total Area (SF)

USF /

Person

Room Updates

Req'd

Opioid Related

Comments

Space List – Existing vs. New - First Floor

Existing Building New Program

068 Shipping/Receiving 1 440 440 Shipping/Receiving 1 770 770 X Increase size of dock by removing wall between existing dock and Rm 067

055 Drug Storage 1 74 74 Drug Storage 1 74 74

056 Secure Corridor 1 160 160 Secure Corridor 1 160 160

057 Evidence Techs 2 1 129 129 Evidence Techs 3 1 180 180 X 1 is a future position

058 Vault 1 74 74 Vault 1 74 74

059-60 Walk-in Ref/Freezer 1 422 422 Walk-in Ref/Freezer 1 422 422

061 Evidence Room 1 392 392 Evidence Room 1 392 392

062 Analyzed & Un-analyzed Surplus 1 806 806 Analyzed & Un-analyzed Surplus 1 806 806

Storage Storage

067 Lab Equipment Storage 1 331 331 Lab Equipment Storage 1 440 440 X

158 General Lab Storage 1 762 762 General Lab Storage 1 220 220 X Consumables Document Storage 1 220 220 X Archived case files, instru logs, QA, time keeping

IH/Safety Supplies 1 330 330 X 069 Chemical Storage 1 193 193 Chemical Storage 1 193 193

070 Volatile Solvents 1 250 250 Volatile Solvents 1 250 250

071 Cylinder Storage 1 191 191 Cylinder Storage 1 191 191

072 Shipping Clerk 1 1 76 76 Shipping Clerk 1 1 76 76 PSS position reporting to the Director

073 Hazardous Waste 1 146 146 Hazardous Waste 1 146 146

Building Support NSF Total 4 9,083 Building Support NSF Total 6 9,481

Building Support GSF Building Support GSF 006 Tele 1 65 65 Tele 1 65 65 007 Electrical 1 102 102 Elect 1 102 102 008 Janitor's Closet 1 65 65 Janitor 1 65 65 009 UPS / Switchgear 1 945 945 UPS / Switchgear 1 945 945 084 Tele 1 102 102 Tele 1 102 102 085 Electrical 1 102 102 Elect 1 102 102

131 UPS 1 130 130 UPS 1 130 130

139 Women's Toilet 1 59 59 Women's Toilet 1 59 59 140 Men's Toilet 1 59 59 Men's Toilet 1 59 59 160 Janitor's Closet 1 42 42 Janitor's Closet 1 42 42 163 Mechanical 1 1,113 1,113 Mechanical 1 1,113 1,113 164 Electrical 1 252 252 Electrical 1 252 252

Building Circulation 7,094 Building Circulation - Estimate 7,094 Building Support GSF Total: 0 10,130 Building Support GSF Total: 0 10,130

4 19,213 6 19,611

TOTAL FLOOR AREA: 75 62,509 TOTAL FLOOR AREA: 113 58,332

Common Building Space Common Building Space Building Support 975 Building Support 975 Equipment & furniture storage Building Circulation 460 Building Circulation 460 Parking 10,060 Parking 10,060 Common Building Space Total: 11,495 Common Building Space Total: 11,495

Common Building Space Total: Common Building Space Total:

Space List – Existing vs. New - Parking Garage

6/12/2020 5

Rm # Dept Space HC Qty Unit Area

(SF)

Total Area

(SF)

USF/

Person

Dept Space HC Qty Unit Area

(SF)

Total Area (SF)

USF /

Person

Room Updates

Req'd

Opioid Related

Comments

Space List – Existing vs. New - First Floor

Existing Building New Program

TOTAL FLOOR AREA: 11,495 TOTAL FLOOR AREA: 11,495

TOTAL FACILITY AREA: 74,004 TOTAL FACILITY AREA: 69,827

File details come from the government source that posted it. Updated .