This document provides specifications for sustainable design requirements on a federal construction project. The specifications outline requirements for areas such as construction waste management, indoor air quality management, and commissioning. The contractor must coordinate with subsequent technical sections and meet LEED documentation requirements, using the more stringent standard if there is a conflict. The contractor is responsible for maintaining sustainability objectives in means and methods, proposed substitutions or process changes. The related federal contract opportunity is a solicitation for a Construction Manager as Constructor contract for repair and expansion of the FDA Forensic Chemistry Center and Peck Federal Building in Cincinnati, Ohio. The project will modernize outdated systems and expand FDA laboratory spaces to meet long-term agency requirements.

View the file

Other files

File Type Posted
EpsteinCombinedPart-4.pdf PDF
EpsteinCombinedPart-3Part-2.pdf PDF
EpsteinCombined Part 1.pdf PDF
EpsteinCombinedPart-2Part-1.pdf PDF
EpsteinCombinedPart-3Part-1.pdf PDF
EpsteinCombinedPart-2Part-2.pdf PDF
Appendix A.pdf PDF
Appendix H.pdf PDF
Appendix B.pdf PDF
Amendment 02_47PF0020R0057S.pdf PDF
Drawings Amendment 02.pdf PDF
Appendix J.pdf PDF
Appendix I.pdf PDF
Appendix E.pdf PDF
Concept Design Report.pdf PDF
Appendix F.pdf PDF
Pre Alteration Assessment Survey.pdf PDF
Appendix D.pdf PDF
Appendix C.pdf PDF
Amendment 01_RFP 47PF0020R0057S.pdf PDF
02_08_60_Lead_Mitigation.doc DOC document
Wage Determnation.pdf PDF
R5_Asbestos_Pre-Alteration_Assessment_Guidance.pdf PDF
Appendix-F_GPC_Checklist.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014.docx DOCX document
FDA CMc Solicitation_SOW.pdf PDF
Appendix-E_LEED-CI_Scorecard.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015930 Security Regulations FY15 Update Oct. 1, 2014.docx DOCX document
GSA 014025 Quality Control Testing for Air Barriers FY15 Update Oct. 1, 2014.docx DOCX document
GSA 011400 Work Restrictions FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-D_InteriorDesign_Concepts.pdf PDF
SSL_TLS_Implementation_Guide_10-17-2016.docx DOCX document
GSA 019113 Commissioning FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-H_ProjectLocation_FIRM_Map.pdf PDF
GSA_ACM_Notification_Form.pdf PDF
FDA-FCC_ConceptNarrative.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014.docx DOCX document
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-A_MeetingMinutes.pdf PDF
GSA 014000 Quality Assurance_Control FY15 Update Oct 1_2014.docx DOCX document
Appendix-C-DepartmentalDrawings.pdf PDF
FDA CMa and CXa SOW.pdf PDF
Peck DID Drawings.pdf PDF
GSA Smart Buildings Program Guide_v11.pdf PDF
SF24.pdf PDF
FDA Equipment_Responsibility_ Matrix.xlsx XLSX spreadsheet
GSA 013220 Photographic Documentation FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015950 Safety_Health FY15 Update Oct 1_2014.doc DOC document
BuildingTechnologiesTechnicalReferenceGuidev11-2514.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name Project Location PCN #

[Div 1 Reviewer/Writer Instructions: 1. Turn ON Show/Hide feature in the Home tab to see any hidden instructions that may be embedded in each specification. Turn OFF after completing your final version. 2. Comments in [ ] are guidance for spec. writers to consider during the design phase. Delete in final version.]

SECTION 018111 -- SUSTAINABLE DESIGN REQUIREMENTS [Prior to editing this, review with your Architect/Engineer the P100 requirements, which is updated often. Coordinate with your contracting officer, your Sustainability Coordinator and the contract templates. Also contact Martin Weiland for how to set project goals using the new Tier system in P100. See the Whole Building Design Guide as a way to setting and monitoring goals: http://npbdg.wbdg.org (National Performance-Based Design Guide (NPBDG)]

PART 1 – GENERAL

1. SUMMARY

A. This Section describes general requirements and procedures to comply with the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings, Executive Orders 13423 and 13514, the Energy Policy Act of 2005 (EPAct 2005), and the Energy Independence and Security Act of 2007 (EISA 2007).

B. Contractor shall be required to coordinate with subsequent technical sections herein as to the sustainability requirements.

1.1 OBJECTIVES

A. [Identify here the contractor’s responsibilities for purchasing, constructing and documenting use of sustainable products. See latest GSA Green Purchasing Plan and latest GSA sustainability policies.]

B. [gBuild (Green Building Upgrade Information Lifecycle Database is GSA’s system for tracking and reporting high-performance green building (HPGB) related data. gBUILD allows project teams to collaborate in a centralized secure environment that reduces and streamlines data calls for program-wide reporting. Internal GSA users and external users will be provided usernames and passwords.) GSA Project Team during A/E procurement include this work in your scope of work with them. Coordinate with A/E sow and identify what the construction contractor’s gBuild responsibilities are here.]

1.2 RELATED DOCUMENTS

The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents.

A. Section 017410 Construction Indoor Air Quality Management

B. Section 017419 Construction Nonhazardous Waste & Management Disposal

C. Section 018109 Testing for Indoor Air Quality [This section is not part of GSA’s base division one set. Have A/E provide this section and edit accordingly.]

D. Section 019113 Commissioning

1.3 SUBMITTALS

A. Shall meet LEED documentation requirements. In the event that the Contractor's submittal cannot comply with both standards, then the more stringent standard shall apply. [Required for Capital Projects, and for small or TI projects when applicable. Coordinate above with 1.1 Objectives, ePM and gBUILD.] B. Commissioning: See Section 019113 Commissioning for submittal requirements.

C. Sustainable Design Progress Reports: Concurrent with each Application for Payment, submit reports for the following:

1. Construction Waste Management: Waste reduction progress reports and logs complying with the requirements of Section 017419 Construction Nonhazardous Waste & Management Disposal.

2. Construction IAQ Management: See section 017410 Construction Indoor Air Quality Management for Construction IAQ management progress report requirements.

1.4 QUALITY CONTROL

A. Preconstruction Meeting: After award of Contract and prior to the commencement of the Work, schedule and conduct meeting with Owner, Architect, and all Subcontractors to discuss sustainability requirements, expected submittals, the Construction Waste Management Plan, and the required Construction Indoor Air Quality (IAQ) Management Plan. The purpose of this meeting is to develop a mutual understanding of the project’s sustainable design requirements and coordination of the Contractor’s management of these requirements with the Contracting Officer and the Construction Quality Manager.

B. Construction Job Conferences: The status of compliance with the sustainable design requirements of these specifications will be an agenda item at all regular job meetings conducted during the course of work at the site.

PART 2 - PRODUCTS

Products and processes that minimize environmental impact to the extent currently possible have been included in the Construction Documents. These products include but are not limited to paint, gypsum wall board, carpet, acoustic ceiling tile and concrete. The Contractor is responsible for maintaining and supporting these objectives in developing means and methods for performing the work of this Contract and in proposing product substitutions and/or changes to specified processes.

END OF SECTION 018111

FY15 Update Oct. 1, 2014 Sustainable Design Requirements 018111 -- 2 image1.png

File details come from the government source that posted it. Updated .