About this file

This document is a notification form for asbestos demolition and renovation work for the General Services Administration (GSA) Region 5. The form provides information on the facility where asbestos abatement work will occur, including the building name and address, description of size and tenants. It also lists the removal contractor details, such as company name and contact. Additional information includes the procedures used to verify the presence of asbestos containing materials, waste transport and disposal details, quantities of asbestos to be removed categorized by friability, planned removal dates and working hours. The form further describes the planned asbestos abatement methods and engineering controls to prevent emissions. It requires the contractor's certification that a trained, licensed supervisor will be on site during the work.

The related federal contract opportunity is a solicitation for a Construction Manager as Constructor contract for repair and renovation work at the FDA Forensic Chemistry Center and Peck Federal Building in Cincinnati, Ohio. The project aims to modernize outdated building systems and expand FDA laboratory spaces to meet long-term agency needs. The solicitation provides additional project details and is issued by the GSA Public Buildings Service Region 5. Interested offerors should review the solicitation attachments for full requirement information.

View the file

Other files

File Type Posted
EpsteinCombinedPart-4.pdf PDF
EpsteinCombinedPart-3Part-2.pdf PDF
EpsteinCombined Part 1.pdf PDF
EpsteinCombinedPart-2Part-1.pdf PDF
EpsteinCombinedPart-3Part-1.pdf PDF
EpsteinCombinedPart-2Part-2.pdf PDF
Appendix A.pdf PDF
Appendix H.pdf PDF
Appendix B.pdf PDF
Amendment 02_47PF0020R0057S.pdf PDF
Drawings Amendment 02.pdf PDF
Appendix J.pdf PDF
Appendix I.pdf PDF
Appendix E.pdf PDF
Concept Design Report.pdf PDF
Appendix F.pdf PDF
Pre Alteration Assessment Survey.pdf PDF
Appendix D.pdf PDF
Appendix C.pdf PDF
Amendment 01_RFP 47PF0020R0057S.pdf PDF
02_08_60_Lead_Mitigation.doc DOC document
Wage Determnation.pdf PDF
R5_Asbestos_Pre-Alteration_Assessment_Guidance.pdf PDF
Appendix-F_GPC_Checklist.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014.docx DOCX document
FDA CMc Solicitation_SOW.pdf PDF
Appendix-E_LEED-CI_Scorecard.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015930 Security Regulations FY15 Update Oct. 1, 2014.docx DOCX document
GSA 014025 Quality Control Testing for Air Barriers FY15 Update Oct. 1, 2014.docx DOCX document
GSA 011400 Work Restrictions FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-D_InteriorDesign_Concepts.pdf PDF
SSL_TLS_Implementation_Guide_10-17-2016.docx DOCX document
GSA 019113 Commissioning FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-H_ProjectLocation_FIRM_Map.pdf PDF
FDA-FCC_ConceptNarrative.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014.docx DOCX document
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014.docx DOCX document
Appendix-A_MeetingMinutes.pdf PDF
GSA 014000 Quality Assurance_Control FY15 Update Oct 1_2014.docx DOCX document
GSA 018111 Sustainable Design Requirements FY15 Update Oct. 1 2014.docx DOCX document
Appendix-C-DepartmentalDrawings.pdf PDF
FDA CMa and CXa SOW.pdf PDF
Peck DID Drawings.pdf PDF
GSA Smart Buildings Program Guide_v11.pdf PDF
SF24.pdf PDF
FDA Equipment_Responsibility_ Matrix.xlsx XLSX spreadsheet
GSA 013220 Photographic Documentation FY15 Update Oct. 1, 2014.docx DOCX document
GSA 015950 Safety_Health FY15 Update Oct 1_2014.doc DOC document
BuildingTechnologiesTechnicalReferenceGuidev11-2514.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notification of Asbestos Demolition and/or Renovation

General Services Administration Region 5

Chicago, IL 60604

1. TYPE OF NOTIFICATION: (check one) Original Revision Cancellation

2. FACILITY INFORMATION (provide names and phone numbers):

GSA Project Manager: _____________________________________________ GSA Property Manager: ____________________________________________ GSA Regional Environmental Engineer: ________________________________ GSA’s A/E Project Manager: _________________________________________ GSA’s Government Environmental Consultant: __________________________ GSA Emergency Contact: ___________________________________________

3. REMOVAL CONTRACTOR INFORMATION:

Company name and Address: ________________________________________ City, State, and zip code: ___________________________________________ Name of contact and phone number: __________________________________

4. FACILITY DESCRIPTION:

Building Name and GSA Building Number: ______________________________ Street Address: ___________________________________________________ City, State, and zip code: ___________________________________________ Building size: __________ Number of Floors: _______ Age of Building: _______ Current Use of Building: _________________ Tenants that may be impacted: _______________________________________

5. DESCRIBE THE PROCEDURES THAT WERE USED TO VERIFY THE PRESENCE

OF ASBESTOS CONTAINING MATERIAL: ___________________

6. WASTE INFORMATION, Provide Company, contact name, and phone no:

Waste Transporter: ________________________________________________ Waste Disposal Site: _______________________________________________ Estimated Quantity of Asbestos Containing Waste: _______________________

7. LIST THE APPROXIMATE QUANTITIES OF ASBESTOS TO BE REMOVED:

Friable ACM:

Component Quantity

Category I Non-Friable ACM (packings, gaskets, resilient floor coverings and adhesive mastics, and asphalt roofing products):

Category II, Non-Friable ACM (all other Non-Friable ACM)

8. SCHEDULED REMOVAL DATES:

Start Date_________________ Completion Date: _____________ Scheduled Working Hours: ________________________________

9. PROVIDE A DESCRIPTION OF THE PLANNED ASBESTOS METHODS TO BE

USED:

10. PROVIDE A DESCRIPTION OF THE ENGINEERING CONTROLS THAT WILL BE

USED TO PREVENT THE EMMISSIONS OF ASBESTOS DURING THE PROJECT:

11. CONTRACTOR’S CERTIFICATION:

“I certify that a trained individual, licensed as a Contractor Supervisor, in the State where the work is being performed, and who satisfies the requirements of a Competent Person will be on site at all times when any asbestos related work is occurring.

Name, title, and Signature of Contractor Date

GSA Project Manager:
GSA Property Manager:
GSA Regional Environmental Engineer:
GSAs AE Project Manager:
GSAs Government Environmental Consultant:
GSA Emergency Contact:
Company name and Address:
Name of contact and phone number:
Building Name and GSA Building Number:
Street Address:
Building size:
Number of Floors:
Age of Building:
Current Use of Building:
Tenants that may be impacted:
Waste Transporter:
Waste Disposal Site:
Estimated Quantity of Asbestos Containing Waste:
Completion Date:
Date:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Describe the procedures used to verify the presence of ACM:
Scheduled Working Hours:
List The Approximate Quantities Of Asbestos To be Removed::
List The Category I Non-Friable ACM To Be Removed::
List The Category II, Non-Friable ACM To Be Removed::
City State and zip code:
Description of The Planned Asbestos Methods To Be Used:
Description Of The Planned Asbestos Methods To Be Used:

File details come from the government source that posted it. Updated .