This is a Past Performance Rating Form (FORM III FA9101-26-R-B011, RFP Attachment 6, L-5) used as a template for evaluating contractor past performance on previous federal contracts. The form is classified as source selection sensitive information per FAR 2.101 and 3.104.

The form requires offerors to provide information about a past performance project, including the contractor name, contract or order number, project title, and total period of performance including options. A designated rater (typically a government representative or customer from the previous contract) completes the evaluation section and returns it to the offeror for inclusion in their proposal response. The form evaluates contractor performance across six criteria using a standardized five-level adjectival rating scale: Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory. Each rating level includes specific performance definitions. The six evaluation criteria are: (1) Quality, (2) Schedule, (3) Cost Control, (4) Management, (5) Small Business Subcontracting, and (6) Regulatory. For any rating marked as Marginal or Unsatisfactory, the rater must provide additional substantive comments to justify the rating. The rater completes fields for their name, title, agency or customer, phone number, and email address. This template serves as a standardized mechanism for collecting objective past performance data to support proposal evaluation during the federal contract selection process.

View the file

Other files

File Type Posted
FA910126RB011 DRAFT RFP Amendment 03.pdf PDF
FARM III Draft RFP QandAs.pdf PDF
FARM III Draft RFP SF1442 Atch 7 Section M_V1.pdf PDF
FARM III Draft RFP SF1442 Atch 5 SBSP.pdf PDF
FARM III Draft RFP SF1442 Atch 6 Section L_V1.pdf PDF
FARM III Draft RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix_V1.xlsx XLSX spreadsheet
FA910126RB011 DRAFT RFP Amendment 02.pdf PDF
FARM III Draft RFP SF1442 Atch 6_L-6 Teaming Agreement.pdf PDF
FARM III Draft RFP SF1442 Atch 6_L-3 Cross Reference Matrix_V1.xlsx XLSX spreadsheet
FA910126RB011 DRAFT RFP Amendment 01.pdf PDF
FARM III Scoring Matrix and Cross Reference Sheet Instructional Video.mp4 MP4 file
FARM III Draft RFP SF1442 Atch 6_L-3 Cross Reference Matrix.xlsx XLSX spreadsheet
FARM III Draft RFP Atch B RFI 2 Questions and Answers.pdf PDF
FA9101-26-R-B011 FARM III Draft RFP Cover Letter.pdf PDF
FARM III Draft RFP Atch C Questions Template.xlsx XLSX spreadsheet
FARM III Draft RFP SF1442 Atch 2 Scheduled GFP.pdf PDF
FARM III Draft RFP SF1442 Atch 6 Section L.pdf PDF
FARM III Draft RFP SF1442 Atch 6_L-1 Offeror Company Information Form.pdf PDF
FARM III Draft RFP SF1442 Atch 6_L-2a Work Sample Cover Sheet - Prime.pdf PDF
FARM III Draft RFP SF1442 Atch 6_L-2b Work Sample Cover Sheet - Subcontract.pdf PDF
FARM III Draft RFP SF1442 Atch 7 Section M.pdf PDF
FARM III Draft RFP Atch A SF1442.pdf PDF
FARM III Draft RFP SF1442 Atch 1 SOW.pdf PDF
FARM III Draft RFP SF1442 Atch 3 Wage Determinations.pdf PDF
FARM III Draft RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

FARM III

FA9101-26-R-B011

RFP Attachment 6, L-5

1. QUALITY

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear, or were, satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.

ADDITIONAL COMMENTS:

Click here to enter text. DRAFT

RFP Attachment 6, L-5

2. SCHEDULE

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear, or were, satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective, or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.

RFP Attachment 6, L-5

3. COST CONTROL

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear, or were, satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective, or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.

RFP Attachment 6, L-5

4. MANAGEMENT

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear, or were, satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective, or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.

RFP Attachment 6, L-5

5. SMALL BUSINESS SUBCONTRACTING

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear, or were, satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective, or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.

RFP Attachment 6, L-5

6. REGULATORY

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear, or were, satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor's proposed actions appear only marginally effective, or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the Contractor's corrective actions appear or were ineffective.