FARM III Draft RFP SF1442 Atch 6_L-4 HTRO Scoring Matrix_V1.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- FA910126RB011 FARM III Draft RFP
- Solicitation number
- FA910126RB011
About this file
This is a self-scoring matrix template for the FARM III (Facilities Acquisitions for Restoration and Modernization) contract evaluation. Offerors must complete the yellow cells to demonstrate their qualifications across multiple technical categories and provide supporting documentation for work performed by both prime contractors and teaming subcontractors.
The scoring matrix evaluates offerors in six primary categories: Mechanical Systems (10 subcategories including air ducts, high-pressure piping, pressure vessels, desiccant dryers, turning vanes, pumps, filters, hydraulic systems, steam boilers, and chillers with maximum 4 points each); Electrical Systems (8 subcategories including medium/high voltage switchgear, substations, ducting, transformers, circuit breakers, and variable frequency drives with maximum 4 points each); and Facility Renovations (5 maximum points for projects addressing at least 5 of 7 facility elements spanning HVAC, fire protection, electrical, exterior, plumbing, communications, and interior finishes). Additional evaluation categories include Project Management and Development/Design (60 and 20 points respectively, based on DoD construction project value and contract experience), and CPARS/CPARS Equivalent Data Submissions (up to 5 submissions with bonus scoring). Key constraints include: a combined maximum of 20 points across the first three technical categories; teaming subcontractor work samples cannot exceed prime contractor submissions; and offerors receiving at least one CPARS submission for each of the first three categories receive doubled bonus points.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions |
| 1. Only input data into the yellow cells of the Self Score Sheet tab. |
| 2. Please insert Offeror's name on Row 4. |
| 3. Offeror shall fill in Column D "Offeror Self-Score Points: Work performed by Prime" and Column E "Offeror Self-Score Points: Work performed by Teaming Subcontractor" for the first 5 Categories, 3.2.2.1-3.2.2.5. |
| 4. Sum of Work Samples submitted for each Subcategory cannot break the max allowable points (Column F must be less than or equal to Column C for each subcategory). |
| 5. An Offeror may account for a sum of 20 points across the first three Categories: 3.2.2.1 Mechanical Systems, 3.2.2.2 Electrical Systems, and 3.2.2.3 Facility Renovations. Please note that points are referencing the value placed by the Offeror in columns D&E, not the score calculated from those entries. |
| 6. The total number of Work Samples submitted on behalf of a Teaming Subcontractor must be less than or equal to the number of Work Samples submitted for work performed by the Prime (Cell E31 must be less than or equal to Cell D31). |
| 7. All Offerors are to fill in the Project Management, Development, and Design Category (3.2.2.4 and 3.2.2.5) based off the projects/work samples submitted for sections 3.2.2.1-3.2.2.3. |
| 8. All Offerors are encouraged to fill out the CPARS/CPARS Equivalent Data Submission Category (3.2.2.6), columns A-I, based off the projects/work samples submitted from Categories 3.2.2.1-3.2.2.3. |
| 9. Offerors are allotted a maximum of five CPARS/CPARS Equivalent submissions (3.2.2.6). It is up to the Offeror to determine best score feasible with the available five submissions. Note that the number of subcontractor CPAR submissions must be less than or equal to the number of CPARs submitted for the Prime. |
| 10. Points allotted from CPARS/CPARS Equivalent data are considered a bonus score; each entry will produce a calculated percentage bonus based off of the specific Subcategory it is associated with and the Offeror's ratings. |
| 11. If an Offeror is able to submit at least one CPARS/CPARS Equivalent response for each of the first three Categories (3.2.2.1 Mechanical Systems, 3.2.2.2 Electrical Systems, 3.2.2.3 Facility Renovations), then the Offeror will receive a double bonus, doubling the points received for all CPAR submissions. |
&"Times New Roman,Regular"FA8903-24-R-0023 Appendix L-05
Self Score Sheet
| FARM III | |||||||||||
| FA9101-26-R-B011 | |||||||||||
| Draft Attachment L-4 HTRO Scoring Matrix | |||||||||||
| OFFEROR NAME: [FILL IN OFFEROR NAME HERE] | |||||||||||
| Section L Paragraph | Category | Maximum Self-Score Points | Offeror Self-Score Points: Work performed by Prime (1-4, 1-5) | Offeror Self-Score Points: Work performed by Teaming Subcontractor (1-4, 1-5) | Offeror Proposed Total Self-Score Points | Self-Score Point Multiplication Factor | Offeror's Initial Unweighted Score | Weight Factor | Single Project Weighted Score | Max Weighted Score | Offeror's Weighted Score before Bonus |
| Mechanical Systems | |||||||||||
| 3.2.2.1 | Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to repair, repair by replace, or installation of the following systems: | ||||||||||
| M1 | Air Duct, expansion joints and control/process valves (≥ 36" Ø and 150psig) | 4 | 0 | 250.00 | 0 | 4 | 1000 | 4000 | 0 | ||
| M2 | High pressure duct/piping and valves (≥ 4" Ø, ≥ 4,000psig) | 4 | 0 | 250.00 | 0 | 7 | 1750 | 7000 | 0 | ||
| M3 | Large pressure vessels (≥ 2000psig; ≥ 10K gallons) | 4 | 0 | 250.00 | 0 | 9 | 2250 | 9000 | 0 | ||
| M4 | Desiccant bed air dryers (≤ 300psia and ≥ 200lb/s) | 4 | 0 | 250.00 | 0 | 3 | 750 | 3000 | 0 | ||
| M5 | Turning vanes for large air ducting (≥ 30ft Ø, 0.5-160psia) | 4 | 0 | 250.00 | 0 | 5 | 1250 | 5000 | 0 | ||
| M6 | Cooling water/raw water pumps (10,000-50,000gpm) | 4 | 0 | 250.00 | 0 | 8 | 2000 | 8000 | 0 | ||
| M7 | Cooling water/raw water filters/strainers, valves (control/process) and distribution lines (≥ 36” Ø) | 4 | 0 | 250.00 | 0 | 7 | 1750 | 7000 | 0 | ||
| M8 | Hydraulic Systems with high flow and pressure requirements (≥ 100gpm, ≥2000psig) | 4 | 0 | 250.00 | 0 | 4 | 1000 | 4000 | 0 | ||
| M9 | Large Steam Boilers (≥50kpph) | 4 | 0 | 250.00 | 0 | 5 | 1250 | 5000 | 0 | ||
| M10 | Chillers and Refrigeration equipment, project sum (≥1,000 refrigeration tons) | 4 | 0 | 250.00 | 0 | 6 | 1500 | 6000 | 0 | ||
| Electrical Systems | |||||||||||
| 3.2.2.2 | Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to repair, repair by replace, or installation of the following systems: | ||||||||||
| E1 | Medium Voltage gas insulated switchgear (≥ 1kV and ≤ 35kV) | 4 | 0 | 250.00 | 0 | 6 | 1500 | 6000 | 0 | ||
| E2 | Medium Voltage unit substations (≥ 1kV and ≤ 35kV) | 4 | 0 | 250.00 | 0 | 6 | 1500 | 6000 | 0 | ||
| E3 | Medium Voltage ducting/vaults/cables (≥ 1kV and ≤ 35kV), more than 500 linear feet | 4 | 0 | 250.00 | 0 | 6 | 1500 | 6000 | 0 | ||
| E4 | High Voltage ducting/vaults/cables (>35kV), more than 500 linear feet | 4 | 0 | 250.00 | 0 | 8 | 2000 | 8000 | 0 | ||
| E5 | High Voltage transformers (> 35kV) | 4 | 0 | 250.00 | 0 | 8 | 2000 | 8000 | 0 | ||
| E6 | Oil or gas circuit breakers (≥ 1000 amp and ≥ 500kV) | 4 | 0 | 250.00 | 0 | 8 | 2000 | 8000 | 0 | ||
| E7 | Variable frequency drives for motors (≥ 1000V) | 4 | 0 | 250.00 | 0 | 5 | 1250 | 5000 | 0 | ||
| E8 | Facility Wide Lightning Protection Systems (Facility ≥ 5,000SF) | 4 | 0 | 250.00 | 0 | 4 | 1000 | 4000 | 0 | ||
| Facility Renovations | |||||||||||
| 3.2.2.3 | Number of Work Samples that include all labor, materials, equipment, transportation, supervision, and quality control to execute a construction service contract by repairing, repair by replacing, or installing at least 5 of 7 Elements listed below: |
-Facility HVAC will include at least 4 of the following items: chillers, Air Handler Units, ducting, boilers, refrigerant/refrigerant lines, condensers, and compressors -Facility Fire protection will include at least 3 of the following items: sprinkler systems, heat/smoke detectors, pull stations, fire alarm control panels, notification systems -Facility Electrical systems will include at least 4 of the following items: facility transformers, power panels, bus bars, circuit breakers/fuses, conduit/conductors, lights/wall plugs, and grounding systems -Facility Exterior components will include at least 2 of the following items: roofing systems, exterior cladding, windows/doors, and insulation -Facility Plumbing systems will include at least 2 of the following items: potable water piping/fittings, sewage piping/fittings, venting, and fixtures -Facility Communications Systems will include at least 2 of the following items: hardware replacement withing telecommunication rooms/closets, cabling within the facility, wireless network systems, public address systems, and uninterruptible power supplies (UPS) -Interior Finishes will include at least 3 of the following items: finished flooring, drywall (or other typical wall material) installation/repair, painting, wall paper/coverings, suspended ceiling systems, and systems furniture 5 0 250.00 0 7 1750 8750 0
| Total Sum of Self-Score Points Selected for Mechanical Systems, Electrical Systems, and Facility Renovation cannot be greater than 20. | ||||
| Total Sum of Teaming Subcontractor Points (Cell E31) cannot be greater than Total Sum of the Prime's Points (Cell D31). | Total Self-Score Points | 0 | 0 | 0 |
| Project Management, Development, and Design | Acceptable Input (1-60/1-20) | |||||||||
| 3.2.2.4 | Total dollar value of construction services projects supporting DoD Installations. | 60 | 0 | 16.67 | 0 | 3 | 50 | 3000 | 0 | |
| 3.2.2.5 | Total number of design and construction services on a single contract/TO. | 20 | 0 | 50.00 | 0 | 3 | 150 | 3000 | 0 |
Offeror is only to input data into the yellow cells.
| Offeror's Weighted Score Before CPARS Bonus (Column J Sum) | 0 | |
| Offeror's Bonus Score based off CPARS Data (CPARS Sections Below) | 0 | |
| Did Offeror Receive "CPAR For All Categories" Bonus, Points Awarded | No | 0 |
| Offeror's Final Self Score | 0 | |
| Government-Validated Score |
| 3.2.2.6 | CPARS/CPARS Equivalent Data Submission | ||||||||
| Project 1 | Contract Title | Subsection Associated with Project | Quality | Management | Cost Control | Small Business Subcontracting | Regulatory Compliance | Schedule | Total Score from Provided Ratings |
| Year | WS Number/Project Title | Select from Dropdown | |||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0 | Average | 0.00 | |||||||
| Project Details from Above Subsections | Unweighted Score | Weighted Score | Bonus Awarded | 0% |
| Project 2 | Contract Title | Subsection Associated with Project | Quality | Management | Cost Control | Small Business Subcontracting | Regulatory Compliance | Schedule | Total Score from Provided Ratings |
| Year | WS Number/Project Title | Select from Dropdown | |||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0 | Average | 0.00 | |||||||
| Project Details from Above Subsections | Unweighted Score | Weighted Score | Bonus Awarded | 0% |
| Project 3 | Contract Title | Subsection Associated with Project | Quality | Management | Cost Control | Small Business Subcontracting | Regulatory Compliance | Schedule | Total Score from Provided Ratings |
| Year | WS Number/Project Title | Select from Dropdown | |||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0 | Average | 0.00 | |||||||
| Project Details from Above Subsections | Unweighted Score | Weighted Score | Bonus Awarded | 0% |
| Project 4 | Contract Title | Subsection Associated with Project | Quality | Management | Cost Control | Small Business Subcontracting | Regulatory Compliance | Schedule | Total Score from Provided Ratings |
| Year | WS Number/Project Title | Select from Dropdown | |||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0 | Average | 0.00 | |||||||
| Project Details from Above Subsections | Unweighted Score | Weighted Score | Bonus Awarded | 0% |
| Project 5 | Contract Title | Subsection Associated with Project | Quality | Management | Cost Control | Small Business Subcontracting | Regulatory Compliance | Schedule | Total Score from Provided Ratings |
| Year | WS Number/Project Title | Select from Dropdown | |||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0.00 | |||||||||
| 0 | Average | 0.00 | |||||||
| Project Details from Above Subsections | Unweighted Score | Weighted Score | Bonus Awarded | 0% |
Sheet1
| CPAR Ratings | Associated Score | Subsections | CPARS Criteria Selected | CPARS Potential Criteria | Check | |||
| Exceptional | 50 | M1 | 0 | 0 | M1 | 0 | 0 | 0 |
| Very Good | 40 | M2 | 0 | 0 | M2 | 0 | 0 | 0 |
| Satisfactory | 20 | M3 | 0 | 0 | M3 | 0 | 0 | 0 |
| Marginal | 0 | M4 | 0 | 0 | M4 | 0 | 0 | 0 |
| Unsatisfactory | -5 | M5 | 0 | 0 | M5 | 0 | 0 | 0 |
| N/A | 0 | M6 | M6 | 0 | 0 | 0 | ||
| "" | 0 | M7 | M7 | 0 | 0 | 0 | ||
| M8 | M8 | 0 | 0 | 0 | ||||
| M9 | M9 | 0 | 0 | 0 | ||||
| M10 | M10 | 0 | 0 | 0 | ||||
| E1 | E1 | 0 | 0 | 0 | ||||
| E2 | E2 | 0 | 0 | 0 | ||||
| E3 | E3 | 0 | 0 | 0 | ||||
| E4 | E4 | 0 | 0 | 0 | ||||
| E5 | E5 | 0 | 0 | 0 | ||||
| E6 | E6 | 0 | 0 | 0 | ||||
| E7 | E7 | 0 | 0 | 0 | ||||
| E8 | E8 | 0 | 0 | 0 | ||||
| 3.2.2.3 | 3.2.2.3 | 0 | 0 | 0 |
File details come from the government source that posted it. Updated .