Atch L-1 CROSS REFERENCE MATRIX.doc

DOC document 136 KB Posted

Attached to
Space Control Effects Modeling & Assessment (SCHEMA) Federal contract opportunity
Solicitation number
FA9451-09-R-0003
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Atch L-1 Cross Reference Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Space Control Effects Modeling & Assessment (SCHEMA), newest first.
File Type Posted
Q A 7.doc DOC document
Q A 6.doc DOC document
Q A 5.doc DOC document
Q A 4.doc DOC document
Q A 3.doc DOC document
Q A 2.doc DOC document
Amendment 1 - 19 Nov 09.pdf PDF
Q A 1.doc DOC document
TO 0002 Space Superiority SOW.docx DOCX document
Atch L-3 DFARS Pricing Guidance.doc DOC document
TO 0001 Vulnerability SOW.doc DOC document
Attachment L-2 - Base Support Equipment.xls XLS spreadsheet
FA9451-09-R-0003.pdf PDF
NOCA.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CROSS REFERENCE MATRIX

For Prospective Offerors: See Section L, PRS-001, paragraph 1.2 regarding instructions for completion of the solicitation Cross-Reference Matrix. If this matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over this matrix. Additionally, to the extent this matrix discloses details as to the extent or manner by which the Government intends to evaluate offeror’s proposals for award, Section M references in the matrix are for information purposes only, and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of the Section M of the solicitation.

SOLICITATION CROSS REFERENCE MATRIX

Description
RFP
SOW
CLIN
CDRL
Proposal
Volume I – Administrative Data
Section L
- SF 33
pg L-20, Vol I (a)
- Executive Summary
pg L-20, Vol I (b)
- Deviations
pg L-20, Vol I (c)
- DD Forms 1423
pg L-21, Vol I (d)
- CAGE Code
pg L-21, Vol I (e)
Representations & Certifications
Section K
52.204-03
pg K-2
52.204-08
pg K-3
252.204-7007
pg K-8
252.227-7017
pg K-10
PRS-K002
pg K-12
Volume II – Mission Capability
Section L
- Technical Approach
pg L-21, 2(a)
- Corporate Experience
pg L-22, 2(b)

- Management

-- Organization structure
pg L-23, 2(c)1)
-- Key personnel
pg L-23, 2(c)2)
-- Security clearances
pg L-24, 2(c)3)
-- Initial Staffing
pg L-25, 2(c)4)
-- Personnel end strength
pg L-25, 2(c)5)
-- Staffing vacancy
pg L-25, 2(c)6)
-- Mgmt control system
pg L-25, 2(c)7)
-- Configuration mgmt
pg L-26, 2(c)8)

DD Form 2345

B, 3.2

Security Requirements

B, 3.0, 4.1.4, and 4.1.5

TO1, 4.3

TO2, 4.3

0001 0002

Management Tasks

B, 4.1.1

TO1, 4.0

TO2, 4.0

A005

Reports

B, 4.1.2

TO1, 4.2

TO2, 4.2

0003
A002

A005

Software

B, 4.1.2

TO1, 3.0

TO2, 3.0

0001 0002

Hardware

B, 4.1.2

TO1, 3.0

0004
A006

Presentation Materials

B, 4.1.2

TO1, 3.12,

3.13,4.2, and 5.4 TO2, 3.6, 4.2, and 5.4

0001 0002
A003

System Safety Program

B, 4.1.3
0001 0002

Safety Assessment

B, 4.1.3

Facilities Security

B, 4.1.4

IT Security

B, 4.1.5

C4 Systems Security Training

B, 4.1.5

IA Cert for Workgroup Manager or SAs

B, 4.1.5

National Agency Check for access to C4 Systems

B, 4.1.5

Core Work Hours

B, 4.1.6

Proximity of Facilities

B, 4.1.7

IT CCB Compliance

B, 4.1.8

Analysis / Technology Reachback Cell

B, 4.2

Gather, Analyze, and incorporate info for space systems and architectures

B, 4.2.1, and 4.2.2.3

A005

Modeling and Simulation

B, 4.2.1, and 4.2.2.2

Design experiments and test plans and execute experiments

B, 4.2.1, and 4.2.1.4

TO1, 3.7

TO2, 3.3

Information gathering and analysis

B, 4.2.1.1

TO1, 3.16

Model Development

B, 4.2.1.2

Matter / Energy Interactions

B, 4.2.1.3

Predictive Avoidance (PA)

B, 4.2.1.5

TO1, 3.19,

3.20 and 3.24

TO2, 3.5.1.2

and 3.5.1.5

A001

A002

A004

System Assessments – Perform Vulnerability and Susceptibility Assessments

B, 4.2.2

TO1, 3.6

A002

Space System Assessments

B, 4.2.2.1

TO1, 3.5

TO2, 3.4

Computer Science

B, 4.2.3

Software Development

B, 4.2.4

TO1, 3.3

A004

A001

Materials Characterization and Testing

TO1, 3.1

Failure Modes

TO1 3.2

Satellite Information Database (SID)

TO1, 3.4 and 3.21.3

TO2, 3.2

Technology Assessment and Analysis

TO1, 3.10,

3.11, and 3.25

TO2, 3.1

A002

Travel

TO1, 3.14

TO2, 3.8

Unique Protection List (UPL) Generation / Unique Laser Susceptibility (ULS) files

TO1, 3.15 and 3.21.2

Laser Normalization

TO1, 3.18

and 3.21.5

TO2, 3.4

Software Program for PA Analysis

TO1, 3.22

A001

Glint Analysis

TO1, 3.26

TO2, 3.5.1.4

A002

Technical and Management Skills and resources

TO1, 4.1

TO2, 4.1

Training for System Integrity Assessments (SIA)

TO2, 3.7

Transition Phase-In Plan
Clause B060 pg 5 of 40
Volume III – Cost/Price
Section L
Cost Proposal Checklist
Section L, pg 31

LEGEND

B=Basic IDIQ SOW

TO1=Task Order 0001-00

TO2=Task Order 0002-00

Attachment L-1

File details come from the government source that posted it. Updated .