09. As-Built Guidance 2024.pdf

PDF 315 KB Posted

Attached to
B1043 Install Backup Generator
Solicitation number
FA9401-26-R-0020
Issued by

About this file

This document is As-Built Guidance for Contractors, effective November 19, 2024, providing detailed requirements for documenting construction as-built conditions through both hardcopy and Computer Aided Design (CAD) drawings.

Contractors must submit printed hardcopy shop drawings in addition to electronic CADD files. Shop drawings smaller than standard CADD sheet sizes (8.5" x 11", 11" x 17", or 24" x 36") must be referenced into standard-size border sheets. PDF shop drawings not prepared by the contractor may also be referenced into standard border sheets, subject to contract specification approval. Shop drawings should be drawn at the same scale as similar Government Furnished CADD drawings, with Sheet Identification Numbers and Detail/View Identification Numbers linking details to existing drawings. The Index of Drawings must be updated to reflect additional sheets with appropriate titles and identification numbers.

Working Hardcopy Drawing revisions must be performed on black line prints of the most current drawing, typically on a weekly basis with at least one set on-site at all times. Revisions require legible written explanations and must include associated view revisions across all sheets. Three base colors identify changes: red for deletions (crossed out or marked through), green for additions, and blue for special items requiring special information or relocated features. Each change requires an equilateral delta triangle (approximately 3/8" per side) containing a sequential identification number corresponding to entries in the Issue Block describing the revision. All revisions require "REVISED AS-BUILT" marking in the Issue Block with numbered descriptions. For CAD drawings, contractors must maintain the Government Furnished Design Area setup and conform to all CADD Standard requirements outlined in contract specifications, including standards for Drawing File Organization, Graphic Concepts, Level/Layer Assignments, and Standard Symbology. Model files containing physical project components are drawn at full scale in true geographic space, while sheet files represent ready-to-plot drawings with selected views of referenced model files within a border sheet.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

As-Built Guidance for Contractors Effective 11/19/2024

Submit printed hardcopy shop drawings in addition to electronic Computer Aided Design Drawings (CADD). If Contract Specification allow for the acceptance of shop drawing which are smaller than the CADD standard sheet size (i.e. 8.5" x 11", 11" x 17" or 24" x 36" etc.) the sheets will be referenced into the standard size border sheet used in the Government Furnished drawings. The Contract Specification may also allow .pdf shop drawings not prepared by the contractor to be referenced into the standard size border sheet. Please refer to Contract Specification for complete requirements and Shop Drawing acceptance.

Typically, shop drawings will be drawn at the same scale as similar drawings in the Government Furnished CADD standard (e.g. fire alarm systems shall be drawn to the same scale as the plumbing or electrical drawings). Sheet Identification Number, Detail and View Identification Numbers, etc. will link details and views to existing drawings. The Index of Drawings will also need to be updated to show the additional sheet(s) with the appropriate Sheet Title and Identification Number.

REVISION OF WORKING HARDCOPY DRAWINGS

General Working Hardcopy Drawing Revision Guidelines

The number of Working Hardcopy Drawing set that must be maintained and the frequency at which they must be revised is provided in the Contract Specifications. Typically, revisions of the approved drawing set will be performed on a weekly basis. At a minimum, at least one set will be on-site at all times.

Markups will be completed on black line (Grayscale) prints of the most current drawing. If a Contract Modification requires revised drawings during construction, an up-to-date print should be included in the Working Hardcopy Drawing set. The Sheet Index will be revised to reflect the addition, deletion or renaming of any sheets in the set.

Revisions to the Working Hardcopy Drawings will include legible written explanations to assist in the conveyance of the graphical intent and to clarify any ambiguities. The Contractor will ensure all handwritten text is clear and concise. When revisions are made to drawing sheets, the contractor will ensure that all associated views (e.g., sections, details, plans, profiles, elevations, etc.) are revised accordingly, including those on other drawing sheets. In addition, it may be necessary to revise legends, schedules, notes and call-out designations. When revisions require deletions, ensure that all features and associated data and captions that relate to the revision are marked accordingly.

It may be necessary to make revisions on small scale drawings where space may be restricted. In this event, it may be necessary to develop large scale sketches with leaders to the location where applicable.

When attached prints or sketches are included with markup, indicate whether the existing Working CADD requires revision, an additional Working Drawing should be added to the set or the print or sketch has been provided for further details and is for "Reference Only". When prints or sketches are required, please ensure that adequate detail is provided to allow for revision of the existing Working drawings or the development of an additional Working CAD Drawing.

As-Built Guidance for Contractors Effective 11/19/2024

The following guidelines should be followed when revising Working Hardcopy Drawings.

Three base colors should be used to markup the drawings to show as-built conditions. If additional colors are used, provide a legend to explain their use.

• Red – Deletions: Deleted graphics shall be marked with red, and shall include red text in notes and red leaders.

• Green – Additions: Added items shall be green with green text in notes and green leaders.

• Blue – Special: Items requiring special information shall be blue with blue text in notes and blue leaders.

To identify revisions, markups will include a delta triangle (equilateral triangle approximately 3/8” per side) near the revised section of the drawing for all changes. When several items in a table or drawing view (e.g., sections, details, plans, profiles, elevations, etc.) are changed or completely redrawn, a single delta triangle may be placed near the title for the table or drawing view. This same method may be used for general revisions to entire drawing sheets when a major portion of the drawing is changed.

When only a few items are revised, added or deleted, a delta triangle will be placed near each item requiring revision. Each delta triangle will contain an identification number that corresponds to an entry in the issue block that describes the revision.

Figure 1 - Use of Delta Triangles

As-Built Guidance for Contractors (con't.) Effective 11/19/2024

Revision of Working Hardcopy Drawings will require entries into the Issue Block of the drawing Title Block. If a drawing requires revision, the first available space of the Issue Block will be marked “REVISED AS-BUILT” to identify that the drawing has been revised. Immediately below the Issue Block line containing “REVISED AS-BUILT”, a description of each revision on the drawing will be provided and numbered in sequential order. In the event the drawing already includes numbered revisions, the next sequential number will be used.

Figure 2 - Working Hardcopy Revision Block

Working Hardcopy Drawing Additions

When revisions require additions to the Working Hardcopy Drawings, the additions should be indicated with green graphics and text. The revision will be identified with a numbered delta triangle and include graphics, dimensions and notes describing the addition. Revisions will be documented in the Issue Block with a green numbered delta triangle and description of the addition.

Figure 3 - Working Hardcopy Drawing Addition

Working Hardcopy Drawing Deletions

To indicate that a feature was not constructed, installed or implemented, red markups will be used to identify the associated graphics and text as deleted on the Working Hardcopy Drawings. Graphics and text associated with deleted features will be crossed out (X) or marked through. To show a drawing view (e.g., sections, details, plans, profiles, elevations, etc.) or design option is not being used, draw a red box around the drawing view or design option, place an “X” across the box and write “NOT USED” within the box. In addition, a numbered delta triangle will be provided inside the box along with notes as needed to describe the deletion. Deletions will be documented in the Issue Block with a red numbered delta triangle and description of the deletion, if necessary.

Figure 4 - Working Hardcopy Deletion

Relocated Features on Working Hardcopy Drawings

Relocated features will be identified on the Working Hardcopy Drawings. There are two acceptable methods to identify a relocated feature. The first method to identify a relocated feature will consist of a deletion of graphics and/or text from a drawing, followed by an addition of the same graphics and/or text in the revised location on the drawing. If this method is used, the Issue Block will be revised to reflect a deletion and an addition of the feature. See the previous section for specific guidance of additions and deletions.

The second method to identify a relocated feature is to draw a blue box around the entire feature and provide a note including specific details to describe the new location of the feature. Within the box, the text “RELOCATED” will be written and a numbered delta triangle will be provided in blue. If this method is utilized to identify relocated features, the relocation will be documented in the Issue Block with a blue numbered delta triangle.

If necessary, all connections for the relocated feature (e.g.,wiring piping, duct work, utilities) will be revised on the drawing(s) to accommodate the relocation.

I

REVISION OF WORKING CAD DRAWINGS

CAD Standards

USACE requires that standard professional engineering drafting practices be utilized in modifying the electronic CAD drawings to show as-built conditions. All revisions to the Government Furnished CADD Files, including any additional sheets added, shall conform to all CADD Standard requirements outlined in the contract specifications. Typically, contract specifications will require adherence to several standards including, but not limited to, the U.S. National CAD Standard, the CADD/BIM Technology Center’s A/E/C CADD Standard and/or CADD Drafting Standard, and possibly local CADD Standard Supplements or Project Specific Requirements. Please review the contract specifications thoroughly for complete understanding of required CADD Standards.

The CADD Standards listed in the contract specification will include details on Drawing File Organization, Graphic Concepts, Level/Layer Assignments, and Standard Symbology. Drawing File Organization will include the relationship between model files and sheet files, drawing sheet assembly and file naming conventions.

Graphic Concepts will include details on the use of standard line work, text, dimensions, scales and border sheets. CADD Standards will provide specific level/layer names and assignments for both sheet and model files. Finally, the CADD standards will prescribe and provide the use of Standard Symbology. The following sections provide a summary of content provided in the CAD Standards.

DRAWING FILE ORGANIZATION

Design Area In development of the Final CAD Drawings, the Design Area setup used for the Government Furnished CAD Drawings will be maintained. This setup of the Design Area is described in the CADD Standards and includes file accuracy (units), global origin and unit definitions.

Model Files and Sheet Files Model Files contain the physical components of a project (e.g., columns, walls, topography, channels, etc.).

Model files are drawn at full scale in true geographic space and typically represent plans, elevations, sections, etc. Typically, the development of Final CAD Drawings requires the update of multiple model files. A sheet file is synonymous with a plotted CAD drawing file. A sheet file is a selected view or portion of referenced model files within a border sheet. The addition of sheet-specific information (e.g., text, dimensions, and symbols) completes the development of the document. In other words, a sheet file is the “ready-to-plot” Final CADD.

CELRC-AS-BUILT-GUIDANCE-11-19-2014 9
CELRC-AS-BUILT-GUIDANCE-11-19-2014 10
CELRC-AS-BUILT-GUIDANCE-11-19-2014 11
CELRC-AS-BUILT-GUIDANCE-11-19-2014 12
CELRC-AS-BUILT-GUIDANCE-11-19-2014 13

File details come from the government source that posted it. Updated .