01g. Attachment F - Existing COMM work completed in 2022-2023.pdf

PDF 112 KB Posted

Attached to
MHMV230034 Federal contract opportunity
Solicitation number
FA940124B0004
Issued by
Department of the Air Force Materiel Command Nuclear Weapons Center

About this file

This document appears to be an Attachment G depicting the existing communications work completed in 2022-2023 for the renovation of Building 20202 East Wing at Kirtland AFB, as part of solicitation FA940124B0004.

The key details are: The renovation entails abatement and removal of existing flooring, demolition of selected walls, installation of new walls to create new office, meeting, interview, and storage spaces, new carpeting, updating communication wiring to Cat 6 standards, painting, and installation of new security doors. The existing communications work involves installing new Cat 6 cables from a patch panel to the data ports shown on the drawing, utilizing the existing cable tray in the corridor. The drawing provides a legend and floor plan view of the installed data ports and comm conduits in the 2nd floor East Wing.

View the file

Other files for this federal contract opportunity

Other files attached to MHMV230034, newest first.
File Type Posted
Solicitation Amendment FA940124B00040003 SF 30.pdf PDF
2024.08.02_Solicitation Amendment FA940124B00040002 SF 30.pdf PDF
MHMV230034 Renovate B20202 - Contractor Responses.pdf PDF
Solicitation - FA940124B0004.pdf PDF
01c. Attachment C - Ceiling Demo_Replace Plan.pdf PDF
Solicitation Amendment FA940124B00040001 SF 30.pdf PDF
01b. Attachment B - B20202 2nd Floor East Wing Conceptual Plan.pdf PDF
01e. Attachment D - EMSL Analytical, Inc Asbestos Test Report.pdf PDF
01h.Attachment H - KAFB COMM Specs Sept 2023.pdf PDF
01i. Attachment I - Slab Capacity Check Report-AIMT Engineering 28June23.pdf PDF
01. 230034-SoW-Renovate B20202-04Apr2024.pdf PDF
01a. Attachment A - Project Location Map Laydown Yard Contractor Parking.pdf PDF
01d. Attachment E - Abatement Plan Area.pdf PDF
01f. Attachment F - Fire Alarm and Fire Suppression System.pdf PDF
01a. Attachment A-B20202-CONCEPTUAL PLAN.pdf PDF
01c. Attachment C-B20202-PROJECT LOCATION MAP AND LAYDOWN YARD.pdf PDF
01d. Attachment D-B20202-EMSL ANALYTICAL_INC.TEST REPORT_ASBESTOS.pdf PDF
01. 230034-SoW-Renovate B20202-05Feb2024.pdf PDF
01b. Attachment B-B20202-FIRE ALARM & FIRE SUPPRESSION SYSTEM.pdf PDF
01e. Attachment E-B20202-ABATEMENT PLAN AREA.pdf PDF
Solicitation - FA940124B0004.pdf PDF
01f. Attachment F-B20202-COMM WORK COMPLETED IN 2022-2023.pdf PDF
01g. Attachment G-KAFB COMM SPECS SEPT 2023.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U

U

T

T

S

S

R

R

Q

Q

P

P

O

O

N

N

MK

P-2

P-1

2 2

PRINTER

2 2

48 PORT CAT6 PATCH PANEL

CAT6 INSTALLED UP TO POLES ALONG COLUMNS,

BUT TO BE INSTALLED IN WALLS

EXISTING DATA-COMMS SYSTEM LEGEND:

INSTALLED DATA PORTS

DATA COMM CONDUIT

LIMITS OF CONSTRUCTION

Building - 20202 - 2ND FLOOR, EAST WING - ATTACHMENT G - EXISTING COMM WORK COMPLETED IN 2022/2023

1" = 1'-0"

KIRTLAND AFB

GENERAL NOTE:

INSTALLED NEW CAT6 CABLES FROM

PATCH PANEL TO DATA PORTS SHOWN

(USE EXISTING CABLE TRAY IN CORRIDOR)

Sheets and Views
Bldg - 20202-2 - EAST WING - ATTACHMENT G - EXISTING COMM WORK COMPLETED IN 2022-2023