01b. Attachment B - B20202 2nd Floor East Wing Conceptual Plan.pdf

PDF 257 KB Posted

Attached to
MHMV230034 Federal contract opportunity
Solicitation number
FA940124B0004
Issued by
Department of the Air Force Materiel Command Nuclear Weapons Center

About this file

This document is a conceptual floor plan for the renovation of the 2nd floor East Wing of Building 20202 at Kirtland Air Force Base in New Mexico. The project, solicited under Solicitation Number FA940124B0004, will renovate approximately 5,500 square feet of interior space, including abatement and removal of existing flooring, demolition of selected walls, installation of new walls to create new office, meeting, interview, and storage spaces, new carpeting, updated communication wiring, painting, and installation of new security doors. The renovations will be performed for the Department of the Air Force Materiel Command Nuclear Weapons Center. The document provides a detailed layout of the proposed renovations, including the locations of new walls, doors, audio/visual equipment, and security features.

View the file

Other files for this federal contract opportunity

Other files attached to MHMV230034, newest first.
File Type Posted
Solicitation Amendment FA940124B00040003 SF 30.pdf PDF
2024.08.02_Solicitation Amendment FA940124B00040002 SF 30.pdf PDF
MHMV230034 Renovate B20202 - Contractor Responses.pdf PDF
01a. Attachment A - Project Location Map Laydown Yard Contractor Parking.pdf PDF
01d. Attachment E - Abatement Plan Area.pdf PDF
01f. Attachment F - Fire Alarm and Fire Suppression System.pdf PDF
01. 230034-SoW-Renovate B20202-04Apr2024.pdf PDF
01g. Attachment F - Existing COMM work completed in 2022-2023.pdf PDF
Solicitation Amendment FA940124B00040001 SF 30.pdf PDF
01e. Attachment D - EMSL Analytical, Inc Asbestos Test Report.pdf PDF
01h.Attachment H - KAFB COMM Specs Sept 2023.pdf PDF
01i. Attachment I - Slab Capacity Check Report-AIMT Engineering 28June23.pdf PDF
Solicitation - FA940124B0004.pdf PDF
01c. Attachment C - Ceiling Demo_Replace Plan.pdf PDF
01g. Attachment G-KAFB COMM SPECS SEPT 2023.pdf PDF
Solicitation - FA940124B0004.pdf PDF
01f. Attachment F-B20202-COMM WORK COMPLETED IN 2022-2023.pdf PDF
01. 230034-SoW-Renovate B20202-05Feb2024.pdf PDF
01b. Attachment B-B20202-FIRE ALARM & FIRE SUPPRESSION SYSTEM.pdf PDF
01e. Attachment E-B20202-ABATEMENT PLAN AREA.pdf PDF
01a. Attachment A-B20202-CONCEPTUAL PLAN.pdf PDF
01c. Attachment C-B20202-PROJECT LOCATION MAP AND LAYDOWN YARD.pdf PDF
01d. Attachment D-B20202-EMSL ANALYTICAL_INC.TEST REPORT_ASBESTOS.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U

U

T

T

S

S

R

R

Q

Q

P

P

O

O

N

N

MK

SFS

Reports

Analysis

SFG-Battle Staff Conf Rm

Interview

Room

SFS/S2R

Records Storage and Clearing

Barrel

SFS/CSS

SFS/CSS

SFS/SEL

SFS/S2

Office

Waiting

Area

Evidence Rm

Conference

Conference

FOUND

PROPERTY

ROOM

VIEWING RM

/EQUIPMENT

STORAGE

SF CC

HALLWAY

H A

L L

W A

Y

P-2

P-1

HALLWAY

COMM/

SERVER

RM

MENS RR

WOMENS RR

Interview

Room

7 7

1414 13

PROPOSED/NEW WALLS

INTERIOR WALLS FROM

FLOOR TO LAY-IN CEILING

SOUND RATED WALLS

FULL HEIGHT SECURITY WALL FROM

FLOOR TO DECK ABOVE

EXISTING WALLS TO REMAIN

SOUND INSULATED WALLS PER S.O.W.

KEY NOTES:

SOUND RATED WALLS TO BOTTOM OF DECK

WALLS FROM FLOOR TO LAY-IN CEILING

WALL AND DOOR TO BE REMOVED

EXISTING WALLS HAS FRAMING EXTENDED TO

BOTTOM OF DECK. MODIFY TO BE SOUND

RATED

NEW DOOR WITH CIPHER LOCK ROUGH IN

CIPHER LOCKED DOOR TO REMAIN

NEW KEYED LOCKED DOOR

NEW DOOR TO MEET STC RATING OF 45 WITH

CIPHER LOCK ROUGH IN

DEMO PA SYSTEM IN CEILING AND REPLACE

WITH NEW 24"x24"CEILING TILE

WINDOW SECURITY BARS

SECURITY WALLS FROM FLOOR TO DECK

ABOVE

EXISTING HEAT PUMP (HP-3) TO REMAIN

AUDIO/VIDEO FEED

VIDEO CAMERA ROUGH IN

SOUND INSULATED WALLS PER S.O.W.

DATA-COMMS SYSTEM LEGEND:

PROPOSED DATA - COMMS

CONNECTION LOCATION

TV / MONITOR

LIMITS OF CONSTRUCTION

1" = 1'-0"

KIRTLAND AFB

Building - 20202 - 2ND FLOOR, EAST WING - ATTACHMENT B - CONCEPTUAL PLAN

Sheets and Views
Bldg - 20202-2 - EAST WING - ATTACHMENT B - CONCEPTUAL PLAN

File details come from the government source that posted it. Updated .