01a. Attachment A-B20202-CONCEPTUAL PLAN.pdf
PDF 288 KB Posted
- Attached to
- MHMV230034 Federal contract opportunity
- Solicitation number
- FA940124B0004
About this file
This document appears to be an attachment titled "Attachment A-B20202-CONCEPTUAL PLAN" related to a federal contract opportunity for the renovation of Building 20202 at Kirtland Air Force Base.
The contract opportunity, identified as FA940124B0004 with the name "MHMV230034 Renovate B20202", is for the renovation of the second floor of the East Wing of Building 20202, consisting of approximately 5,500 square feet. The renovation includes abatement and removal of existing flooring, demolition of selected walls, installation of new walls to create new office, meeting room, interview room, and storage spaces, installation of new carpeting, updating communication wiring to new Cat 6 standards, painting, and installation of new security doors. The project will not construct any additional area under the roof. The contracting agency is the Department of the Air Force Materiel Command Nuclear Weapons Center.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U
U
T
T
S
S
R
R
Q
Q
P
P
O
O
N
N
MK
SFS
Reports
Analysis
SFG-Battle Staff Conf Rm
SFS/S2R
SFS/S2R
Records Storage and Clearing
Barrel
S21
SFS/CSS
SFS/CSS
SFS/SEL
SFS/S2
Office
W a i t i n g a r e a
Evidence Rm
Conference
SFS/S2R
S21
SFS/S2
Interview
Equipment
Rm
SFS/S2
Interview
SF CC
HALLWAY
H A
L L
W A
Y
2143 2145
2146 2148
HALLWAY
COMMS/
SERVER
RM
MENS RR
WOMENS RR
4" 9"
HP-3 HP-3
PROPOSED/NEW WALLS
INTERIOR WALLS FROM
FLOOR TO LAY-IN CEILING
SOUND RATED WALLS FROM
FLOOR TO DECK ABOVE
FULL HEIGHT SECURITY WALL FROM
FLOOR TO DECK ABOVE
EXISTING WALLS TO REMAIN
KEY NOTES:
SOUND RATED WALLS TO BOTTOM OF DECK
WALLS FROM FLOOR TO LAY-IN CEILING
WALL AND DOOR TO BE REMOVED
EXISTING WALLS HAS FRAMING EXTENDED TO
BOTTOM OF DECK. MODIFY TO BE SOUND
RATED
NEW CIPHER LOCKED DOOR
CIPHER LOCKED DOOR TO REMAIN
NEW KEYED LOCKED DOOR
NOT USED
DEMO PA SYSTEM IN CEILING AND REPLACE
WITH NEW 24"x24"CEILING TILE
WINDOW SECURITY BARS
SECURITY WALLS FROM FLOOR TO DECK
ABOVE
EXISTING HEAT PUMP (HP-3) TO REMAIN
DATA-COMMS SYSTEM LEGEND:
PROPOSED DATA - COMMS
CONNECTION LOCATION
TV / MONITOR
CONSTRUCTION BOUNDRY
1" = 1'-0"
KIRTLAND AFB
Building - 20202 - 2ND FLOOR, EAST WING - ATTACHMENT A - CONCEPTUAL PLAN