Amendment 0003.doc

DOC document 39 KB Posted

Attached to
BASE SUPPLY MANAGEMENT SERVICES
Solicitation number
FA9401-12-R-0012
Issued by

About this file

Base Supply Management Services Amendment 0003

View the file

Other files

File Type Posted
Amendment 0004.doc DOC document
Questions and Answers 3.xlsx XLSX spreadsheet
Supply PWS revised 20 Jun 12.docx DOCX document
Supply PWS revised 15 Jun 2012.docx DOCX document
Questions and Answers 2.xlsx XLSX spreadsheet
APPENDIX M GOVERNMENT FURNISHED FACILITIES Revised.docx DOCX document
APPENDIX L GOVERNMENT FURNISHED PROPERTY Revised.docx DOCX document
APPENDIX D KIRTLAND SUPPLY WORKLOAD DATA Revised.docx DOCX document
Conform Copy RFP 11Jun12.doc DOC document
Revised ADDENDUM TO FAR 52.212-4 11Jun12.pdf PDF
Questions and Answers 1.xlsx XLSX spreadsheet
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Revised ADDENDUM TO FAR 52.212-4.pdf PDF
Supply PWS.docx DOCX document
APPENDICES.pdf PDF
Wage Determination No.2005-2361.pdf PDF
Supply 52.212-1.docx DOCX document
2009 Supply Kirtland CBA.pdf PDF
Supply RFP.doc DOC document
ADDENDUM TO 52.212-4.pdf PDF
DD Form 254.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

1.Add the following verbiage to PWS paragraph 1.1.2: Support for offsite locations includes, but is not limited to Equipment Accountability Element support.

2. Add the following verbiage to PWS paragraph 1.3.4.2.4: and available for review by COR personnel upon request.

3. Delete the following paragraph from PWS paragraph 1.10.3: All personnel shall be trained in the use of fire extinguishers within the first two weeks of the transition period and annually thereafter. Training documentation shall be maintained by the contractor and available for review by COR personnel upon request. PWS paragraphs 1.10.4 and 1.10.5 are renumbered to read 1.10.3 and 1.10.4, respectively.

4. Add the following verbiage to PWS paragraph 2.6: Additionally, EAE will be required to perform a minimum of one annual organization visit to offsite locations. Normal/daily support for offsite locations will be conducted by EAE personnel at Kirtland AFB, NM.

5. Add the following verbiage to PWS paragraph 2.6.5: to include offsite locations.

6. Add workload data to Appendix D: There are currently 389 equipment items at offsite locations. This number constantly changes as equipment is turned in or added to offsite equipment accounts.

7. Add government furnished property “manufacture date and current operating hour” columns to Appendix L.

8. Add “outside storage area, 27,835 Sq Ft” to Appendix M.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .