Attach L-06 COST_MODEL_v3.xlsx
XLSX spreadsheet 58 KB Posted
- Attached to
- Request for Proposal Federal contract opportunity
- Solicitation number
- FA9304-19-R-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised RFP v5.pdf | ||
| FA9304-19-R-0002 RFP v.4.pdf | ||
| Industry Day Questions and Answers v1.docx | DOCX document | |
| Part 2 Industry Day Question and Answers Task Order Answers.docx | DOCX document | |
| Rev_RFP Final _v3.pdf | ||
| Attach L-05 Contractor Relevancy Assessment v2.pdf | ||
| Rev_RFP Final_v2.pdf | ||
| Attach L-06 COST_MODEL _v2.xlsx | XLSX spreadsheet | |
| Attach L-01 Subcontractor Consent Letter.docx | DOCX document | |
| Attach L-05 Offeror Relevacy Assessement.docx | DOCX document | |
| Attach L-04 Client Authorization Letter.docx | DOCX document | |
| Attach L-02 Past Performance Questionaire.docx | DOCX document | |
| Attach L-03 Past Performance Questionaire Request Letter.docx | DOCX document | |
| EWIC INDUSTRY DAY Technical.pptx | PPTX presentation | |
| EWIC Industry Day Contracting.pptx | PPTX presentation | |
| Interested Party List.docx | DOCX document | |
| Fillable L-06 COST_MODEL.xlsx | XLSX spreadsheet | |
| Rev_RFP Final.pdf | ||
| RFP Final.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B
| SECTION B | |||||
| OFFEROR: | |||||
| LABOR | ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | FIXED FEE | ESTIMATED COST PLUS FIXED FEE |
| 0001 | Labor | ||||
| PSC: AD24 | |||||
| The contractor shall provide all necessary services in support of the work required in accordance with the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 0001. | |||||
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | FIXED FEE | ESTIMATED COST PLUS FIXED FEE | |
| 1001 | Labor - Option Year One | ||||
| PSC: AD24 | |||||
| The contractor shall provide all necessary services in support of the work required in accordance with the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 1001. | |||||
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | FIXED FEE | ESTIMATED COST PLUS FIXED FEE | |
| 2001 | Labor - Option Year Two | ||||
| PSC: AD24 | |||||
| The contractor shall provide all necessary services in support of the work required in accordance with the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 2001. | |||||
| SUBCONTRACTS | ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | FIXED FEE | ESTIMATED COST PLUS FIXED FEE |
| 0002 | Subcontracts | $27,195,000.00 | |||
| PSC: AD24 | |||||
| The contractor shall provide all necessary subcontract supplies and services in support of the work required in accordance with the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 0001 |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | FIXED FEE | ESTIMATED COST PLUS FIXED FEE |
| 1002 | Subcontracts - Option Year One | $2,775,000.00 | ||
| PSC: AD24 | ||||
| The contractor shall provide all necessary subcontract supplies and services in support of the work required in accordance with the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 1001 |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | FIXED FEE | ESTIMATED COST PLUS FIXED FEE |
| 2002 | Subcontracts - Option Year Two | $2,220,000.00 | ||
| PSC: AD24 | ||||
| The contractor shall provide all necessary subcontract supplies and services in support of the work required in accordance with the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 2001 |
| OTHER DIRECT COSTS (ODCs) | ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST |
| 0003 | Other Direct Costs | $7,750,000.00 | |
| PSC: AD24 | |||
| This CLIN consists of all other direct costs such as travel, materials, supplies, and equipment in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 0001. | |||
| ITEM NO | SUPPLIES/SERVICES | $925,000.00 | |
| 1003 | Other Direct Costs - Option Year One | ||
| PSC: AD24 | |||
| This CLIN consists of all other direct costs such as travel, materials, supplies, and equipment in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 1001. | |||
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | |
| 2003 | Other Direct Costs - Option Year Two | $780,000.00 | |
| PSC: AD24 | |||
| This CLIN consists of all other direct costs such as travel, materials, supplies, and equipment in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 1002. | |||
| DATA | ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST |
| 0004 | Data | NSP* | |
| PSC: AD24 | |||
| The Contractor shall furnish all data as required by the Contract Data Requirements Lists (CDRLs), DD Form 1423-1, provided in Section J, Exhibit A. This CLIN is not separately priced. Costs associated with this CLIN shall be included in CLIN 0001. | |||
| *NSP – Not Separately Priced | |||
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | |
| 1004 | Data - Option Year 1 | NSP* | |
| PSC: AD24 | |||
| The Contractor shall furnish all data as required by the Contract Data Requirements Lists (CDRLs), DD Form 1423-1, provided in Section J, Exhibit A. This CLIN is not separately priced. Costs associated with this CLIN shall be included in CLIN 1001. | |||
| *NSP – Not Separately Priced | |||
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | |
| 2004 | Data - Option Year Two | NSP* | |
| PSC: AD24 | |||
| The Contractor shall furnish all data as required by the Contract Data Requirements Lists (CDRLs), DD Form 1423-1, provided in Section J, Exhibit A. This CLIN is not separately priced. Costs associated with this CLIN shall be included in CLIN 2001. | |||
| *NSP – Not Separately Priced | |||
| CONTRACTOR ACQUIRED PROPERTY (CAP) | ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST |
| 0005 | Contractor Acquired Property (CAP) | $150,000.00 | |
| PSC: AD24 | |||
| This CLIN consists of direct costs for Contractor Acquired Propety (CAP) in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 0001. |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST |
| 1005 | Contractor Acquired Property - Option Year One | $30,000.00 |
| PSC: AD24 | ||
| This CLIN consists of direct costs for Contractor Acquired Propety (CAP) in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 1001. |
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | |
| 2005 | Contractor Acquired Property - Option Year Two | $20,000.00 | |
| PSC: AD24 | |||
| This CLIN consists of direct costs for Contractor Acquired Propety (CAP) in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 2001. | |||
| OPERATIONS & MAINTENANCE (O&M) | ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST |
| 0006 | Operations and Maintenance (O&M) | $150,000.00 | |
| PSC: AD24 | |||
| This CLIN consists of direct costs for Operations and Maintenance (O&M) efforts in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 2001. | |||
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | |
| 1006 | Operations and Maintenance (O&M) - Option Year One | $30,000.00 | |
| PSC: AD24 | |||
| This CLIN consists of direct costs for Operations and Maintenance (O&M) efforts in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 2001. | |||
| ITEM NO | SUPPLIES/SERVICES | ESTIMATED COST | |
| 2006 | Operations and Maintenance (O&M) - Option Year Two | $20,000.00 | |
| PSC: AD24 | |||
| This CLIN consists of direct costs for Operations and Maintenance (O&M) efforts in direct support of the Statement of Work (SOW) titled, "Electronic Warfare Improvement Capabilites" dated XX October 2019, provided in Section J, Attachment 1. The contractor shall provide data as specified in individual orders and IAW with the CDRLs (DD1423-1) provided in Section J, Exhibit A. Applicable CDRLs will be listed within each individual order and all costs associated with CDRLs shall be included in CLIN 2001. | |||
| Total |
&"Times New Roman,Regular"&12Attachment L-06 Cost Model
INDIRECT RATES TEMPLATE
| INDIRECT RATES | |
| OFFEROR: | ERROR:#VALUE! |
| FY-20 | FY-21 | FY-22 | FY-23 | FY-24 | FY-25 | FY-26 | FY-27 | |
| FRINGE | ||||||||
| OVERHEAD (OH) 1 | ||||||||
| OVERHEAD (OH) 2 | ||||||||
| MATERIAL AND HANDLING OH | ||||||||
| GENERAL AND ADMINISTRATIVE | ||||||||
| PRIME FEE | ||||||||
| SUBCONTRACT FEE | ||||||||
| COM |
LATEST INDIRECT RATE REPORT INFORMATION
| Audit Agency Name |
| Audit Agency DoDAAC |
| Report Type |
| Report # |
| Report Title |
| Report Date |
&"Times New Roman,Regular"&9Development, Modification, and Upgrade to Software and Firmware of ESM Systems/Subsystems &"Times New Roman,Regular"&9Solicitation No.: N00173-16-R-EB05 Cost Proposal - Task order Attachment 06 – Cost Workbook
LABOR BUILD-UP TEMPLATE
| Labor Rate Build-Up | |
| OFFEROR: | ERROR:#VALUE! |
| CHARTS BELOW MAY NOT BE EDITED. | ||||||||||||||||||||
| 1. DIRECT LABOR RATE BUILD-UP | INPUT "0" for the non-applicable OH | |||||||||||||||||||
| Fringe | Overhead (OH) 1 | OH 2 | Material OH | G&A | Burdened Rate | Fee | Burdened | Escalation FY-19 | Escalation FY-20 | Escalation FY-21 | Escalation FY-22 | Escalation FY-23 | Escalation FY-24 | Escalation FY-25 | Escalation FY26 | Escalation FY-27 | ||||
| Labor Category | Company Equivalent Job Classification | Employee Name | Base Rate | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | Rate w/ Fee | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ||
| Sr. Program Mgr | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Program Mgr | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Program Mgr Off-Site | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr.Analyst | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Analyst | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr Programmer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Programmer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Programmer Off-Site | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Entry Level Programmer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Scenario Developer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Intern | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Logistician | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr. Test Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Test Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr. Manufacturing Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Manufacturing Eng | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr. Drafter | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Drafter | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr. Mechanical Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Mechanical Eng | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr. Electrical Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Electrical Eng | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr. Systems Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Systems Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Sr. RF Engineer | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| RF Eng | $0.00 | 0.00% | 0.00% | 0.00% | 0.00% | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Indirect | G&A | |||||||||||||||||||
| Material overhead; | Salary and other costs of the executive staff of the corporate or home office; | |||||||||||||||||||
| Manufacturing overhead; | Salary and other costs of such staff services as legal, accounting, public relations, and financial offices; and | |||||||||||||||||||
| Engineering overhead; | Selling and marketing expenses | |||||||||||||||||||
| Field Service overhead; and | ||||||||||||||||||||
| Site overhead. |
&"Times New Roman,Regular"&9Development, Modification, and Upgrade to Software and Firmware of ESM Systems/Subsystems &"Times New Roman,Regular"&9Solicitation No.: N00173-16-R-EB05
SUMMARY TEMPLATE
Cost Summary Format
OFFEROR: ERROR:#VALUE!
COST SUMMARY FORMAT -- 5 Year Period of Performance and Two 1 Year Options
| Total | FY 2020 | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | FY2026 | FY2027 | FY2028 | |||||||||||||||||||||
| PRIME CONTRACTOR DIRECT LABOR | Labor Category (LCAT) | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Direct Labor | ||||||||||||||||||||||||||||||
| Sr. Program Mgr | LCAT | 1,487 | $0.00 | $0.00 | 200.0 | $0.00 | $0.00 | 204.0 | $0.00 | $0.00 | 208.1 | $0.00 | $0.00 | 212.2 | $0.00 | $0.00 | 216.5 | $0.00 | $0.00 | 220.8 | $0.00 | $0.00 | 225.2 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Program Mgr | LCAT | 3,717 | $0.00 | $0.00 | 500.0 | $0.00 | $0.00 | 510.0 | $0.00 | $0.00 | 520.2 | $0.00 | $0.00 | 530.6 | $0.00 | $0.00 | 541.2 | $0.00 | $0.00 | 552.0 | $0.00 | $0.00 | 563.0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Program Mgr Off-Site | LCAT | 2,974 | $0.00 | $0.00 | 400.0 | $0.00 | $0.00 | 408.0 | $0.00 | $0.00 | 416.2 | $0.00 | $0.00 | 424.5 | $0.00 | $0.00 | 433.0 | $0.00 | $0.00 | 441.6 | $0.00 | $0.00 | 450.4 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Sr.Analyst | LCAT | 5,204 | $0.00 | $0.00 | 700.0 | $0.00 | $0.00 | 714.0 | $0.00 | $0.00 | 728.3 | $0.00 | $0.00 | 742.8 | $0.00 | $0.00 | 757.7 | $0.00 | $0.00 | 772.9 | $0.00 | $0.00 | 788.4 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Analyst | LCAT | 3,717 | $0.00 | $0.00 | 500.0 | $0.00 | $0.00 | 510.0 | $0.00 | $0.00 | 520.2 | $0.00 | $0.00 | 530.6 | $0.00 | $0.00 | 541.2 | $0.00 | $0.00 | 552.0 | $0.00 | $0.00 | 563.0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Sr Programmer | LCAT | 12,638 | $0.00 | $0.00 | 1,700.0 | $0.00 | $0.00 | 1,734.0 | $0.00 | $0.00 | 1,768.7 | $0.00 | $0.00 | 1,804.1 | $0.00 | $0.00 | 1,840.1 | $0.00 | $0.00 | 1,876.9 | $0.00 | $0.00 | 1,914.4 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Programmer | LCAT | 8,921 | $0.00 | $0.00 | 1,200.0 | $0.00 | $0.00 | 1,224.0 | $0.00 | $0.00 | 1,248.5 | $0.00 | $0.00 | 1,273.4 | $0.00 | $0.00 | 1,298.9 | $0.00 | $0.00 | 1,324.9 | $0.00 | $0.00 | 1,351.4 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Programmer Off-Site | LCAT | 5,576 | $0.00 | $0.00 | 750.0 | $0.00 | $0.00 | 765.0 | $0.00 | $0.00 | 780.3 | $0.00 | $0.00 | 795.9 | $0.00 | $0.00 | 811.8 | $0.00 | $0.00 | 828.1 | $0.00 | $0.00 | 844.7 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Entry Level Programmer | LCAT | 5,576 | $0.00 | $0.00 | 750.0 | $0.00 | $0.00 | 765.0 | $0.00 | $0.00 | 780.3 | $0.00 | $0.00 | 795.9 | $0.00 | $0.00 | 811.8 | $0.00 | $0.00 | 828.1 | $0.00 | $0.00 | 844.7 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Scenario Developer | LCAT | 2,974 | $0.00 | $0.00 | 400.0 | $0.00 | $0.00 | 408.0 | $0.00 | $0.00 | 416.2 | $0.00 | $0.00 | 424.5 | $0.00 | $0.00 | 433.0 | $0.00 | $0.00 | 441.6 | $0.00 | $0.00 | 450.4 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Intern | LCAT | 5,576 | $0.00 | $0.00 | 750.0 | $0.00 | $0.00 | 765.0 | $0.00 | $0.00 | 780.3 | $0.00 | $0.00 | 795.9 | $0.00 | $0.00 | 811.8 | $0.00 | $0.00 | 828.1 | $0.00 | $0.00 | 844.7 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Logistician | LCAT | 1,859 | $0.00 | $0.00 | 250.0 | $0.00 | $0.00 | 255.0 | $0.00 | $0.00 | 260.1 | $0.00 | $0.00 | 265.3 | $0.00 | $0.00 | 270.6 | $0.00 | $0.00 | 276.0 | $0.00 | $0.00 | 281.5 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Sr. Test Engineer | LCAT | 7,434 | $0.00 | $0.00 | 1,000.0 | $0.00 | $0.00 | 1,020.0 | $0.00 | $0.00 | 1,040.4 | $0.00 | $0.00 | 1,061.2 | $0.00 | $0.00 | 1,082.4 | $0.00 | $0.00 | 1,104.1 | $0.00 | $0.00 | 1,126.2 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Test Engineer | LCAT | 5,576 | $0.00 | $0.00 | 750.0 | $0.00 | $0.00 | 765.0 | $0.00 | $0.00 | 780.3 | $0.00 | $0.00 | 795.9 | $0.00 | $0.00 | 811.8 | $0.00 | $0.00 | 828.1 | $0.00 | $0.00 | 844.7 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Sr. Manufacturing Engineer | LCAT | 2,974 | $0.00 | $0.00 | 400.0 | $0.00 | $0.00 | 408.0 | $0.00 | $0.00 | 416.2 | $0.00 | $0.00 | 424.5 | $0.00 | $0.00 | 433.0 | $0.00 | $0.00 | 441.6 | $0.00 | $0.00 | 450.4 | $0.00 | ||||||
| Manufacturing Eng | LCAT | 2,230 | $0.00 | $0.00 | 300.0 | $0.00 | $0.00 | 306.0 | $0.00 | $0.00 | 312.1 | $0.00 | $0.00 | 318.4 | $0.00 | $0.00 | 324.7 | $0.00 | $0.00 | 331.2 | $0.00 | $0.00 | 337.8 | $0.00 | ||||||
| Sr. Drafter | LCAT | 2,230 | $0.00 | $0.00 | 300.0 | $0.00 | $0.00 | 306.0 | $0.00 | $0.00 | 312.1 | $0.00 | $0.00 | 318.4 | $0.00 | $0.00 | 324.7 | $0.00 | $0.00 | 331.2 | $0.00 | $0.00 | 337.8 | $0.00 | ||||||
| Drafter | LCAT | 1,115 | $0.00 | $0.00 | 150.0 | $0.00 | $0.00 | 153.0 | $0.00 | $0.00 | 156.1 | $0.00 | $0.00 | 159.2 | $0.00 | $0.00 | 162.4 | $0.00 | $0.00 | 165.6 | $0.00 | $0.00 | 168.9 | $0.00 | ||||||
| Sr. Mechanical Engineer | LCAT | 7,434 | $0.00 | $0.00 | 1,000.0 | $0.00 | $0.00 | 1,020.0 | $0.00 | $0.00 | 1,040.4 | $0.00 | $0.00 | 1,061.2 | $0.00 | $0.00 | 1,082.4 | $0.00 | $0.00 | 1,104.1 | $0.00 | $0.00 | 1,126.2 | $0.00 | ||||||
| Mechanical Eng | LCAT | 3,717 | $0.00 | $0.00 | 500.0 | $0.00 | $0.00 | 510.0 | $0.00 | $0.00 | 520.2 | $0.00 | $0.00 | 530.6 | $0.00 | $0.00 | 541.2 | $0.00 | $0.00 | 552.0 | $0.00 | $0.00 | 563.0 | $0.00 | ||||||
| Sr. Electrical Engineer | LCAT | 9,293 | $0.00 | $0.00 | 1,250.0 | $0.00 | $0.00 | 1,275.0 | $0.00 | $0.00 | 1,300.5 | $0.00 | $0.00 | 1,326.5 | $0.00 | $0.00 | 1,353.0 | $0.00 | $0.00 | 1,380.1 | $0.00 | $0.00 | 1,407.7 | $0.00 | ||||||
| Electrical Eng | LCAT | 7,434 | $0.00 | $0.00 | 1,000.0 | $0.00 | $0.00 | 1,020.0 | $0.00 | $0.00 | 1,040.4 | $0.00 | $0.00 | 1,061.2 | $0.00 | $0.00 | 1,082.4 | $0.00 | $0.00 | 1,104.1 | $0.00 | $0.00 | 1,126.2 | $0.00 | ||||||
| Sr. Systems Engineer | LCAT | 3,717 | $0.00 | $0.00 | 500.0 | $0.00 | $0.00 | 510.0 | $0.00 | $0.00 | 520.2 | $0.00 | $0.00 | 530.6 | $0.00 | $0.00 | 541.2 | $0.00 | $0.00 | 552.0 | $0.00 | $0.00 | 563.0 | $0.00 | ||||||
| Systems Engineer | LCAT | 2,230 | $0.00 | $0.00 | 300.0 | $0.00 | $0.00 | 306.0 | $0.00 | $0.00 | 312.1 | $0.00 | $0.00 | 318.4 | $0.00 | $0.00 | 324.7 | $0.00 | $0.00 | 331.2 | $0.00 | $0.00 | 337.8 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Sr. RF Engineer | LCAT | 11,151 | $0.00 | $0.00 | 1,500.0 | $0.00 | $0.00 | 1,530.0 | $0.00 | $0.00 | 1,560.6 | $0.00 | $0.00 | 1,591.8 | $0.00 | $0.00 | 1,623.6 | $0.00 | $0.00 | 1,656.1 | $0.00 | $0.00 | 1,689.2 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| RF Eng | LCAT | 5,576 | $0.00 | $0.00 | 750.0 | $0.00 | $0.00 | 765.0 | $0.00 | $0.00 | 780.3 | $0.00 | $0.00 | 795.9 | $0.00 | $0.00 | 811.8 | $0.00 | $0.00 | 828.1 | $0.00 | $0.00 | 844.7 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Total Direct Labor Cost | 132,330 | $0.00 | 17,800 | $0.00 | 18,156 | $0.00 | 18,519 | $0.00 | 18,890 | $0.00 | 19,267 | $0.00 | 19,653 | $0.00 | 20,046 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | ||||||||||
| Prime Contractor Indirect Labor Cost | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | |||||||||||
| Fringe Benefits | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | |||||||||||
| Off-Site Overhead (KTR Facility) | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | |||||||||||
| G&A | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | |||||||||||||||||
| Total Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||||||||||||||
| Total Direct and Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||||||||||||||
| COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||
| Total Prime Contractor Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||||||||||||||
| Subcontractor Labor Cost | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | |
| Name/Company | LCAT | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Total Proposed Subcontractor Labor Cost | - 0 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | - 0 | $0.00 | |||||||||||||
| Prime contractor pass through (not including fee) | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | ||||||||||||
| Material & Handling | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | ||||||||||||
| G&A | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | ||||||||||||
| Total Subcontractor Labor and Indirect Cost | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ||||||||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||||||||||||||
| Fee | Rate | Amount | Amount | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | ||||||||||||||
| Fixed Fee - Prime Labor Costs Only | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | ||||||||||||
| Fixed Fee - Subcontract Labor Costs Only | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | 0.00% | ERROR:#REF! | |||||||||||||
| Total Fee (for Prime and Subcontractor Labor Costs) | $0.00 | $0.00 | $0.00 | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ||||||||||||||||||||||
| Total Labor Cost Plus Fixed Fee (CPFF) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ||||||||||||||||||||
| Other Direct Costs | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | ||||||||||||
| ODC - Gov't Plug | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 | ||||||||||||||||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||||||||||||||
| M&H | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | ||||||||||||
| G&A | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | ||||||||||||
| Total ODC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 |
&"Times New Roman,Regular"&9Development, Modification, and Upgrade to Software and Firmware of ESM Systems/Subsystems &"Times New Roman,Regular"&9Solicitation No.: N00173-16-R-EB05
REQUIREMENTS
| Labor | Requirements | Experience Definition |
| Sr. Program Mgr | Manages and oversees task orders. Responsibilities include the coordination and completion of task orders on time within budget and within scope. Oversee all aspects of the task orders. Set deadlines, assign responsibilities and monitor and summarize progress of task orders. Prepare reports for the Governemnt regarding status of task orders. | Senior Position is defined as having 15 years of experience (3 years granted for an applicable BS, 5 years granted for an MBA or equivalent) |
| Program Mgr | ||
| Program Mgr Off-Site | Defined as not located at a primary contractor facility | |
| Sr.Analyst | Review, analyze and evaluate business systems and user needs. Document requirements, define scope and objectives and formulate systems to parallel overall business strategies. | Senior Position is defined as having 10 years of experience (3 years granted for an applicable BS, 5 years granted for an applicable MS) |
| Analyst | ||
| Sr Programmer | Determine and identify high-level functional and technical requirements on the basis of interactions with the user community and knowledge of enterprise architecture. Design architectures, including the software, hardware and communications, to support the total requirements, as well as to provide for present and future cross-functional requirements and interfaces. Provide quality assurance review and the evaluation of existing and new software products. Develop high-level system design diagrams for program design, coding, testing, debugging and documentation. Develop and implement moderate to complex web applications on one or more platforms. | Senior Position is defined as having 10 years of experience (3 years granted for an applicable BS, 5 years granted for an applicable MS, and 7 years granted for an applicable Doctorate) |
| Programmer | ||
| Programmer Off-Site | Defined as not located at a primary contractor facility | |
| Entry Level Programmer | Entry Level Position is defined as having less than 3 years of experience | |
| Scenario Developer | Designs and develops the test scenarios that would be used for testing hardware or software platforms developed, updated, or integrates through task orders. | |
| Intern | May provide suport or work for any of the other requirements within skill set. | A student that is a part time or full time employee working to gain experience during their education |
| Logistician | Deals with the procurement, maintenance, and transportation of materials and/or facilities. | |
| Sr. Test Engineer | Determines how to create a process that would best test a particular product in manufacturing and related disciplines in order to assure that the product meets applicable specifications. Responsible for determining the best way a test can be performed in order to achieve adequate test coverage. | Senior Position is defined as having 10 years of experience (3 years granted for an applicable BS, 5 years granted for an applicable MS, and 7 years granted for an applicable Doctorate) |
| Test Engineer | ||
| Sr. Manufacturing Engineer | Plan the practices of manufacturing; research and develop tools, processes, machines and equipment; and integrate the facilities and systems for producing quality products with the optimum expenditure of capital | Senior Position is defined as having 10 years of experience (3 years granted for an applicable BS, 5 years granted for an applicable MS, and 7 years granted for an applicable Doctorate) |
| Manufacturing Eng | ||
| Sr. Drafter | Makes detailed technical drawings or plans for machinery, buildings, electronics, infrastructure, sections, etc. Uses computer software and manual sketches to convert the designs, plans, and layouts of engineers and architects into a set of technical drawings.Operate as the supporting developers and sketch engineering designs and drawings from preliminary design concepts. | Senior Position is defined as having 10 years of experience (2 years granted for an applicable degree) |
| Drafter | ||
| Sr. Mechanical Engineer | Applies engineering physics, engineering mathematics, and materials science principles to design, analyze, manufacture, and maintain mechanical system. | Senior Position is defined as having 10 years of experience (3 years granted for an applicable BS, 5 years granted for an applicable MS, and 7 years granted for an applicable Doctorate) |
| Mechanical Eng | ||
| Sr. Electrical Engineer | Focuses on areas of computer engineering, power engineering, telecommunications, signal processing, instrumentation, and electronics. Applies these areas to design, analyze, manufacture, an maintain electrical systems. | Senior Position is defined as having 10 years of experience (3 years granted for an applicable BS, 5 years granted for an applicable MS, and 7 years granted for an applicable Doctorate) |
| Electrical Eng | ||
| Sr. Systems Engineer | Produces plans and procedures on how to design and manage complex systems over their life cycles. | Senior Position is defined as having 10 years of experience (3 years granted for an applicable BS, 5 years granted for an applicable MS, and 7 years granted for an applicable Doctorate) |
| Systems Engineer | ||
| Sr. RF Engineer | Design antenna systems to provide radiative coverage of a specified geographical area by an electromagnetic field or to provide specified sensitivity to an electromagnetic field impinging on the antenna. Design coupling and transmission line structures to transport RF energy without radiation. Application of circuit elements and transmission line structures in the design of oscillators, amplifiers, mixers, detectors, combiners, filters, impedance transforming networks and other devices. Verification and measurement of performance of radio frequency devices and systems. | Senior Position is defined as having 7 years of experience with an applicable degree |
| RF Eng | Needs an in-depth knowledge of mathematics, physics and general electronics theory as well as specialized training in areas such as wave propagation, impedance transformations, filters and microstrip printed circuit board design. |
File details come from the government source that posted it. Updated .