Attachment 1 Contractor Statement of Objectives

View the file

Other files for this federal contract opportunity

Other files attached to Integrated Aircrew Ensemble, newest first.
File Type Posted
IAE Sol Amendment 5.pdf PDF
IAE Sol Amendment 6.pdf PDF
FA8902-08-R-1003 —
FA8902-08-R-1003-0004 —
FA8902-08-R-1003-0003 —
Clarifications P_Spec 8Sep08.pdf PDF
Clarifications IAE RFP_SOO(14Oct08).pdf PDF
IAE CDRLs —
FA8902-08-R-1003-0002 —
IAE CDRLs —
IAE SOO —
FA8902-08-R-1003-0001 —
Clarifications IAE RFP_SOO(2Oct08).pdf PDF
Clarifications RFP 19Sep08.pdf PDF
IAE Exhibit D CDRL.pdf PDF
IAE Exhibit A CDRL with Preface.pdf PDF
YA-L001 SEC L Atchs1-10_14Jul08_.pdf PDF
IAE Exhibit C CDRL.pdf PDF
IAE CDRL Preface.doc DOC document
FA8902-08-R-1003.pdf PDF
IAE Exhibit B CDRL.pdf PDF
IAE RMP - Approved - 15 Nov 07.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives (SOO) Page 1 22 Aug 08 Integrated Aircrew Ensemble (IAE)

STATEMENT OF OBJECTIVES (SOO)

FOR

INTEGRATED AIRCREW ENSEMBLE (IAE)

22 August 2008

1.0 BACKGROUND

1.1 Purpose – This SOO describes the objectives and requirements for the development, testing, and production of the Integrated Aircrew Ensemble (IAE).

1.2 Program Objectives

1.2.1 The objective of IAE program is to replace as much of the current aircrew flight ensemble (below the neck, minus boots) as possible with a fully integrated system, using as few layers as possible, which provides the following required core capabilities (defined in the IAE Performance Specification):

• Acceleration protection (G-tolerance and endurance)

• Altitude protection

• Bladder relief

• Chemical, Biological, Radiological (CBR) protection

• Cold water immersion protection

• Flotation

• Heat/flame protection

• Survival, Evasion, Resistance, and Escape (SERE) compatibility

• System integration (aircraft and Aircrew Life Support Equipment (ALSE))

• Thermal protection (hot/cold weather)

• Underwater egress

1.2.2 Current flight ensembles are piecemeal, multi-layered garments based on dated technologies and materials that are increasingly difficult to support. Some sub-components interfere with others, limiting aircrew capability and performance. In the past, aircrew protection was the predominant requirement, at the expense of performance and endurance. In addition, existing ensembles are designed for aircraft specific requirements and do not meet the capabilities of multiple platforms. The emergence of new threats, expansion of operating environments, and the requirement to accommodate a broader user population has widened the gap between available systems and needed capability.

1.2.3 The Air Force requires a new aircrew flight ensemble (protective gear and clothing worn during flight) that will maximize combat capability by enhancing aircrew performance and survivability throughout all aircraft envelopes and mission profiles. Aircrew performance and endurance will be of equal importance to aircrew protection, and these requirements will be incorporated in an integrated fashion.

Statement of Objectives (SOO) Page 2 22 Aug 08

1.2.4 The IAE will enhance aircrew ability to operate and survive in their environment, providing mission assurance and continuity of operations throughout the following phases:

1.2.4.1 Operational Environment – Systems necessary to support, protect, improve mobility and performance during flight operations.

1.2.4.2 Escape and Descent – Systems necessary for emergency egress (assisted and unassisted).

1.2.4.3 Survival and Recovery - Systems necessary for survival from time of engine start to landing or until rescue and recovery.

1.2.5 The IAE will facilitate aircrew performance by minimizing the effects of environmental stressors associated with flight operations. An aircrew member will have increased mobility and fewer distractions while performing the mission. The IAE will increase aircrew endurance by minimizing heat stress and fatigue and maximizing G-tolerance to meet current and future operational demands.

2.0 REFERENCE DOCUMENTS

• AETCI 36-2203, Technical And Basic Military Training Development, 8 Mar 01

• AFH 36-2235, Volume 2, Information For Designers Of Instructional Systems - ISD Automated Tools/What Works, 2 Sep 02

• AFH 36-2235, Volume 3, Information For Designers Of Instructional Systems - Application To Acquisition, 1 Nov 02

• AFH 36-2235, Volume 9, Information For Designers Of Instructional Systems - Application To Technical Training, 1 Nov 02

• AFI 63-501, Air Force Acquisition Quality Program, 31 May 94

• AFMAN 36-2236, Guidebook For Air Force Instructors, 12 Nov 03

• DODI 5000.2, Enclosure 7, Human Systems Integration (HSI), 12 May 03

• DoD 5000.4-M-1, Cost and Software Data Reporting (CSDR) Manual, Sep 05

• IAE Performance Specification, 9 Jan 08

• IAE Risk Management Plan, 15 Nov 07

• MIL-STD-882, Standard Practice For System Safety, 10 Feb 00

• MIL-STD-1472F, Human Systems Engineering, 23 Aug 99 (Change Notice 1, 5 Dec 03)

• National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC) ANSI/EIA-748-A Standard for Earned Value Management Systems Intent Guide, Jan 05

Statement of Objectives (SOO) Page 3 22 Aug 08

3.0 CONTRACTOR TASKS – The contractor should accomplish the following tasks during performance of this contract:

3.1 Ejection Seat System Development and Demonstration (SDD)

3.1.1 Translate requirements specified in the IAE Performance Specification into a stable, interoperable, producible, supportable, and cost-effective design that meets all Key Performance Parameter (KPP) and Key System Attribute (KSA) thresholds, and as many of the Other System Attribute (OSA) thresholds as practicable, within cost and schedule constraints. Additionally, the Government desires that offeror(s) address as many KPP, KSA and OSA objectives as possible. Offeror(s) shall explain how their design allows the flexibility to incorporate new technologies, when available, without a major redesign of the ensemble. Focus should be placed on meeting requirements for all ejection seat aircraft (i.e., fighter/attack, bombers, and high-performance trainers).

3.1.2 Program Management

3.1.2.1 Employ a sound management and program administration approach that fully integrates the CWBS, CSOW and IMS and includes an effective cost control and reporting system. Proactively monitor and maintain IMS for reporting at meetings and in response to Government inquiries. (CDRLs A001, A002, A003)

3.1.2.2 Support and participate in the Government’s Integrated Product Team (IPT) process and activities.

3.1.2.3 Proactively manage program risks (e.g. performance/technical, cost, schedule and manufacturing risks) using an integrated management approach of risk planning, risk assessment, risk handling and risk monitoring, as described in the IAE Risk Management Plan (RMP).

Track, monitor and maintain risk status for reporting at meetings and in response to Government inquiries. Report risk management status in the monthly status report. (CDRLs A003, A008)

3.1.2.4 Implement an effective approach to manage and minimize IAE system’s unit cost and Life Cycle Cost (LCC). (CDRL A020)

3.1.2.5 Employ Earned Value Management (EVM) principles in accordance with ANSI/ EIA-748. (CDRLs A027, A028)

3.1.2.6 Implement Contractor Cost Data Reporting (CCDR) in accordance with DoD 5000.4- M-1 to accumulate actual contractor costs to analyze costs efficiently and effectively to support future cost estimate efforts. (CDRLs A021, A022)

3.1.2.7 Create and maintain a restricted-access IAE web site for exchange of program information, to include CDRL item delivery. The contractor shall be responsible for assigning login IDs and passwords for approved personnel. The 648 AESS shall approve all government personnel requests for web site access.

3.1.2.8 Implement effective security measures to protect sensitive IAE program information from unauthorized disclosure.

Statement of Objectives (SOO) Page 4 22 Aug 08

3.1.2.9 Conduct the following meetings:

3.1.2.9.1 Kickoff Meeting – Conduct a Kickoff Meeting no later than 10 working days after contract award to review and ensure understanding of contract and technical requirements. The meeting shall be conducted at Brooks City-Base, TX. The meeting agenda (CDRL A004) shall be submitted 5 working days prior to the meeting in lieu of the 15 days specified in the CDRL.

(CDRLs A004, A005, A006)

3.1.2.9.2 Program Management Reviews (PMRs) – Conduct a PMR every three (3) months to review program status, to include schedule/cost performance and risk management status. These meetings shall be conducted at the contractor’s facility. (CDRLs A004, A005, A006)

3.1.2.9.3 Integrated Baseline Review (IBR) – Conduct an IBR, in conjunction with the second PMR, to provide the Program Managers (PMs) with a mutual understanding of the program Performance Measurement Baseline (PMB) (reference paragraph 3.1.2.5) and to attain agreement on a plan of action to handle the identified risks. The meeting shall be conducted at the contractor’s facility. (CDRLs A004, A005, A006)

3.1.3 Engineering

3.1.3.1 Employ a sound and effective systems engineering approach that develops, qualifies, manufactures, and deploys an IAE system solution(s) that satisfies customer requirements and gives human considerations primary importance, as related to the applicable domains of Human Systems Integration, in the design and development of the IAE. (CDRLs A007, A008, A012)

3.1.3.2 Establish a technical performance metric for each of the Key Performance Parameters (KPPs) identified in the RFP at a minimum. Additional technical performance metrics may be identified and included as the IAE system design progresses. Proactively track, monitor and maintain metric status for reporting at meetings and in response to Government inquiries.

(CDRLs A007, A026)

3.1.3.3 Employ sound systems safety engineering design practices to identify, control, mitigate, and manage safety risks for the IAE system during development, production, and fielding to ensure the IAE system is operationally safe, suitable and effective for use in the user’s operational environment. (Use MIL-STD-882 for guidance) (CDRL A017, A025)

3.1.3.4 Apply Cost As an Independent Variable (CAIV) principles to meet technical requirements at a price that is acceptable to the Government.

3.1.3.5 Establish an Interface Control Working Group (ICWG) to proactively manage IAE system compatibility with life support equipment identified in the Performance Specification. If requested, the Government will provide current ALSE for integration purposes. Employ adequate resources (e.g. cost, schedule & personnel) for multiple CONUS trips to collect compatibility/integration data for design and system qualification.

3.1.3.6 Establish an Aircraft Integration Working Group (AIWG) to proactively manage IAE system qualification and integration on Government aircraft identified in the Performance Specification. Employ adequate resources (e.g. cost, schedule & personnel) for multiple

Statement of Objectives (SOO) Page 5 22 Aug 08

CONUS trips to collect compatibility/integration data for design and system qualification.

3.1.3.7 Employ a sound and effective system configuration control process that provides the Government sufficient insight and traceability of IAE system configurations throughout development and production. (CDRLs A009, A010, A018)

3.1.3.8 Conduct the following meetings:

3.1.3.8.1 System Functional Review (SFR) – Conduct a SFR to assess the system functional requirements as captured in system specifications (functional baseline), ensure that all system requirements and functional performance requirements documented in the IAE Performance Specification are defined in the functional baseline and consistent with cost (program budget), schedule (program schedule), risk, and other system constraints, and ensure that the IAE system can proceed into preliminary design. The meeting shall be conducted at the contractor’s facility.

(CDRLs A004, A005, A006)

3.1.3.8.2 Preliminary Design Review (PDR) – Conduct a PDR to assess the system preliminary design as captured in Performance Specifications for each configuration item in the system (allocated baseline), ensure that each function in the functional baseline has been allocated to one or more system configuration items, ensure that the IAE system can meet the stated performance requirements within cost (program budget), schedule (program schedule), risk, and other system constraints, and ensure that the IAE system can proceed into detailed design. The meeting shall be conducted at the contractor’s facility. (CDRLs A004, A005, A006)

3.1.3.8.3 Critical Design Review (CDR) – Conduct a CDR to assess the system final design as captured in product specifications for each configuration item in the system (product baseline), ensure that each product in the product baseline has been captured in the detailed design documentation, ensure that the IAE system can meet the stated performance requirements within cost (program budget), schedule (program schedule), risk, and other system constraints, and ensure that the IAE system can proceed into system fabrication and Developmental Test & Evaluation (DT&E). The meeting shall be conducted at the contractor’s facility. (CDRLs A004, A005, A006)

3.1.3.8.4 Test Readiness Review (TRR) – Conduct a TRR to assess test objectives, test methods and procedures, scope of tests, and safety, confirm that required test resources have been properly identified and coordinated to support planned tests, and ensure that the IAE system is ready to proceed into formal Developmental Verification Testing (DVT). The meeting shall be conducted at the contractor’s facility. (CDRLs A004, A005, A006)

3.1.3.8.5 System Verification Review (SVR)/Production Readiness Review (PRR) – Conduct a SVR/PRR to assess the IAE system final product, as evidenced in its production configuration, to determine if it meets the requirements documented in the Functional, Allocated, and Product Baselines, and review the readiness of manufacturing processes, the quality management system, and the production planning (i.e., facilities, tooling and test equipment capacity, personnel development and certification, process documentation, inventory management, supplier management, etc.) to verify that the IAE system can proceed into Low Rate Initial Production (LRIP) within cost (program budget), schedule (program schedule), risk, and other system

Statement of Objectives (SOO) Page 6 22 Aug 08 constraints. The meeting shall be conducted at the contractor’s facility. (CDRLs A004, A005, A006)

3.1.3.8.6 Engineering Data Package In-Process Reviews (IPRs) – Support and co-chair In- Process Reviews (IPRs) of the engineering drawings, associated lists, and other documentation to be included in the engineering data package. These IPRs shall be held at the contractor’s facility or at a site designated by the Government contracting officer. The contractor will have a copy (check print) of all data available at the IPR. (CDRLs A004, A005, A006)

3.1.3.8.6.1 The IPR will be conducted only after the contractor's quality assurance personnel have completely reviewed the data and determined that the data are of sufficient quality that government time will be effectively utilized during the review. These reviews shall be scheduled quarterly, in conjunction with PMRs when possible, when data has reached 30%, 60% and 90% completion.

3.1.3.8.6.2 The contractor shall notify the government 20 working days prior to a planned IPR and shall provide the government with a complete list of data to be reviewed no later than 10 working days prior to the start of each IPR. The IPR shall focus on the contractor's progress in the preparation of the engineering data package. The contractor shall support and provide all necessary resources (i.e., meeting agenda, conference room, applicable data, minutes, and appropriate personnel available to answer any questions) to perform the IPR effectively. In addition, all applicable subcontractor/vendor data shall be made available for review. All discrepancies identified in the IPR shall be corrected within 20 working days of the IPR.

3.1.4 Human Systems Integration (HSI) –

3.1.4.1 Develop and design the IAE with the human considered as of paramount importance for operation and maintenance. Employ a sound human systems integration approach that addresses all applicable HSI domains (e.g., manpower, personnel, training, human factors engineering, environment, safety, occupational health, personnel survivability and habitability) to minimize total operational cost and ensure the system is built to accommodate the characteristics of the operational users that will operate, maintain, and support the system.

(CDRL A007)

3.1.4.2 Establish a Human Systems Integration Working Group (HSIWG) to review design requirements, specifications and development and design aspects to ensure human compatibility with the applicable HSI domains. All human related discrepancies or short falls will be tracked with the description of the HSI issue, concern, office of primary responsibility, recommended resolution, and get well date.

3.1.4.3 Environment, Safety, and Occupational Health (ESOH) – Identified environmental, safety, and health risks shall be eliminated, minimized or controlled to acceptable levels within cost, schedule, and performance constraints. Operations, maintenance, support and disposal activities for the IAE shall require no hazardous material (HAZMATs). Any substances and procedures used for operation and maintenance shall be identified, and shall not pose any health risk. All health and safety risks associated with operation, maintenance and support shall be identified during development and design, and shall be eliminated or mitigated to acceptable

Statement of Objectives (SOO) Page 7 22 Aug 08 level as agreed by the government. (CDRLs A016, A017, A025)

3.1.4.4 Training – Develop and document a training program to ensure that the fielded IAE system is properly used and maintained. This training program should be developed with Air Education and Training Command (AETC) involvement. The training program shall satisfy requirements for qualifying and sustaining operators, maintainers, trainers, and support personnel skills, knowledge, and task accomplishment capabilities. The total systems training concept and structure must ensure delivery of timely and effective instructional methods, facilities, personnel, and tools for the life-cycle training at all levels and locations. (CDRL A019)

3.1.4.4.1 Develop service instructors training in order to establish field training expertise.

Maximum use of the “Train the Trainer” concept will be used. AF Handbook 36-2235, Volumes 2 and 3, and AF Manual 36-2236 may be used as references during training program development.

3.1.4.5 All training systems and materials must meet mission requirements and be delivered no later than 90 days before the first full rate production IAE delivery.

3.1.4.6 Survivability – The entire system must provide for the maximum protection of the operators and maintainers during use in combat and peace-time environments. Protective and preventive measures must address ingress, egress, detectability, fratricide prevention, battle damage impact on the human, and prevention of exposure of personnel to CBR environments.

Additionally, system survivability should be considered to ensure maximum support/availability for mission environments. (CDRL A007)

3.1.4.7 Manpower and Personnel - The system must be operated, maintained, and sustained within projected manpower authorizations as identified in the current force structure and by Air Force and contractor personnel with the appropriate aptitudes, knowledge, skill levels, AFSC structures, anthropometrics, and force management factors. (CDRL A007)

3.1.4.8 Human Factors Engineering - The IAE system/components shall be developed and designed with the human considered a primary system component. Operators, maintainers, sustainers, trainers, and other support personnel shall be considered in hardware selection and system construction to maximize performance in all settings. The IAE shall allow for maximum flexibility, comfort, and protection for all aircrew members during all missions. The system shall comply with applicable portions of MIL-STD-1472F, Human Systems Engineering.

(CDRL A007)

3.1.5 Test and Evaluation

3.1.5.1 Support and participate in the Government’s Test Planning Working Group (TPWG) process and activities.

3.1.5.2 Conduct Developmental Test & Evaluation (DT&E) activities to verify that the IAE components meet the requirements in the Performance Specification. Employ a sound and effective failure reporting and corrective action system that will identify, report, track, and provide corrective action status for all testing deficiencies. Test data from previously conducted tests may be submitted to demonstrate component performance, with Government approval. The

Statement of Objectives (SOO) Page 8 22 Aug 08

Government reserves the right to witness any or all conducted DT&E. (CDRLs A011, A013, A014, A015)

3.1.5.3 After successful completion of DT&E activities, conduct Developmental Verification Testing (DVT) IAW Section 4 of the IAE Performance Specification to demonstrate that the IAE system meets the requirements in the Performance Specification. Employ a sound and effective failure reporting and corrective action system that will identify, report, track, and provide corrective action status for all testing deficiencies. The Government reserves the right to witness the physical inspection and any or all DVT. (CDRLs A011, A013, A014, A015)

3.1.5.4 Following successful completion of DVT, manufacture and deliver ejection seat IAE garments for Government Operational Assessment (OA) in fighter type aircraft. (CDRL A023)

3.1.5.5 Provide support for Government OA, which will consist of technical/engineering, training, and logistical support, via on-site field team.

3.1.6 Logistics Planning

3.1.6.1 Develop an integrated logistics support strategy that effectively fields and sustains the IAE system and is centrally managed by the Government. The Government prefers to maintain the IAE in the Aircrew Flight Equipment Shop, until the aircrew member dons the ensemble prior to flight operations. However, the Government is open to new approaches if it provides a significant increase in performance of the required IAE capabilities, without a significant increase in total ownership costs.

3.1.6.2 Support and participate in the Government’s Logistics Working Group (LWG) process and activities.

3.1.6.3 Conduct the following meetings:

3.1.6.3.1 Technical Order (TO) Guidance Conference – Conduct a TO Guidance Conference to review the contract to ensure mutual understanding of the requirements, review applicable specifications and established Air Force TO policy, review basic planning data to ensure mutual understanding of the program and intended users requirements, and establish contacts to provide subsequent guidance and information. The meeting shall be conducted at the contractor’s facility.

(CDRLs A004, A005, A006)

3.1.6.3.2 TO In-Process Reviews (IPRs) – Conduct TO IPRs to ensure draft TOs are compatible with engineering source materials, verify accuracy of descriptive data, verify that TO content, style and format are in accordance with applicable specifications and other contractual requirements, and identify issues concerning depth of coverage, missing data, data that needs amplification, etc. These reviews shall be scheduled, in conjunction with PMRs when possible, when TO development has reached 30%, 60% and 90% completion. The contractor shall have all applicable data available at the IPR. The meetings shall be conducted at the contractor’s facility. (CDRLs A004, A005, A006)

3.1.7 Manufacturing Planning

Statement of Objectives (SOO) Page 9 22 Aug 08

3.1.7.1 Develop sound and effective processes and practices for manufacturing/production that will meet the Low Rate Initial Production (LRIP) and Full Rate Production (FRP) requirements, and ensure producibility of the final IAE system with acceptable risk. (CDRL A024)

3.1.7.2 Employ sound and effective quality assurance practices for system design, development, manufacturing/production and deployment to ensure the IAE system is operationally safe, suitable and effective. Monitor and maintain quality assurance practices for reporting at meetings and in response to Government inquiries. (Use AFI 63-501 for guidance)

3.1.8 Data – Deliver the following program data in accordance with contract requirements (CDRL Exhibit A):

3.1.8.1 Contract Work Breakdown Schedule (CWBS) (CDRL A001)

3.1.8.2 Integrated Master Schedule (IMS) (CDRL A002)

3.1.8.3 Monthly Status Reports (CDRL A003)

3.1.8.4 Conference Agenda (CDRL A004)

3.1.8.5 Conference Presentation Materials (CDRL A005)

3.1.8.6 Conference Minutes (CDRL A006)

3.1.8.7 System Engineering Management Plan (SEMP) (CDRL A007)

3.1.8.8 Risk Management Plan (CDRL A008)

3.1.8.9 Contractor’s Configuration Management Plan (CDRL A009)

3.1.8.10 Configuration Status Accounting Information (CDRL A010)

3.1.8.11 Test Plans (CDRL A011)

3.1.8.12 Failure Mode Effects and Criticality Analysis Report (CDRL A012)

3.1.8.13 Failure Analysis and Corrective Action Report (CDRL A013)

3.1.8.14 Test Quick Look Reports (CDRL A014)

3.1.8.15 Test Final Reports (CDRL A015)

3.1.8.16 Health Hazard Assessment Report (CDRL A016)

3.1.8.17 Safety Assessment Report (SAR) (CDRL A017)

3.1.8.18 Data Accession List (CDRL A018)

3.1.8.19 Training Plan (CDRL A019)

3.1.8.20 Design-to-Cost/Life Cycle Cost and Variance Analysis Report (CDRL A020)

3.1.8.21 Cost Data Summary Report (DD Form 1921) (CDRL A021)

3.1.8.22 Functional Cost-Hour and Progress Curve Report (DD Form 1921-1) (CDRL A022)

3.1.8.23 Barcode Identification Report (CDRL A023)

3.1.8.24 Production Plan & Schedule (CDRL A024)

Statement of Objectives (SOO) Page 10 22 Aug 08

3.1.8.25 Critical Safety Item, Characteristic and Critical Defect Report (CDRL A025)

3.1.8.26 Technical Performance Report (TPR) (CDRL A026)

3.1.8.27 Cost Performance Report (CPR) (CDRL A027)

3.1.8.28 Contract Funds Status Report (CFSR) (CDRL A028)

3.2 Ejection Seat Low Rate Initial Production (LRIP) (option CLIN)

3.2.1 Manufacture and deliver production representative ejection seat IAE garments for Government Initial Operational Test and Evaluation (IOT&E), garments for AETC training program development, and garments for Physical Configuration Audit (PCA). LRIP garment production shall use production tooling. (CDRL B020)

3.2.2 Employ sound and effective processes and practices for manufacturing/production, to include but not limited to quality control, which will meet the Low Rate Initial Production (LRIP) and Full Rate Production (FRP) requirements, and ensure producibility of the final IAE system with acceptable risk.

3.2.3 Employ a sound and effective system configuration control process that provides the Government sufficient insight and traceability of IAE system configurations throughout development and production. (CDRLs B006, B007, B008, B010, B011, B012, B013, B014)

3.2.4 Employ a sound management and program administration approach that includes an effective cost control and reporting system. Proactively monitor and maintain IMS for reporting at meetings and in response to Government inquiries. (CDRLs B001, B002)

3.2.5 Maintain a restricted-access IAE web site for exchange of program information, to include CDRL item delivery. The contractor shall be responsible for assigning login IDs and passwords for approved personnel. The 648 AESS shall approve all government personnel requests for web site access.

3.2.6 Support and participate in the Government’s Test Planning Working Group (TPWG) process and activities.

3.2.7 Implement the developed training program, with AETC involvement, to ensure that the fielded IAE system is properly used and maintained. Develop training curriculum and lesson plans for AETC training incorporation. AF Handbook 36-2235, Volume 9 and AETC Instruction 36-2203 may be used as references during curriculum and lesson plan development.

(CDRLs B016)

3.2.8 Provide support for IOT&E, to consist of technical/engineering, training, and logistical support, via off-site help desk.

3.2.9 Implement an integrated logistics support strategy sufficient to effectively field and sustain the IAE system. Complete TO development (from 90% IPR), conduct TO validation, and support Government TO verification activities. (CDRLs B015, B017)

3.2.10 Implement effective security measures to protect sensitive IAE program information from

Statement of Objectives (SOO) Page 11 22 Aug 08 unauthorized disclosure.

3.2.11 Implement Contractor Cost Data Reporting (CCDR) in accordance with DoD 5000.4- M-1 to accumulate actual contractor costs to analyze costs efficiently and effectively to support future cost estimate efforts. (CDRLs B018, B019)

3.2.12 Conduct the following meetings:

3.2.12.1 Physical Configuration Audit (PCA) – Conduct a PCA to examine the actual configuration of the IAE system, verify that the related design documentation matches the item as specified in the contract, and confirm that the manufacturing processes, quality control system, measurement and test equipment, and training are adequately planned, tracked, and controlled. The contractor shall have a copy (check print) of all data (to include configuration item product specifications and product drawings) available at the PCA. The audit shall be conducted at the contractor’s facility. (CDRLs B003, B004, B005, B006, B007, B008, B009)

3.2.12.2 Training Curriculum Development In-Process Reviews (IPRs) – Conduct IPRs to ensure the training curriculum is compatible with engineering source materials, verify accuracy of descriptive data, verify that curriculum content, style and format are in accordance with applicable specifications and other contractual requirements, and identify issues concerning depth of coverage, missing data, data that needs amplification, etc. These IPRs shall be held at the contractor’s facility or at a site designated by the Government contracting officer. The contractor shall have all applicable data available at the IPR. These reviews shall be scheduled, in conjunction with PMRs when possible, when curriculum development has reached 30%, 60% and 90% completion. The contractor shall notify the Government 20 working days prior to a planned IPR and shall provide the Government with all data to be reviewed no later than 10 working days prior to the start of each IPR. (CDRLs B003, B004, B005, B017)

3.2.12.3 TO Pre Publication Review – Conduct a TO Pre-Publication Review to examine the TO reproducible copy prior to preparation of reproduction media to ensure incorporation of changes resulting from verification, and conduct a final check on contract compliance. The meeting shall be conducted at the contractor’s facility. (CDRLs B003, B004, B005)

3.2.12.4 Production Readiness Review (PRR) – Conduct a PRR to evaluate the full, production-configured system to determine if it correctly and completely implements all system requirements and review the readiness of manufacturing processes, the quality management system, and the production planning (i.e., facilities, tooling and test equipment capacity, personnel development and certification, process documentation, inventory management, supplier management, etc.) to verify that production capability forms a satisfactory basis for proceeding into Full Rate Production. The meeting shall be conducted at the contractor’s facility. (CDRLs B003, B004, B005)

3.2.12.5 Program Management Reviews (PMRs) – Conduct a PMR every three (3) months to review program status, to include schedule and cost performance. These meetings shall be conducted at the contractor’s facility. (CDRLs B003, B004, B005)

3.2.13 Data – Deliver the following program data according to contract requirements (CDRL Exhibit B):

Statement of Objectives (SOO) Page 12 22 Aug 08

3.2.13.1 Integrated Master Schedule (IMS) (CDRL B001)

3.2.13.2 Monthly Status Reports (CDRL B002)

3.2.13.3 Conference Agenda (CDRL B003)

3.2.13.4 Conference Presentation Materials (CDRL B004)

3.2.13.5 Conference Minutes (CDRL B005)

3.2.13.6 Draft Configuration Item (CI) Product Specifications (CDRL B006)

3.2.13.7 Draft Product Drawings and Associated Lists (CDRL B007)

3.2.13.8 Configuration Status Accounting Information (CDRL B008)

3.2.13.9 Failure Analysis and Corrective Action Report (CDRL B009)

3.2.13.10 Data Accession List (CDRL B010)

3.2.13.11 Engineering Change Proposal (CDRL B011)

3.2.13.12 Specification Change Notice (CDRL B012)

3.2.13.13 Notice of Revision (CDRL B013)

3.2.13.14 Request for Deviation (CDRL B014)

3.2.13.15 Technical Orders (TOs) (CDRL B015)

3.2.13.16 Training Conduct Support Document (CDRL B016)

3.2.13.17 Logistics Management Information (LMI) (CDRL B017)

3.2.13.18 Cost Data Summary Report (DD Form 1921) (CDRL B018)

3.2.13.19 Functional Cost-Hour and Progress Curve Report (DD Form 1921-1) (CDRL B019)

3.2.13.20 Barcode Identification Report (CDRL B020)

3.3 Rotary/Fixed Wing SDD/LRIP (option CLIN)

3.3.1 Modify the IAE design developed under Paragraph 3.1 to incorporate rotary wing (helicopter), special operations, and other fixed-wing aircraft requirements specified in the IAE Performance Specification that were not addressed in the previous ejection seat SDD effort.

Ensure the modified design meets all KPP and KSA thresholds, and as many of the OSA thresholds as practicable, within cost and schedule constraints. Additionally, the Government desires that offeror(s) address as many KPP, KSA and OSA objectives as possible.

3.3.1.1 Perform program management in accordance with Paragraph 3.1.2. (CDRLs C001, C002)

3.3.1.2 Perform engineering management in accordance with Paragraph 3.1.3. (CDRLs C006, C008, C014, C015, C016, C017, C018, C019, C025)

3.3.1.3 Ensure HSI aspects identified in Paragraph 3.1.4 are incorporated in the modified design. (CDRLs C012, C013)

Statement of Objectives (SOO) Page 13 22 Aug 08

3.3.1.4 Conduct testing in accordance with Paragraphs 3.1.5.1, 3.1.5.2, and 3.1.5.3. (CDRLs C007, C009, C010, C011)

3.3.1.5 Ensure the modified design supports the logistical support strategy developed under Paragraph 3.1.6.1. Update TOs as necessary and, if required, conduct revised TO validation and support government TO verification activities. Revise Logistics Management Information (LMI) (CDRL B017) to incorporate the modified design. (CDRLs C020, C026)

3.3.1.6 Ensure the modified design can be manufactured in accordance with the Government-approved production plan (CDRL A024).

3.3.2 Modify and implement the training program developed under Paragraph 3.2.7, with AETC involvement, to ensure that the fielded rotary/fixed wing IAE system is properly used and maintained. Develop rotary and fixed wing specific training curriculum and lesson plans for AETC training incorporation. AF Handbook 36-2235, Volume 9 and AETC Instruction 36-2203 may be used as references during curriculum and lesson plan development. (CDRL C021)

3.3.3 Manufacture and deliver, in accordance with Paragraphs 3.2.2 through 3.2.6, production representative rotary wing and production representative fixed wing IAE garments for Government IOT&E, rotary and fixed wing garments to support AETC training program development, and rotary and fixed wing garments for PCA. LRIP garment production shall use production tooling. (CDRL C024)

3.3.4 Provide support for rotary/fixed wing IOT&E, to consist of technical/engineering, training, and logistical support, via off-site help desk.

3.3.5 Implement effective security measures to protect sensitive IAE program information from unauthorized disclosure.

3.3.6 Implement Contractor Cost Data Reporting (CCDR) in accordance with DoD 5000.4- M-1 to accumulate actual contractor costs to analyze costs efficiently and effectively to support future cost estimate efforts. (CDRLs C022, C023)

3.3.7 Conduct the following meetings:

3.3.7.1 Engineering Reviews – As necessary, conduct rotary/fixed wing engineering reviews as described in Paragraph 3.1.3.8. (CDRLs C003, C004, C005)

3.3.7.2 Physical Configuration Audit (PCA) – Conduct a rotary/fixed wing PCA in accordance with Paragraph 3.2.12.1. (CDRLs C003, C004, C005)

3.3.7.3 Production Readiness Review (PRR) – Conduct a rotary/fixed wing PRR in accordance with Paragraph 3.2.12.4. (CDRLs C003, C004, C005)

3.3.7.4 Program Management Reviews (PMRs) – Ensure that ejection seat LRIP PMRs (reference Paragraph 3.2.12.5) include rotary/fixed wing status, to include schedule and cost performance. Upon completion of the ejection seat LRIP option, continue rotary/fixed wing PMRs every three (3) months. (CDRLs C003, C004, C005)

Statement of Objectives (SOO) Page 14 22 Aug 08

3.3.8 Data – Deliver the following program data according to contract requirements (CDRL Exhibit C):

3.3.8.1 Integrated Master Schedule (IMS) – Add rotary/fixed wing milestones into LRIP IMS (CDRL B001). Upon completion of the LRIP option, deliver rotary/fixed wing schedule updates monthly. (CDRL C001)

3.3.8.2 Monthly Status Reports – Add rotary/fixed wing status into LRIP monthly status reports (CDRL B002). Upon completion of the LRIP option, deliver rotary/fixed wing monthly status reports. (CDRL C002)

3.3.8.3 Conference Agenda (CDRL C003)

3.3.8.4 Conference Presentation Materials (CDRL C004)

3.3.8.5 Conference Minutes (CDRL C005)

3.3.8.6 Configuration Status Accounting Information (CDRL C006)

3.3.8.7 Test Plans – Revise CDRL A011 to incorporate rotary/fixed wing design changes.

(CDRL C007)

3.3.8.8 Failure Mode Effects and Criticality Analysis Report – Revise CDRL A012 to incorporate rotary/fixed wing design changes. (CDRL C008)

3.3.8.9 Failure Analysis and Corrective Action Report (CDRL C009)

3.3.8.10 Test Quick Look Reports (CDRL C010)

3.3.8.11 Test Final Reports (CDRL C011)

3.3.8.12 Health Hazard Assessment Report – Revise CDRL A017 to incorporate rotary/fixed wing design changes. (CDRL C012)

3.3.8.13 Safety Assessment Report (SAR) – Revise CDRL A018 to incorporate rotary/fixed wing design changes. (CDRL C013)

3.3.8.14 Critical Safety Item, Characteristic and Critical Defect Report – Revise CDRL A026 to incorporate rotary/fixed wing design changes. (CDRL C014)

3.3.8.15 Data Accession List (CDRL C015)

3.3.8.16 Engineering Change Proposal (CDRL C016)

3.3.8.17 Specification Change Notice (CDRL C017)

3.3.8.18 Notice of Revision (CDRL C018)

3.3.8.19 Request for Deviation (CDRL C019)

3.3.8.20 Technical Orders (TOs) – Revise CDRL B015 to incorporate rotary/fixed wing design changes. (CDRL C020)

3.3.8.21 Training Conduct Support Document – Revise CDRL B016 to incorporate rotary/fixed wing design changes. (CDRL C021)

3.3.8.22 Cost Data Summary Report (DD Form 1921) (CDRL C022)

3.3.8.23 Functional Cost-Hour and Progress Curve Report (DD Form 1921-1) (CDRL C023)

Statement of Objectives (SOO) Page 15 22 Aug 08

3.3.8.24 Barcode Identification Report (CDRL C024)

3.3.8.25 Technical Performance Report (TPR) (CDRL C025)

3.3.8.26 Logistics Management Information (LMI) – Revise CDRL B017 to incorporate rotary/fixed wing design changes. (CDRL C026)

3.4 Full Rate Production (option CLINs)

3.4.1 Manufacture and deliver production IAE units to meet user delivery requirements, in the following configurations (CDRL D014), IAW Section B of the contract:

CONFIGURATION YEAR 1 FRP YEAR 2 FRP

Ejection Seat X X Rotary Wing X* Fixed Wing X*

* If rotary/fixed wing SDD option is exercised

3.4.2 Conduct conformance inspections and testing, in accordance with the Government-approved production plan (CDRL A025), to verify the IAE system and components meet the IAE Performance Specification requirements. Employ a sound and effective failure reporting and corrective action system that will identify, report, track, and provide corrective action status for all testing deficiencies. Report production lot test results in monthly status report. (CDRLs D001, D015)

3.4.3 Deliver a complete engineering data package to enable competition of future production contracts. If the rotary/fixed wing SDD/LRIP option is exercised, ensure that the rotary and fixed wing ensembles are included. (CDRLs D005, D006)

3.4.4 Employ a sound management and program administration approach includes an effective cost control and reporting system. Report production status in monthly status report. (CDRL D001)

3.4.5 Maintain a restricted-access IAE web site for exchange of program information, to include CDRL item delivery. The contractor shall be responsible for assigning login IDs and passwords for approved personnel. The 648 AESS shall approve all government personnel requests for web site access.

3.4.6 Implement Contractor Cost Data Reporting (CCDR) in accordance with DoD 5000.4- M-1 to accumulate actual contractor costs to analyze costs efficiently and effectively to support future cost estimate efforts. (CDRLs D012, D013)

3.4.7 Employ a sound and effective system configuration control process that provides the Government sufficient insight and traceability of IAE system configurations throughout production. (CDRLs D007, D008, D009, D010, D011)

3.4.8 Implement effective security measures to protect sensitive IAE program information from unauthorized disclosure.

Statement of Objectives (SOO) Page 16 22 Aug 08

3.4.9 Conduct a PMR every three (3) months during the first year of FRP to review program status, to include schedule and cost performance. PMRs shall be conducted every six (6) months thereafter. These meetings shall be conducted at the contractor’s facility. (CDRLs D002, D003, D004)

3.4.10 Data – Deliver the following program data according to contract requirements (CDRL Exhibit D):

3.4.10.1 Monthly Status Reports (CDRL D001)

3.4.10.2 Conference Agenda (CDRL D002)

3.4.10.3 Conference Presentation Materials (CDRL D003)

3.4.10.4 Conference Minutes (CDRL D004)

3.4.10.5 Configuration Item (CI) Product Specifications (CDRL D005)

3.4.10.6 Product Drawings and Associated Lists (CDRL D006)

3.4.10.7 Data Accession List (CDRL D007)

3.4.10.8 Engineering Change Proposal (CDRL D008)

3.4.10.9 Specification Change Notice (CDRL D009)

3.4.10.10 Notice of Revision (CDRL D010)

3.4.10.11 Request for Deviation (CDRL D011)

3.4.10.12 Cost Data Summary Report (DD Form 1921) (CDRL D012)

3.4.10.13 Functional Cost-Hour and Progress Curve Report (DD Form 1921-1) (CDRL D013)

3.4.10.14 Barcode Identification Report (CDRL D014)

3.4.10.15 Failure Analysis and Corrective Action Report (CDRL D015)

4.0 PERIOD OF PERFORMANCE

4.1.1 Period of performance for the ejection seat SDD Phase is approximately 31 months after contract award.

4.1.2 Period of performance for the ejection seat LRIP option is approximately 15 months after exercise of contract option.

4.1.3 Period of performance for the rotary/fixed wing SDD/LRIP option is approximately 23 months after exercise of contract option.

4.1.4 Period of performance for the first FRP option (FY12) is approximately 9 months after exercise of option.

4.1.5 Period of performance for the second FRP option (FY13) is approximately 12 months after exercise of option.