IAE CDRLs

590 KB Posted

Attached to
Integrated Aircrew Ensemble Federal contract opportunity
Solicitation number
FA8902-08-R-1003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Exhibit B Contract Data Requirements List dated 25 Sep 2008

Text of this file

EXHIBIT B CDRLS

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and

Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block

E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

FA8902-08-R-1003

F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE O F DATA ITEM 3. SUBTITLE

B001 INTEGRATED MASTER SCHEDULE (IMS)

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81650 SOO PARA: 3.2.13.1 648 AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY SEE BLK 16

b. COPIES

8.APP CODE

A

C 11. AS OF DATE

SEE BLK 16

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: GENERAL REMARK: DI-MGMT-81650 PARA 2.4, THE IMS SHALL SHOW

SUFFICIENT DETAIL TO CORRESPOND WITH LEVEL 3 OF THE CONTRACT WORK

BREAKDOWN STRUCTURE (CWBS). COMBINE WITH ROTARY WING SDD IMS

(CDRL C001) IF OPTION IS EXERCISED.

BLK 11: THE REPORT PERIOD SHALL BE FROM THE 26TH OF THE BEGINNING

MONTH UNTIL THE 25TH OF THE ENDING MONTH.

BLKS 12 AND 13: SUBMITTAL DUE NO LATER THAN THE FOURTH WORKING DAY

OF EACH MONTH. GOVERNMENT HAS 5 WORKING DAYS TO REVIEW IMS AND

PROVIDE WRITTEN COMMENTS. CONTRACTOR HAS 5 WORKING DAYS AFTER

RECEIPT OF GOVERNMENT COMMENTS TO INCORPORATE COMMENTS AND SUBMIT

REVISED IMS.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(PCO) ALICE.SANDERS@BROOKS.AF.MIL

(PCS) ALFORT.BELIN@BROOKS.AF.MIL

TOTAL 0 0 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 1161/183

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B002 CONTRACTOR STATUS & MANAGEMENT REPORT

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80368A SOO PARA: 3.2.13.2 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED MTHLY SEE BLK 16

N

C 11. AS OF DATE

EOM

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: COMBINE WITH ROTARY WING SDD STATUS REPORT (CDRL C002) IF

OPTION IS EXERCISED.

BLK 11: EOM MEANS END OF MONTH.

BLKS 12 AND 13: SUBMITTALS WILL BE NO LATER THAN THE 10TH OF THE

MONTH FOLLOWING THE AS OF DATE.

BLK 14A: THE GOVERNMENT PROGRAM MANAGER WILL PROVIDE ADDITIONAL

DISTRIBUTION REQUIRED, TO INCLUDE ADDRESSEE'S EMAIL AND MAILING

ADDRESS AND NUMBERS OF COPIES. COMPLETE GOVERNMENT ADDRESSES IN

SECTION F OF THE CONTRACT.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B003 CONFERENCE AGENDA

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81249A/T SOO PARA: 3.2.13.3 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: DELETE PARA. 10.2.D, E, G, H, I

BLKS 12 AND 13: DRAFT AGENDA IS DUE 15 WORKING DAYS PRIOR TO

MEETING. AGENDA ITEMS MAY BE PROVIDED BY THE GOVERNMENT. THE

GOVERNMENT HAS 5 WORKING DAYS TO REVIEW DRAFT AND PROVIDE WRITTEN

COMMENTS. THE CONTRACTOR HAS 5 WORKING DAYS TO INCORPORATE

GOVERNMENT COMMENTS AND SUBMIT THE FINAL AGENDA.

BLK 14A: THE GOVERNMENT PROGRAM MANAGER WILL PROVIDE ADDITIONAL

DISTRIBUTION REQUIRED, TO INCLUDE ADDRESSEE'S EMAIL AND MAILING

ADDRESS AND NUMBERS OF COPIES. COMPLETE GOVERNMENT ADDRESSES IN

SECTION F OF THE CONTRACT.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B004 PRESENTATION MATERIAL

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81373/T SOO PARA: 3.2.13.4 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

N

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

N/A

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: DI-ADMN-81373 IS TAILORED AS FOLLOWS:

1. PARAGRAPH 10.2 DOES NOT APPLY.

2. CONTRACTOR FORMAT IS ACCEPTABLE.

BLK 12: THE PRESENTATION MATERIAL IS DUE 5 WORKING DAYS PRIOR TO

MEETING.

BLK 14A: PRESENTATION SHALL BE IN MICROSOFT POWERPOINT OR EXCEL

FORMAT, AS APPLICABLE.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B005 CONFERENCE MINUTES

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81505 SOO PARA: 3.2.13.5 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLKS 12 AND 13: THE DRAFT MINUTES ARE DUE 5 WORKING DAYS AFTER THE

MEETING. THE GOVERNMENT HAS UP TO 5 WORKING DAYS TO REVIEW THE

DRAFT MINUTES AND PROVIDE WRITTEN COMMENTS TO THE CONTRACTOR. THE

CONTRACTOR HAS 5 WORKING DAYS AFTER RECEIPT OF COMMENTS TO

INCORPORATE THE COMMENTS AND SUBMIT THE FINAL MINUTES.

BLK 14A: THE GOVERNMENT PROGRAM MANAGER WILL PROVIDE ADDITIONAL

DISTRIBUTION REQUIRED, TO INCLUDE ADDRESSEE'S EMAIL AND MAILING

ADDRESS AND NUMBERS OF COPIES.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B006 SYSTEM SPECIFICATION DRAFT CONFIGURATION ITEM PRODUCT

SPECIFICATION

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-IPSC-81431A SOO PARA: 3.2.13.6 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ONE/R SEE BLK 16

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 9: SINCE THIS DATA ITEM WILL BECOME PART OF THE IAE

ENGINEERING DATA PACKAGE TO SUPPORT FUTURE COMPETITIVE

REPROCUREMENTS, ENSURE IT DOES NOT CONTAIN PROPRIETARY MATERIALS

OR PROCESSES.

BLKS 12 AND 13: DRAFT CONFIGURATION ITEM (CI) PRODUCT

SPECIFICATION(S) SHALL BE SUBMITTED NOT LATER THAN 20 WORKING DAYS

PRIOR TO PHYSICAL CONFIGURATION AUDIT (PCA).

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP X TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B007 PRODUCT DRAWINGS & ASSOCIATED LISTS DRAFT PRODUCT DRAWINGS

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81000C/T SOO PARA: 3.2.13.7 584 CBSS/GBHAA

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

SD REQUIRED ONE/R SEE BLK 16

A

C 11. AS OF DATE

SEE BLK 16

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: DI-SESS-81000C/T IS TAILORED AS FOLLOWS:

PARA a., b., c., d., e. DELETE IN ITS ENTIRETY.

PARA 1., DELETE IN ITS ENTIRETY AND REPLACE WITH ‘1. REFERENCE

DOCUMENTS. THE APPLICABLE DOCUMENTS APPLY AS CITED IN THE DD FORM

1423 AND CONTINUATION SHEETS.’

PARA 2. DELETE 'PRODUCT DRAWINGS AND ASSOCIATED LISTS SHALL MEET

THE REQUIREMENTS OF MIL-DTL-31000C'.

PARA 3. DELETE IN ITS ENTIRETY AND REPLACE WITH '3. DRAWING FORMS.

CONTRACTOR MAY USE ITS OWN FORMS FOR PRODUCT DRAWINGS AND

ASSOCIATED LISTS IF THEY MEET THE REQUIREMENTS OF ANSI Y14.1 (THE

GOVERNMENT DOES NOT FURNISH FORMS FOR DRAWING FORMATS.)'

PARA 4. DELETE THE FIRST SENTENCE AND REPLACE WITH 'PRODUCT

DRAWING AND ASSOCIATED LISTS SHALL CONFORM TO THE REQUIREMENTS OF

ASME Y14.24, ASME Y14.35M, ASME Y14.34M, MIL-STD-1840B, DD FORM

1423 and ISO 10303/AP 203/AP 209/AP 232 for 3-D Data.'

PARA 6. DELETE '...SELECTION WORK SHEET INCORPORATED IN THE

CONTRACT OR PURCHASE ORDER.' AND REPLACE WITH '...DD FORM 1423.'

PARA 7. DELETE THE SECOND SENTENCE AND REPLACE WITH 'THE TYPES OF

DRAWINGS AND LISTS WILL BE SELECTED BY THE CONTRACTOR.'

BLK 9: SINCE THIS DATA ITEM WILL BECOME PART OF THE IAE

ENGINEERING DATA PACKAGE TO SUPPORT FUTURE COMPETITIVE

REPROCUREMENTS, ENSURE IT DOES NOT CONTAIN PROPRIETARY MATERIALS

OR PROCESSES.

BLK 11: 20 WORKING DAYS PRIOR TO PCA.

BLKS 12 AND 13:

1. 20 WORKING DAYS PRIOR TO PCA, ONE SET OF PAPER COPIES OF ALL

'FINAL REPRODUCIBLE DATA' SHALL BE DELIVERED TO:

584 CBSS/GBHAA

420 RICHARD RAY BLVD, SUITE 200

ROBINS AFB, GA 31098-1640

SUBMITTAL SHALL BE ACCOMPANIED BY A LETTER OF TRANSMITTAL. PAPER

COPY SUBMITTAL WILL BE REVIEWED WITHIN 60 WORKING DAYS AFTER

RECEIPT OF DATA, UNLESS ADDITIONAL TIME IS REQUIRED, AT WHICH TIME

THE CONTRACTOR WILL BE NOTIFIED.

a. SUBMITTAL OF PROGRAMMING FILES, PER AIR FORCE (CAGE 98752)

DRAWING 9579776, SOFTWARE AND FIRMWARE DATA IS NOT REQUIRED FOR

THIS (PAPER) SUBMISSION.

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 2

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP X TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B007 PRODUCT DRAWINGS & ASSOCIATED LISTS DRAFT PRODUCT DRAWINGS

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81000C/T SOO PARA: 3.2.13.7 584 CBSS/GBHAA

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

SD REQUIRED SEE BLK 16 SEE BLK 16

A

C 11. AS OF DATE

SEE BLK 16

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS

BLKS 12 AND 13 (CONT.)

b. CONCURRENT WITH THE PAPER COPIES, SUBMIT FOUR (4)

REPRESENTATIVE SAMPLES OF EACH DIGITAL DATA FORMAT PER AIR FORCE

(CAGE 98752) DRAWING 9579776, (NATIVE, NEUTRAL, HPGL, DRAWING

METADATA SPREADSHEET, ETC.).

2. ALL DATA SUBMITTALS SHALL CONTAIN A SHIPPING LIST PREPARED TO

INCLUDE AS A MINIMUM, THE DOCUMENT NUMBER, REVISION LEVEL, AND

NUMBER OF SHEETS/PAGES. PART NUMBER, AND DRAWING SIZE IS

OPTIONAL. THE DATA DELIVERED SHALL BE IN THE SAME SEQUENCE AS THE

SHIPPING LIST. UNLESS PRIOR APPROVAL IS GRANTED BY 648 AESS/TAAM,

SHIPMENTS OF DATA MUST BE FOR COMPLETE ASSEMBLIES, i.e., LRU's AND SRU's. SHIPPING LIST SHALL SPECIFY WHETHER THE SHIPMENT IS

UPDATES, FINAL, OR MAKE-UP.

3. WHEN A SPECIFIC REVISION OF AN ENGINEERING DOCUMENT HAS BEEN

PREVIOUSLY FURNISHED AND APPROVED BY A USAF ENGINEERING DATA

REPOSITORY IN MICROFILM OR DIGITAL FORM AS A RESULT OF ANY

GOVERNMENT CONTRACT, AND IS REQUIRED BY THIS DD FORM 1423, THE

SAME DATA SHALL NOT BE RESUBMITTED PROVIDING IT MEETS THE

REQUIREMENTS IN THE DD FORM 1423 FOR EXISTING DATA. THIS DATA

SHALL BE IDENTIFIED AS BEING PREVIOUSLY SUBMITTED AND APPROVED AND

SHALL INCLUDE THE DOCUMENT NUMBER, REVISION, AND CONTRACT NUMBER

UNDER WHICH THE DATA WERE SUBMITTED. THE RECEIVING USAF

ENGINEERING DATA REPOSITORY SHALL BE IDENTIFIED. THIS ACTION IS

REQUIRED CONCURRENT WITH ALL SUBMITTALS.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

(PCO) ALICE.SANDERS@BROOKS.AF.MIL

(PCS) ALFORT.BELIN@BROOKS.AF.MIL

DELIVER 1 PAPER COPY AND 1 DIGITAL DATA COPY TO:

584 CBSS/GBHAA

420 SECOND STREET SUITE 100

ROBINS AFB,GA 31098-1640

DELIVER 1 PAPER COPY TO:

648 AESS/TAAM, IAE PM

7980 LINDBERGH LANDING

BROOKS CITY-BASE, TX 78235-5306

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 2 of 2

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER CMAN

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B008 CONFIGURATION STATUS ACCOUNTING INFORMATION

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-81253A SOO PARA: 3.2.13.8 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16 000 000 000

BLK 12: REVISED CONFIGURATION STATUS ACCOUNTING INFORMATION SHALL

BE DELIVERED IN CONJUNCTION WITH DRAFT CONFIGURATION ITEM (CI)

PRODUCT SPECIFICATION(S) (CDRL B006) AND PRODUCT DRAWINGS &

ASSOCIATED LISTS (CDRL B007).

BLK 13: DELIVER SUBSEQUENT SUBMITTALS AS REQUIRED.

BLK 14A: THE GOVERNMENT PROGRAM MANAGER WILL PROVIDE ADDITIONAL

DISTRIBUTION REQUIRED, TO INCLUDE ADDRESSEE'S EMAIL AND MAILING

ADDRESS AND NUMBERS OF COPIES.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B009 FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81315A SOO PARA: 3.2.13.9 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

ASREQ

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLKS 12 AND 13: PRELIMINARY REPORT DUE 2 WORKING DAYS AFTER EACH

FAILURE. FINAL REPORT DUE 10 WORKING DAYS AFTER CORRECTIVE ACTION

HAS BEEN IDENTIFIED. GOVERNMENT COMMENTS DUE 5 WORKING DAYS AFTER

RECEIPT OF FINAL REPORT. CONTRACTOR RESPONSE DUE WITHIN 5 WORKING

DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

BLK 14A: THE GOVERNMENT PROGRAM MANAGER WILL PROVIDE ADDITIONAL

DISTRIBUTION REQUIRED, TO INCLUDE ADDRESSEE'S EMAIL AND MAILING

ADDRESS AND NUMBERS OF COPIES.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B010 DATA ACCESSION LIST

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81453 SOO PARA: 3.2.13.10 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

N

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 12: SUBMIT REVISED DATA ACCESSION LIST IN CONJUNCTION WITH

DRAFT CONFIGURATION ITEM (CI) PRODUCT SPECIFICATION(S) (CDRL B006)

AND PRODUCT DRAWINGS & ASSOCIATED LISTS (CDRL B008).

BLK 13: SUBSEQUENT SUBMITTALS AS REQUIRED.

BLK 14A: THE GOVERNMENT PROGRAM MANAGER WILL PROVIDE ADDITIONAL

DISTRIBUTION REQUIRED, TO INCLUDE ADDRESSEE'S EMAIL AND MAILING

ADDRESS AND NUMBERS OF COPIES.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B011 ENGINEERING CHANGE PROPOSAL (ECP)

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80639C SOO PARA: 3.2.13.11 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ ASREQ

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

N/A

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: REFERENCE TO MILITARY STANDARDS SHALL BE FOR GUIDANCE

PURPOSES ONLY.

BLK 8: THE GOVERNMENT HAS 20 WORKING DAYS TO REVIEW THE

ENGINEERING CHANGE PROPOSAL.

BLK 12: ENGINEERING CHANGE PROPOSALS SHALL ONLY BE REQUIRED FOR

DESIGN CHANGES THAT OCCUR AFTER PHYSICAL CONFIGURATION AUDIT (PCA)

APPROVAL.

BLK 14A: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B012 SPECIFICATION CHANGE NOTICE (SCN)

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80639C SOO PARA: 3.2.13.12 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

N/A

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 8: THE GOVERNMENT HAS 20 WORKING DAYS TO REVIEW THE

SPECIFICATION CHANGE NOTICE (SCN). GOVERNMENT APPROVAL OF THE

ASSOCIATED ECP REPRESENTS APPROVAL OF THE DRAFT SCN.

BLK 12: SCN SHALL ONLY BE REQUIRED FOR DESIGN CHANGES THAT OCCUR

AFTER PHYSICAL CONFIGURATION AUDIT (PCA) APPROVAL. SCN SHALL BE

SUBMITTED IN CONJUNCTION WITH AN ECP (CDRL B011).

BLK 14A: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B013 NOTICE OF REVISION (NOR)

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80642C SOO PARA: 3.2.13.13 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

N/A

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 8: THE GOVERNMENT HAS 20 WORKING DAYS TO REVIEW THE NOTICE OF

REVISION (NOR). GOVERNMENT APPROVAL OF THE ECP REPRESENTS

APPROVAL OF THE DRAFT NOR.

BLKS 12 AND 13: DRAFT NOR SHALL BE SUBMITTED IN CONJUNCTION WITH

ECP (CDRL B011) THAT PROPOSES CHANGES TO APPLICABLE DOCUMENTS.

BLK 14: FINAL NORs WITH COMPLETE DESCRIPTION OF THE CHANGES TO

THE AFFECTED DOCUMENTS SHALL BE DISTRIBUTED TO THE DOCUMENT

CONTROLLER.

BLK 14A: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B014 REQUEST FOR DEVIATION (RFD)

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-CMAN-80640C SOO PARA: 3.2.13.14 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

N/A

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: USE GOVERNMENT STANDARDS AS REFERENCE DOCUMENTS.

BLKS 10 AND 12: SUBMIT DEVIATION REQUEST WITHIN 5 WORKING DAYS

AFTER GOVERNMENT CONCURRENCE OF THE PRECOORDINATED RECOMMENDED

CHANGE. ENSURE WAIVER ADDRESSES ALL THE IMPACTS TO THE CHANGES

BEING PROPOSED. DD FORM 1694 SHALL BE USED TO DOCUMENT CHANGES.

REQUEST PREPARATION INSTRUCTIONS AND DD FORM 1694 PRIOR TO FIRST

SUBMITTAL.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

(PCO) ALICE.SANDERS@BROOKS.AF.MIL

(PCS) ALFORT.BELIN@BROOKS.AF.MIL

SEND ONE HARD COPY TO:

648AESS/TAAM

7980 LINDBERGH LANDING

BROOKS CITY-BASE TX 78235-5119

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B015 AIR FORCE TECHNICAL MANUAL CONTRACT REQUIREMENT USER AND MAINTENANCE MANUALS 4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

TMCR TM-86-01K/T SOO PARA: 3.2.13.15 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

8.APP CODE C 11. AS OF DATE 13.DATE SUBSEQUENT SUBMISS a. ADDRESSEE Final A N/A SEE BLK 16 Draft Reg Repro

16. REMARKS SEE BLK 16 0000 0000 0000

BLK 4: REFERENCE TO MILITARY STANDARDS SHALL BE FOR GUIDANCE

PURPOSES ONLY.

BLKS 12 AND 13: DRAFT FINAL TECHNICAL MANUALS DUE 20 WORKING DAYS

PRIOR TO CONTRACTOR VALIDATION. FINAL TECHNICAL MANUALS, WHICH

INCORPORATE GOVERNMENT COMMENTS, DUE 20 WORKING DAYS AFTER

GOVERNMENT VERIFICATION.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

(ENG) KATHRYN.PARKER@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B016 TRAINING CONDUCT SUPPORT DOCUMENT TRAINING CURRICULUM

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81523B/T SOO PARAS: 3.2.13.16 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED SEE BLK16 SEE BLK 16

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16 0000 0000 0000

BLK 4:

a. REFERENCE TO MILITARY STANDARDS SHALL BE FOR GUIDANCE PURPOSES

ONLY.

b. AF HANDBOOK 36-2235, VOLUME 9 (HTTP://WWW.E-PUBLISHING.AF.MIL/

SHARED/MEDIA/EPUBS/AFH36-2235V9.PDF) AND AF MANUAL 36-2234

(HTTP://WWW.E-PUBLISHING.AF.MIL/SHARED/MEDIA/EPUBS/AFMAN36-

2234.PDF) MAY BE USED AS REFERENCES.

c. DI-SESS-81523B is TAILORED as follows:

PARA 1.a. – PREPARE LESSON PLANS IAW AETC INSTRUCTION 36-2203, PARA 7.7, WHICH MAY BE OBTAINED AT HTTP://WWW.E-PUBLISHING.AF.MIL/

SHARED/MEDIA/EPUBS/AETCI36-2203.PDF.

PARAS 1.b.; 2.2.2.r, ab, ae, af, ai, aj, ak; 2.4; 2.6; AND 3 DO

NOT APPLY.

BLK 8: GOVERNMENT APPROVAL OF THE CONTRACTOR'S TRAINING MATERIAL

DEVELOPMENT PROCESS AND SCHEDULE WILL BE PROVIDED INCREMENTALLY

VIA THE LOGISTICS INTREGRATED PRODUCT TEAM (IPT) FORUM.

BLKS 10, 12, AND 13: TRAINING CURRICULUM DEVELOPMENT VERIFICATION

WILL SUPPORT A 30%, 60%, AND 90% IN-PROCESS REVIEW. MATERIAL

SHALL BE DELIVERED 10 WORKING DAYS PRIOR TO IPR TO ALLOW TIME FOR

TEAM MEMBER REVIEW.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1 1161/183 http://www.e-publishing.af.mil/%20SHARED/MEDIA/EPUBS/AFH36-2235V9.PDF http://www.e-publishing.af.mil/%20SHARED/MEDIA/EPUBS/AFH36-2235V9.PDF http://www.e-publishing.af.mil/SHARED/MEDIA/EPUBS/AFMAN36-2234.PDF http://www.e-publishing.af.mil/SHARED/MEDIA/EPUBS/AFMAN36-2234.PDF http://www.e-publishing.af.mil/%20SHARED/MEDIA/EPUBS/AETCI36-2203.PDF http://www.e-publishing.af.mil/%20SHARED/MEDIA/EPUBS/AETCI36-2203.PDF

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B017 LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCTS PROVISIONING TECHNICAL DOCUMENTATION 4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ALSS-81529 SOO PARA: 3.2.13.17 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE

N/A

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16 0000 0000 0000

BLK 8: THE GOVERNMENT HAS 10 WORKING DAYS TO REVIEW THE INITIAL

SUBMISSION AND PROVIDE WRITTEN COMMENTS. CRITERIA FOR APPROVAL

SHALL BE CORRECT CONTENT AND FORMAT.

BLK 12: DRAFT IAE REPAIR PARTS RECOMMENDATIONS SHALL BE SUBMITTED

NO LATER THAN 20 WORKING DAYS PRIOR TO THE PRODUCTION READINESS

REVIEW (PRR).

BLK 13: FINAL IAE REPAIR PARTS RECOMMENDATIONS SHALL BE SUBMITTED

NO LATER THAN 5 WORKING DAYS AFTER RECEIPT OF GOVERNMENT REVIEW

COMMENTS. UPDATES TO THE REPAIR PARTS RECOMMENDATIONS SHALL BE

SUBMITTED WHENEVER SUBSTANTIAL CHANGES TO THE APPROVED DOCUMENT

OCCUR, BUT NOT MORE FREQUENTLY THAN ONCE PER MONTH.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B018 COST DATA SUMMARY REPORT DD FORM 1921

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FNCL-81565A/T SOO PARA: 3.2.13.18 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED QRTLY SEE BLK 16

A

C 11. AS OF DATE

SEE BLK 16

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4:

(A) REFERENCE TO MILITARY STANDARDS SHALL BE FOR GUIDANCE PURPOSES

ONLY.

(B) USE/RELATIONSHIP: SENTENCE “ALL CONTRACTORS MUST SUBMIT

REPORTS ELECTRONICALLY TO THE DEFENSE COST AND RESOURCE CENTER

(DCARC), WHO MAINTAINS A DATABASE OF CCDR DATA.” DOES NOT APPLY.

LEVEL OF REPORTING SHALL BE TO LEVEL 3 OF THE CONTRACT WORK

BREAKDOWN STRUCTURE.

(C) PREPARATION INSTRUCTIONS PARAGRAPH 2.e: LEAVE ITEM 4 BLANK

(D) PREPARATION INSTRUCTIONS PARAGRAPH 2.i: LEAVE ITEM 8 BLANK

BLK 8: THE GOVERNMENT HAS 10 WORKING DAYS TO REVIEW THE COST DATA

SUMMARY REPORT AND PROVIDE WRITTEN COMMENTS. THE CONTRACTOR HAS 5

WORKING DAYS AFTER RECEIPT OF COMMENTS TO INCORPORATE THE COMMENTS

AND SUBMIT THE REVISED REPORT. CRITERIA FOR APPROVAL SHALL BE

CORRECT CONTENT AND FORMAT.

BLK 11: AS OF DATE SHALL BE THE LAST DAY OF THE CONTRACTOR'S

ACCOUNTING PERIOD NEAREST THE END OF EACH CALENDAR QUARTER.

BLKS 12 AND 13: COST DATA SUMMARY REPORT SHALL BE SUBMITTED IN

CONJUNCTION WITH FUNCTIONAL COST-HOUR AND PROGRESS CURVE REPORT

(DD FORM 1921-1) (CDRL B019). SUBMITTALS DUE 20 CALENDAR DAYS

AFTER THE CLOSE OF THE CONRACTOR’S ACCOUNTING PERIOD NEAREST THE

END OF THE QUARTER.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B019 FUNCTIONAL COST-HOUR AND PROGRESS CURVE REPORT DD FORM 1921-1

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-FNCL-81566A/T SOO PARA: 3.2.13.19 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED QRTLY SEE BLK 16

A

C 11. AS OF DATE

SEE BLK 16

13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4:

(A) REFERENCE TO MILITARY STANDARDS SHALL BE FOR GUIDANCE PURPOSES

ONLY.

(B) USE/RELATIONSHIP: SENTENCE “ALL CONTRACTORS MUST SUBMIT

REPORTS ELECTRONICALLY TO THE DEFENSE COST AND RESOURCE CENTER

(DCARC), WHO MAINTAINS A DATABASE OF CCDR DATA.” DOES NOT APPLY.

BLK 8: THE GOVERNMENT HAS 10 WORKING DAYS TO REVIEW THE COST DATA

SUMMARY REPORT AND PROVIDE WRITTEN COMMENTS. THE CONTRACTOR HAS 5

WORKING DAYS AFTER RECEIPT OF COMMENTS TO INCORPORATE THE COMMENTS

AND SUBMIT THE REVISED REPORT. CRITERIA FOR APPROVAL SHALL BE

CORRECT CONTENT AND FORMAT.

BLK 11: AS OF DATE SHALL BE THE LAST DAY OF THE CONTRACTOR'S

ACCOUNTING PERIOD NEAREST THE END OF EACH CALENDAR QUARTER.

BLK 12: FUNCTIONAL COST-HOUR AND PROGRESS CURVE REPORT SHALL BE

SUBMITTED IN CONJUNCTION WITH COST DATA SUMMARY REPORT (DD FORM

1921) (CDRL B018). SUBMITTALS DUE 20 CALENDAR DAYS AFTER THE CLOSE

OF THE CONRACTOR’S ACCOUNTING PERIOD NEAREST THE END OF THE

QUARTER.

BLK 14B: FUNCTIONAL COST-HOUR AND PROGRESS CURVE REPORT SHALL BE

SUBMITTED VIA E-MAIL IN GOVERNMENT COMPATIBLE MICROSOFT EXCEL.

BLK 14: SEND ELECTRONIC LETTER OF TRANSMITTAL (LT) TO:

(PM) ALBERT.BURNETT@BROOKS.AF.MIL

(DM) WILLIAM.PELHAM@BROOKS.AF.MIL

William (Bill) Pelham Albert Burnett Data Manager Program Manager

DD FORM 1423-1, JUN 90 Computer Generated Previous editions are obsolete Page 1 of 1

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commands regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

CLIN 1004 B TDP TM OTHER SDMP

D. SYSTEM/ITEM

INTEGRATED AIRCREW ENSEMBLE (IAE)

E. CONTRACT/PR NO.

B020 BAR CODE IDENTIFICATION REPORT UID DATA FOR EMBEDDED COMPONENTS

4.AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI- MGMT-80177B /T SOO PARA: 3.2.13.20 648AESS/TAAM

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A

C 11. AS OF DATE 13.DATE SUBSEQUENT SUBMISS

SEE BLK 16

a. ADDRESSEE Final

Draft Reg Repro

16. REMARKS SEE BLK 16

BLK 4: CONTRACTOR FORMAT IS ACCEPTABLE. TAILORING OF DID

REQUIREMENTS:

A. PARA 2. DELETE MAGNETIC TAPE MEDIA FORMAT. USE DOD ELECTRONIC

COMMERCE METHODS.

B. PARA 2.1-2.15. REORDER/RENAME FIELDS FOR UID DATA ELEMENTS.

2.1 UID OF ITEM DELIVERED THAT CONTAINS THE EMBEDDED

SUBASSEMBLY, COMPONENT OR PART

2.2 UID OF THE EMBEDDED SUBASSEMBLY, COMPONENT OR PART

2.3 UID TYPE

2.4 ISSUING AGENCY CODE

2.5 ENTERPRISE IDENTIFIER

2.6 ORIGINAL PART NUMBER

2.7 SERIAL NUMBER

2.8 UNIT OF MEASURE

2.9 DESCRIPTION

2.10-…

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to Integrated Aircrew Ensemble, newest first.
File Type Posted
IAE Sol Amendment 5.pdf PDF
IAE Sol Amendment 6.pdf PDF
FA8902-08-R-1003-0004 —
FA8902-08-R-1003 —
FA8902-08-R-1003-0003 —
Clarifications P_Spec 8Sep08.pdf PDF
Clarifications IAE RFP_SOO(14Oct08).pdf PDF
IAE CDRLs —
IAE SOO —
FA8902-08-R-1003-0002 —
FA8902-08-R-1003-0001 —
Clarifications IAE RFP_SOO(2Oct08).pdf PDF
Clarifications RFP 19Sep08.pdf PDF
YA-L001 SEC L Atchs1-10_14Jul08_.pdf PDF
IAE Exhibit C CDRL.pdf PDF
IAE CDRL Preface.doc DOC document
IAE SOO _updated - 22 Aug 08_.pdf PDF
IAE Exhibit D CDRL.pdf PDF
IAE Exhibit A CDRL with Preface.pdf PDF
FA8902-08-R-1003.pdf PDF
IAE Exhibit B CDRL.pdf PDF
IAE RMP - Approved - 15 Nov 07.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .