(U) 00. HADES_Section L_20260630_Appendix-B-draft.pdf

PDF 113 KB Posted

Attached to
HADES (Hybrid Architecture and Development for Experimental Systems) Draft Request for Proposal
Solicitation number
FA8809-26-R-B002
Issued by

About this file

This is a Labor Rate Pricing Table template from Section L: Appendix B of a federal contract solicitation, specifically designed for Cost-Plus-Award-Fee (CPAF) and Firm-Fixed-Price (FFP) contract types under an Indefinite Delivery/Indefinite Quantity (IDIQ) vehicle.

The template establishes pricing structure for six labor categories with columns for: (B) Estimating Cost Excluding Cost of Money (COM); (C) COM charges; (D) Total Estimated Cost; (E) Award Fee; and (F) FFP rate. The Award Fee Table identifies CPAF award fee percentages applicable to Basic IDIQ Contract Line Items (CLINs). Currently, only CLIN 0001 "Mission Support" is populated in the Award Fee Table, with the Award Fee percent designated as "To be Completed by Offeror," indicating that offerors must propose this percentage as part of their bid. The instructions specify that for each labor category, the applicable Award Fee percent is applied to the total estimated cost excluding cost of money. For CPAF Task Orders, the Award Fee percent defined for each IDIQ CLIN applies to corresponding task order efforts. All pricing fields in the labor category table are blank, indicating this is a template requiring offeror completion during proposal submission.

View the file

Other files

File Type Posted
(U) 00. HADES_Section L_20260630.pdf PDF
(U) 00. HADES_Section L_20260630_Appendix-A-draft.pdf PDF
(U) 00. HADES_Section L_20260630_Appendix-C-draft.pdf PDF
(U) 00. HADES_Section M_20260630.pdf PDF
CONTENTS OF A VISIT REQUEST_July2025.pdf PDF
HADES RSC Tour Location.pdf PDF
DISS Visit Request Form (002).pdf PDF
(U) HADES_Evaluation_Executive Summary_20260529.pdf PDF
HADES DRFP Questions First and Second Round-GovermentResponse_05May2026.xlsx XLSX spreadsheet
Ground Control PWS V.2.pdf PDF
Jaguar PWS V.2.pdf PDF
Ground Support PWS V.2.docx DOCX document
Jaguar PWS V.2.docx DOCX document
HADES Contract-Notional Schedule V.2.pdf PDF
HADES IDIQ PWS Draft V.3.docx DOCX document
Ground Control PWS V.2.docx DOCX document
GC Notional Staffing Plan V.2.docx DOCX document
Attach 3 - Award Fee Plan-v.5 Draft.pdf PDF
Attach 5 Section M - 3.10.2026.pdf PDF
Attach 6 DD 254 for Solicitation.pdf PDF
Attach 7 GFP and Inventory List.xlsx XLSX spreadsheet
IndustryResponsesFirstRelease.pdf PDF
OCI Mitigation Plan Checklist.pdf PDF
Solicitation - FA880926RB002.pdf PDF
Attach 8 - HADES IDIQ CDRLs DRAFT V1.pdf PDF
Attach 2 - Ordering Instructions 6 Mar 26.pdf PDF
Attach 4 Section L - 3.10.2026.pdf PDF
HADES Contract-Notional Schedule.pdf PDF
Jaguar Notional Staffing Plan.pdf PDF
Ground Control Notional Staffing Plan.pdf PDF
Ground Support Notional Staffing Plan.pdf PDF
Ground Control PWS 1.0.pdf PDF
Jaguar PWS.pdf PDF
Ground Support PWS.pdf PDF
Attach 2 - Ordering Instructions.pdf PDF
Attach 4 - Section L.pdf PDF
DRAFT Solicitation - FA880926RB002.pdf PDF
Attach 6 - DD 254 for Solicitation.pdf PDF
Attach 1 - HADES IDIQ PWS Draft RFP.pdf PDF
Attach 3 - Award Fee Plan.pdf PDF
Attach 5 - Section M.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Section L: Appendix B

UNCLASSIFIED

Section L: Appendix B

Labor Rate Pricing Table

20XX Labor Rates (A)

Labor Category

CPAF Rates (F) FFP rate ($) (B) Estimating

Cost Excluding

COM ($)

(C) COM ($) (D) Total Estimated Cost ($)

(E) Award Fee

Labor Category 1 * Labor Category 2 * Labor Category 3 * Labor Category 4 * Labor Category 5 * Labor Category 6 *

* The Award Fee Table below identifies the Award Fee percent for each Basic IDIQ CLIN. For each Labor Category, the Award Fee percent defined for each Basic IDIQ CLIN is to be applied to the total estimated cost, excluding cost of money, for that Labor Category. For each CPAF Task Order, the Award Fee percent defined for each IDIQ CLIN will be applied to the corresponding efforts in the Task Order.

Award Fee Table

(A) Basic IDIQ CLIN (B) CLIN Description (C) Award Fee Percent (%) 0001 Mission Support To be Completed by Offeror

File details come from the government source that posted it. Updated .