(U) 00. HADES_Section L_20260630_Appendix-B-draft.pdf
PDF 113 KB Posted
- Attached to
- HADES (Hybrid Architecture and Development for Experimental Systems) Draft Request for Proposal
- Solicitation number
- FA8809-26-R-B002
- Issued by
-
Department of the Air Force
About this file
This is a Labor Rate Pricing Table template from Section L: Appendix B of a federal contract solicitation, specifically designed for Cost-Plus-Award-Fee (CPAF) and Firm-Fixed-Price (FFP) contract types under an Indefinite Delivery/Indefinite Quantity (IDIQ) vehicle.
The template establishes pricing structure for six labor categories with columns for: (B) Estimating Cost Excluding Cost of Money (COM); (C) COM charges; (D) Total Estimated Cost; (E) Award Fee; and (F) FFP rate. The Award Fee Table identifies CPAF award fee percentages applicable to Basic IDIQ Contract Line Items (CLINs). Currently, only CLIN 0001 "Mission Support" is populated in the Award Fee Table, with the Award Fee percent designated as "To be Completed by Offeror," indicating that offerors must propose this percentage as part of their bid. The instructions specify that for each labor category, the applicable Award Fee percent is applied to the total estimated cost excluding cost of money. For CPAF Task Orders, the Award Fee percent defined for each IDIQ CLIN applies to corresponding task order efforts. All pricing fields in the labor category table are blank, indicating this is a template requiring offeror completion during proposal submission.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Section L: Appendix B
UNCLASSIFIED
Section L: Appendix B
Labor Rate Pricing Table
20XX Labor Rates (A)
Labor Category
CPAF Rates (F) FFP rate ($) (B) Estimating
Cost Excluding
COM ($)
(C) COM ($) (D) Total Estimated Cost ($)
(E) Award Fee
Labor Category 1 * Labor Category 2 * Labor Category 3 * Labor Category 4 * Labor Category 5 * Labor Category 6 *
* The Award Fee Table below identifies the Award Fee percent for each Basic IDIQ CLIN. For each Labor Category, the Award Fee percent defined for each Basic IDIQ CLIN is to be applied to the total estimated cost, excluding cost of money, for that Labor Category. For each CPAF Task Order, the Award Fee percent defined for each IDIQ CLIN will be applied to the corresponding efforts in the Task Order.
Award Fee Table
(A) Basic IDIQ CLIN (B) CLIN Description (C) Award Fee Percent (%) 0001 Mission Support To be Completed by Offeror
File details come from the government source that posted it. Updated .