Attachment 5 - Davis Bacon Act

29 KB Posted

Attached to
Operation and Maintenance of the BTS at Shaw AFB
Solicitation number
FA8773-08-R-0082
Issued by

About this file

Davis Bacon Act (DBA) SC080010 dated 072508

Text of this file

SHAW AFB SC

FA8773-08-R-0082

General Decision Number: SC080010 07/25/2008 SC10 Superseded General Decision Number: SC20070010 State: South Carolina

Construction Types: Heavy (Heavy and Sewer and Water Line)

Counties: Abbeville, Allendale, Bamberg, Barnwell, Beaufort, Calhoun, Cherokee, Chester, Chesterfield, Clarendon, Colleton, Darlington, Dillon, Edgefield, Fairfield, Georgetown, Greenwood, Hampton, Horry, Jasper, Kershaw, Lancaster, Laurens, Lee, Marion, Marlboro, McCormick, Newberry, Oconee, Orangeburg, Saluda, Sumter, Union and Williamsburg Counties in South

Carolina.

IN ALLENDALE AND BARNWELL COUNTIES, DOES NOT INCLUDE THE

SAVANNAH RIVER SITE

HEAVY CONSTRUCTION PROJECTS (includes sewer & water line projects)

Modification Number Publication Date

0 02/08/2008

1 07/25/2008

* SUSC1990-005 02/08/1990

Rates Fringes

Boilermaker (tank work)........$ 12.96 3.315

Bricklayer.....................$ 6.55

Carpenter......................$ 7.42

Cement mason/concrete finisher.....................$ 6.93

Ironworker.....................$ 10.98

Pipefitter.....................$ 9.09

Truck driver...................$ 6.55

Electricians: (Linemen)..........$ 10.08

Laborers:

Chain saw...................$ 6.55

General.....................$ 6.55

Pipelayer...................$ 6.55

MANHOLE BUILDER..................$ 6.55

Power equipment operators:

Backhoe.....................$ 6.55

Bulldozer...................$ 6.55

Crane.......................$ 7.98

Dragline....................$ 6.55

Front end loader............$ 6.55

Mechanic....................$ 7.09

Motor grader................$ 7.15

Scraper - pan...............$ 6.55

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files

File Type Posted
Attachment 2 - Performance Work Statement —
Performance Plan.doc DOC document
Attachment 4 - Service Contract Act —
Contract Award - F34608-08-D-0012.doc DOC document
Attachment 3 - Equipment and Installation Performance Specification —
Revised APPENDIX 5.2.doc DOC document
Amendment A001.doc DOC document
Attachment 1 - Pricing TableAmendment 0001.xls XLS spreadsheet
Attachment 4 - Service Contract Act —
Preproposal Agenda.doc DOC document
Preproposal Attendance Sheet.pdf PDF
Questions and Answers.doc DOC document
Preproposal Notes.doc DOC document
Preproposal Conference Slides.pdf PDF
F34608-03-D-0003 Generic Shaw.pdf PDF
F34608-03-D-0003 Shaw.pdf PDF
Attachment 5 - Davis Bacon Act —
Attachment 3 - Equipment and Installation Performance Specification —
Attachment 2 - Performance Work Statement —
Attachment 4 - Service Contract Act —
Attachment 1 - Pricing Table.xls XLS spreadsheet
Attachment 6 - Past Performance Questionnaire —
SF 1449.doc DOC document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .