This is a Questions and Answers document for federal solicitation FA875126Q0900 for a Video Management System (VMS) installation at a multi-building military facility, dated 18 August 2026. The document does not specify response dates, award dates, or pricing terms.
The facility comprises approximately 125,000 square feet across multiple buildings constructed between 1998 and 2015. Installation requirements include 8MP (4K) IP cameras operating at up to 60 fps with Cat6/Cat6A or fiber backbones; twelve SmartPro UPS 1950VA/1920W line-interactive systems for head-end equipment and PoE switches with 10–15 minutes runtime; and integration with the existing Honeywell Pro-Watch Access Control System. Exterior cameras shall be mounted at 12–15 feet height unless otherwise directed. The solicitation is a "Brand Name" procurement with no substitutions permitted. Installation requirements mandate use of Rigid Galvanized Steel conduit for exterior runs, Electrical Metallic Tubing for interior, and PVC for underground; plenum-rated (CMP) cabling in all environmental air spaces above dropped ceilings; and core drilling through concrete masonry and reinforced concrete walls with fire-stopping per base regulations. Existing cable trays with 40% available capacity exist, but contractors must install J-hooks and local supports to device locations. Parts ordered, delivered on site, and attributable to the project are billable. The detailed List of Materials, drawings, and site visit information are provided as separate attachments to the solicitation package.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Video Management System – Solicitation FA875126Q0900
Questions and Answers
18 August 2026
1 How old is the facility?
Building construction dates vary, Buildings 1 & 2 were completed in 1998, Building 3 in 2005, and Buildings 101/106/1477/1609 are part of the West Campus expansion completed in 2015.
2 How much square footage is in the facility?
Total project area covers approximately 125,000 sq. ft. across multiple buildings. Offerors are still encouraged to verify specific dimensions during the site survey.
3 How stable is the power?
The facility is supplied by redundant utility power feeds. The requirement for UPS units, as specified in the LOM, is to ensure graceful shutdown during the automatic transfer switch (ATS) failover period, not due to general instability.
4 Is there a dropped ceiling in all areas of installation?
No, administrative areas (approx. 60%) have suspended acoustic tile ceilings. Industrial and exterior areas (approx. 40%) consist of hard lid, drywall, or open-joist ceilings.
5 What type of walls are in the perimeter areas?
Exterior walls are reinforced concrete and Concrete Masonry Units (CMU). Interior walls are a mix of CMU and steel-stud drywall.
6 Is drilling required between the walls?
Yes. Core drilling through interior CMU walls and exterior concrete walls for conduit and cable penetrations will be required. All penetrations must be fire-stopped in accordance with base regulations.
7 Does conduit need to be used?
Yes. Conduit is required for all cabling. Use Rigid Galvanized Steel (RGS) for exterior, Electrical Metallic Tubing (EMT) for interior, and PVC for underground runs.
8 Are the door frames metal and concrete filled?
Yes. All exterior door frames and frames leading to secure areas are hollow metal, concrete-grouted per base security standards.
9 Can you provide a list of IDS items?
This project is for a VMS installation. There are no IDS items (motion sensors, etc.) required by this List of Materials.
10 Are there existing IDS Sensors in doors?
This information is not relevant to the current VMS scope of work.
11 Who is the manufacturer of the existing IDS system?
The integration licenses listed in the LOM are for the existing Honeywell Pro-Watch Access Control System, not an IDS.
12 Can the existing cable be reused?
No. The LOM specifies highly modern 8MP (4K) IP cameras operating at up to 60 fps. These require high-bandwidth, structural Cat6/Cat6A or fiber backbones. Existing legacy coaxial or low-grade twisted pair cannot be reused.
13 Are Ceilings Suspended? Or Hard Lid?
Both are present. See response to question #4.
14 Are there existing Cable Trays?
Yes, cable trays with 40% available capacity exist in the main communication pathways.
However, the contractor is responsible for installing all necessary J-hooks or local supports from the main trunk to the device locations.
15 Can Existing Wiring be utilized?
No. See response to question #12.
16 Is a “UPS” required?
The LOM explicitly requires twelve (12) SmartPro UPS 1950VA / 1920W line-interactive systems to protect head-end gear and PoE switches. Runtime is typically engineered for 10–15 minutes of backup under full load to allow graceful system shutdown or generator cut-over.
17 Are “Or Equal” substitutions allowed?
This is a "Brand Name" solicitation. To maintain system standardization and compatibility with existing base infrastructure, substitutions are not permitted.
18 Is “Plenum Wire” acceptable?
Yes, and highly recommended. Standard military building codes (NFPA 90A / NEC) require plenum-rated (CMP) low-voltage cabling in all environmental air spaces above dropped ceilings.
19 Is “After Hours Access” available?
Typically, standard military installations allow coordinated after-hours or weekend access for escorts and contractors to prevent disruption to active-duty mission operations, but this must be evaluated on a case-by-case basis and cannot be guaranteed.
20 What is the height of exterior cameras?
Exterior cameras shall be mounted at a height of 12-15 feet, unless otherwise directed by the Contracting Officer's Representative (COR) during installation to achieve a specific field of view.
21 Please provide a list of equipment and parts # that are to be installed.
The detailed " Attch 1 - VMS Installation_Integration_LOM.pdf" was provided as a core component of the original solicitation package. Offerors are directed to reference that document for all required equipment and part numbers.
22 Are there pipe chases between floors?
The facility drawings indicate the presence of vertical pathways and utility risers between floors in the main buildings.
23. What is the range of the budget for this project, and is it already appropriated?
While the dollar amount cannot be disclosed, funds are available for this project.
24 Because of the high cost of the parts can we bill when parts arrive on site, or in the alternative are progress payments allowed?
Parts ordered, delivered on site, and attributable to this project can be billed for.
25 How many feet of new wire will have to be run?
The total footage of new wiring must be determined by the offeror. This calculation should be based on the device locations specified in the solicitation
26 What kind of cipher lock and quantities are required e.g. X-10
This solicitation does not include a requirement for cipher locks (such as the S&G X-10).
The scope is limited to the VMS and associated access control integration as defined in the List of Materials.
27 Please post the sign in sheet and Q&A's from the site visit.
Site visit sign in and Q&As will be posted.
28 Please post the drawings and the key for the drawings.
The drawings are posted as Attachment 3 to this solicitation.