Lebanon Airfield Ops - FA8730-22-R-0001 (CRM Round 4).xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Request for Proposal FA873022R0001 Lebanon Airfield Ops
Solicitation number
FA873022R0001
Issued by

About this file

This document contains a request for proposal from the Air Force Materiel Command for the Lebanese Armed Forces. The solicitation requests one precision approach path indicator (PAPI), one instrument landing system/distance measuring equipment (ILS/DME), two directional very high frequency omnidirectional range/distance measuring equipment (DVOR/DME) systems, associated support equipment, familiarization training, and support services. Proposals are due no later than December 7, 2021 by 5:00 PM Eastern Standard Time. The Air Force Materiel Command Life Cycle Management Center at Hanscom Air Force Base in Massachusetts issued the solicitation. Equipment is required to be delivered and installed by September 2023.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Concern #RFP ReferenceExisting RequirementQuestion or Reason for ConcernSuggested RevisionUSG Comment
1N/AN/ASeveral requirements called out in the specification are considered lower-level implementation details that are aligned with a specific vendor's product offering. Thales suggests that these requirements be brought up to the level of common, international standards for this equipment and not target a specific vendor. Requirements of concern are as follows.N/A
1aSRD 4.3[ILS/DME Standby Power] 24-28V DC no break battery backup system with two (2) hour minimum operation of critical equipmentVoltage specification for batteries has no functional impact on equipment performance.No break battery backup system with two (2) hour minimum operation of critical equipmentSRD 4.3 will be changed to: Backup system with two (2) hour minimum operation of critical equipment
1bSRD 4.3[ILS/DME Primary Power] 90- 260V AC ± 15%; 47-63 Hz single phaseIndustry standards such as 220VAC ±X% , 50 Hz ±X% rather than vendor format should prevail220VAC ±X% , 50 Hz ±X%Changed requirement to 220 VAC, 50 Hz
1cSRD 4.1.5[DVOR/DME Primary Power] 85 – 264 VAC, single phase, 47 – 63 HzIndustry standards such as 220VAC ±X% , 50 Hz ±X% rather than vendor format should prevail220VAC ±X% , 50 HC4:E5z ±X%Changed requirement to 220 VAC, 50 Hz
1dSRD 4.1.5[DVOR/DME Environment] -10° C to +50° C in shelter, -50° C to +70° C external, to 95% humidityIndustry standards such as FAA-G-2100H rather than vendor format should prevailEquipment must operate within humidity parameters per FAA-G-2100Haccept suggestion
1eSRD 4.3[ILS/DME Relative Humidity] Shelter Interior: Up to 90% non-condensing; Exterior: Up to 100% at +70º CIndustry standards such as FAA-G-2100H rather than vendor format should prevailEquipment must operate within humidity parameters per FAA-G-2100Haccept suggestion
1fSRD 4.1.5[DVOR/DME Modulation] Voice of 300 – 3000 Hz ± 1.5 dB amplitude responseIndustry standards such as IACO 3.3.6.3 rather than vendor format should prevailVoice of 300 – 3000 Hz ± 3.0 dB amplitude responseSRD 4.1.5 will be changed to: Voice of 300 – 3000 Hz ± 3.0 dB amplitude response
1gSRD 4.1.5[DVOR/DME Transmitter Output Power] 50 to 100 watts adjustableTransmitter output power needs only to be sufficient for achieving the ICAO performance specificationsAdjustable power sufficient to achieve ICAO performance specificationsaccept suggestion
1hSRD 4.1.5[DME Power Output] 1,000 W measured at the transmitter output connectorOutput power needs only to be sufficient for achieving the ICAO performance specificationsOutput power sufficient to achieve ICAO performance specificationsaccept suggestion
1iSRD 4.3[Localizer Power] Adjustable up to 17 WOutput power needs only to be sufficient for achieving the ICAO performance specificationsOutput power sufficient to achieve ICAO performance specificationsaccept suggestion
1jSRD 4.3[Glideslope Power] Adjustable up to 4 WOutput power needs only to be sufficient for achieving the ICAO performance specificationsOutput power sufficient to achieve ICAO performance specificationsaccept suggestion
1kSRD 4.3[DME Power Output] 100 W measured at the transmitter output connectorOutput power needs only to be sufficient for achieving the ICAO performance specificationsOutput power sufficient to achieve ICAO performance specificationsaccept suggestion
1lSRD4.3[DME Transponder Accuracy] ± 0.04 nmIndustry standards such as IACO rather than vendor format should prevailTransponder accuracy compliant with ICAO specificationsaccept suggestion
1m(DME Identification] Three letter Morse code at 1350 pps ± 10 ppsThe only industry standard is EUROCAE ED-57 which states 1350±25 pps.Three letter Morse code at 1350 pps ± 25 ppsSRD will be changed to: Three letter Morse code at 1350 pps ± 25 pps
2SOW 3Due to Hamat AB limited physical property size and free space, the LAF and U.S. Government (USG) have identified two potential off-base locationsThe RFP mentions two potential off-base locations for the Hamat DVOR/DME. Are both locations new installations or is one possibility the existing DVOR installation (CHEKKA) that is approximately 2 km off base? Can USAF provide any more clarification about the locations to assist with virtual siting evaluation?N/AOption 1: ~240m West of Runway 02 Threshold. 34°16'29.4"N 35°40'26.2"E

Option 2: 34°17'13.3"N 35°40'55.8"E LAF does not own CHEKKA and is not an optional location.

3N/AN/ADVOR/DME has no mention of battery backup. Is it intentional or an oversight?N/ABattery backup required for DVOR/DME as stated in the SRD section 3.4.6 a UPS shall be provided for all systems. A battery backup is inherently part of the UPS.
4N/AN/AWill other devices (besides those discussed in the RFP) share the FO link? Does this network touch any other network or have the possibility of being connected to an outside network?N/ALAF will provide necessary fiber optic comms between system and the ATCT. Upstream FO network is unknown at present
5SRD 4.1.3N/AShould there be Remote control and status for the DVOR/DME in the ATCT? Section 4.1.3 looks as if it might be incomplete.N/AYes, updated SRD
6SRD 4.1.3N/AShould there be a Remote Status Indicator for the DVOR/DME in the ATCT? Section 4.1.3 looks as if it might be incomplete.N/AYes, updated SRD
7N/AN/ACan USAF specify where ATC is or will be located at each of the bases?N/AHamat ATCT: 34°17'3.7"N, 35°40'49.6"E

Rayak ATCT: 33°51'6.2"N, 35°59'35.3"E

8N/AN/AWhat connections are available in the ATCT UPS for contractor provided equipment?N/AAssume UPS power not available at ATCT
9N/AN/ACan USAF identify the runways for the ILS equipment? This may help with planning.N/ARayak AB, Runway 22
10N/AN/AAre the DVORs for terminal or en route use? Thales suggests a specification for establishing flight check distances.N/ATerminal
11N/AN/AWhat type of connection will be used for controlling the PAPI (e.g. fiber optic)?N/ALAF will provide necessary fiber optic comms between system and the ATCT
12N/AN/AShould the bidder propose PAPI controls or are controls already available?N/ABidder Shall propose PAPI controls, any legacy controls should be considered unavailable.
13Section LN/ASection L, article 6.1.2, states that a fixed price of $758,000 will be used for CLIN 0010 evaluation purposes. Can USAF confirm if this is the correct/intended amount? Can USAF provide details of what is included in this amount (i.e. does it include anything beyond travel for contractor and subcontractors)?N/AThe fixed price of $758,000 is for evaluation purposes only - placing/starting potential offerors on equal footing. Clin 0010 is a cost reimbursable travel CLIN - in accordance with the Federal Acquisition Regulations, at the time CLIN 0010 is exercised/utilized, the costs must be reasonable, allocable and allowable.
14SOW 3N/ACan you specify that LAF will supply Fiber Optic and Power cables in SOW Item 3 Scope and Item 5 Civil Works Can LAF do the cablings into the trench lines or not?N/ALAF will procure and install FO communication and power infrastructure to each system installation site. The Contractor shall specify termination locations for the infrastructure. The Contractor shall be responsible for connecting systems to infrastructure terminations.
15N/AN/AIn the amendment lastly released RFP It doen not cover CLIN pages. Can we use the CLIN pages into the first relased RFP?N/ACLIN Pages included in latest released RFP amendment (003)
16SRD 4.4.24.4.2. The average intensity in red light will be at least 15,000 cd for a horizontal beamspread -6°to +6° and a vertical angle of 3.5° below transition. The transition sector will not exceed 3 minutes of arc over the full beam width. The unit will use one pre-focus halogen lamp rated 200 W per light channel. The expected life of the lamps will be not less than 1500 hours at full intensity and typically 4000-6000 hours in actual serviceIn SRD 4.4.2 It is requested the average intensity in red light will be at least 15,000 cd for a horizontal beamspread -6°to +6° and a vertical angle of 3.5° below transition. The transition sector will not exceed 3 minutes of arc over the full beam width. The unit will use one pre-focus halogen lamp rated 200 W per light channel. The expected life of the lamps will be not less than 1500 hours at full intensity and typically 4000-6000 hours in actual service). It is confirmed that the requested PAPI is no longer available in the manufacturer production.Overly constrained requirements removed from SRDRemoved overly constrained requirements from SRD. Defer to ICAO Annex 14 Volume 1 para 5.3.5 for requirements.
17SRD 4.4.24.4.2. The average intensity in red light will be at least 15,000 cd for a horizontal beamspread -6°to +6° and a vertical angle of 3.5° below transition. The transition sector will not exceed 3 minutes of arc over the full beam width. The unit will use one pre-focus halogen lamp rated 200 W per light channel. The expected life of the lamps will be not less than 1500 hours at full intensity and typically 4000-6000 hours in actual serviceIndustry standards such as ICAO Annex14 Volume 1 para 5.3.5 rather than vendor format should prevail. It should be that the expected life of the lamps will be not less than 1000 hours at full intensity and typically 3000-6000 hours in actual service.Overly constrained requirements removed from SRDRemoved overly constrained requirements from SRD. Defer to ICAO Annex 14 Volume 1 para 5.3.5 for requirements.
18N/AN/AWhat is the production and delivery time of equipmentN/AEquipment expected to be delivered & installed NLT September 2023.
19Section L 4.3.3 and 7.3.5N/AInstruction to Offers (Section L) item 4.3.3 does not exist. It passes from 4.3.2 to 4.3.4. In Instruction to Offers (Section L) Attachment 3 in 7.3.5 Section F Deliveries or performance RFP Cross Reference Matrix 4.3.3 item 4.3.3 is required to fill in CRM. Please clarify item 4.3.3N/ANumbering has been corrected in current RFP version (Amendment 4) Section L.
20Section L 7.3.5 CRM cross-references Section M 4.0N/AInstruction to Offers (Section L) item 4.3.3 does not exist. It passes from 4.3.2 to 4.3.4. In Instruction to Offers (Section L) Attachment 3 in 7.3.5 Section F Deliveries or performance RFP Cross Reference Matrix Enclosure 2, Enclosure 3 and Enclosure 4 are required to fill in CRM. But there are no Enclosure 2, Enclosure 3 and Enclosure 4 in RFP Document. Please clarify the enclosuresN/ANumbering has been corrected in current RFP version (Amendment 4) Section L. RFP Cross Reference Matrix has been updated in current RFP version (Amendment 4) to remove erroneous Enclosures 2-4.
21Section L 2.1.2N/AIn Attachment 3 – Section L item 2.12 The electronic copies of the proposal shall be submitted in a format readable by: Microsoft (MS) Word 2010, MS-Excel 2010, MS- Project 2010, and MS-Power Point 2010, as applicable. Can we submit our proposal in PDF format? Please clarify.N/AAll Proposals must be submitted in a Microsoft Office Application format listed in Section L. PDF proposals will not be accepted.

File details come from the government source that posted it. Updated .