Contruction Project to "Repair Hangar 1 and 2 Windows Project 130068 Facility 30206.
Solicitation number
FA8601-18-R-0018
Issued by

About this file

Project Drawings

View the file

Other files

File Type Posted
Responses_Preaward_RFI_questions_3-8.docx DOCX document
Pre_RFI_Questions_27-30_Response.docx DOCX document
Amendment__5_Addendum_1.docx.pdf PDF
Preaward_RFI_question_26_Response.docx DOCX document
Preaward_RFI_question_26.docx DOCX document
13Preserve-Brief-SteelWindows.pdf PDF
ZHTV130068_RFI_18-25_Respones.msg MSG file
Pre_RFI_Questions_09-17_respones.docx DOCX document
Amendment_4_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Amendment_2_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Rules_of_Engagement_Project_130068_FA8601-18-R-0018.rtf RTF text file
Environmental_Report_Project_130068.pdf PDF
Pre-award_RFI_Questions_1-8_Responses.docx DOCX document
Site_Visit_Attendance_List_10_July_18.pdf PDF
Amendment_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Wage_Determination_OH102_Project_130068.txt TXT text file
Pre_Award_RFIs_Responses_from_MACC_3-16.docx DOCX document
FA860118R0018.pdf PDF
WPAFB_BFS_and__Appendicies_Mar_2016.pdf PDF
Specifications_100_Percent_Submittal.pdf PDF
ZHTV130068_Combined_Drawings_with_Option.pdf PDF
Specifications_100_Percent_Submittal.pdf PDF
WPAFB_BFS_and__Appendicies_Mar_2016.pdf PDF
Wage_Determination_OH102.txt TXT text file
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STUCCOSTUC

WOOD

WITH

WEST

WELDED WIRE FABRIC

WOOD PANELING

WATERPROOF

WATER-RESISTANT

WIDE FLANGE

WATER CLOSET

WDP

WRES

WWF

WP

W

WC

WF

WD

W/

W

TREADS

URINAL

THROUGH

TYPICAL

TERRAZZO

TONGUE AND GROOVE

TOP OF STEEL

TOP OF WALL

TOP OF MASONRY

TELEPHONE

TOP OF CONCRETE

STRUCTURAL

TOP AND BOTTOM

SHEET VINYL

SUSPENDED

VERTICAL

VINYL TILE

VINYL WALL COVERING

VINYL COMPOSITION TILE

VINYL (BY OWNER)

VITRIFIED CLAY PIPE

THRU

V

VERT

VWC

VCP

VCT

VO

VT

TYP

UR

U

T & B

TEL

T & G

TOS

TOW

TOC

TOM

TER

T

STRUCT

SUSP

SV

T

RISERS

RADIUS

QUARRY TILE

ROOM

RESILIENT

RESISTANT

REQUIRED

RETAINING

RECESSED

SECTION

SQUARE

STEEL

STANDARD

SHEET

SIMILAR

SEALER

SOUTH

SCHEDULE

STAINLESS STEEL

SPECIFICATION

SOLID CORE WOOD

ROUGH OPENING

REINFORCED

REFERENCE

ROOF DRAIN

RUBBER

RM

SECT

SST

STL

STD

SHT

SIM

SPEC

SLNT

SQ

SCW

SCHED

S

RO

S

RBR

REINF

RES

RESIL

REQD

RET

REC

REF

RD

R R

QT

R

Q

PORCELAIN

PLATE

PLYWOOD

PLASTER

PAINT

PARTITION

POLYVINYL CHLORIDE

POUNDS PER SQUARE INCH

POUNDS PER SQUARE FOOT

PLASTIC LAMINATE

PORC

PSF

PLAS

PLYWD

PVC

PTN

PSI

PT

PLAM

PL

P

TROWELED EPOXYTE

RUBBER PADSRP

CONSTR CONSTRUCTION

EAST

ENAMEL

EXPANSION JOINT

EACH

ELEVATION

ELECTRICAL

EXPOSED STRUCTURE

EXISTING

EXPANSION

EXTERIOR

EQUAL

EQUIPMENT

EACH WAY

ELECTRIC WATER COOLER

EPOXY PAINTEPT

EWC

EXIST

EXP

EXT

EXP

EQUIP

EQ

EW

ENAM

ELEC

EJ

EL

E

EA

E

DIMENSION

DISPENSER

COLD ROLLED

DETAIL

DIAGONAL

DIAMETER

DOUBLE

CERAMIC TILE

CONTINUOUS

CARPET

DRYWALL

DRAWING

DOOR

DOWNSPOUT

DOWN

DIA

DISP

DIAG

DWG

DN

DW

DR

DS

DIM

DET

DBL

CPT

CONT

CR

CT

D

ACOUSTICAL TILE CEILINGACT

BRICKBRK

BASEMENT

CERAMIC

COLUMN

CONCRETE

CLEAN OUT

CEILING

CERAMIC MOSAIC

CORNER GUARD

CONTROL JOINT

CEMENT PLASTER

CEMENT

CATCH BASIN

CABINET

CONCRETE MASONRY UNIT

CER

CO

CONC

COL

CM

CLG

CMU

CG

CJ

BSMT

CEM PLAS

CAB

CEM

CB

C

ATTENUATION

ANCHOR

ALUMINUM

ALTERNATE

APPROXIMATELY

ADJUSTABLE

ABOVE FINISHED GRADE

ABOVE FINISHED FLOOR

BEARING

BOARD

BUILDING

BEAM

BLOCK

BOTTOM

BRG

BOT

BLK

BLDG

BM

BD

B

ATTEN

AFG

ALUM

AHR

APPROX

AFF

ADJ

ALT

SYMBOLS

CHANNEL

DIAMETER

ANGLE

AND

CENTER LINE

ACOUSTICAL

ACOUS. PLASTER

ACOUS

ACPL

LC

A

AT

BOLLARDBLD

FOUNDATION

FLOOR DRAIN

FLAT HEAD

FIREPLACE

FRAME

FIRE TREATED

FIREPROOFING

FOOTING

FINISH

FLOOR

FLUORESCENT

FLASH COVE

FPL

F.PRG

FTG

FR

FT

FDTN

FLUOR

FLCV

FH

FLR

FIN

FD

F

GEN

GALV

GYP

GYP BD

GYP PLAS

GL BLK

HDWD

HNDRL

HORIZ

HDW

INSUL

INV

IN

ID

INT

HM

HT

HD

HC

GA

GI

GT

GT

GL

GFI

GC

G

GYPSUM

INVERT

INSULATION

INCH

INTERIOR

INSIDE DIAMETER

I

H

HARDWOOD

HANDRAIL

HEIGHT

HOLLOW METAL

HORIZONTAL

HARDWARE

HEAD

HOLLOW CORE

GYPSUM BOARD

GYPSUM PLASTER

GROUND FAULT INTERRUPT

GENERAL CONTRACTOR

GAUGE

GLAZED TILE

GROUT

GENERAL

GLASS

GLASS BLOCK

GALVANIZED IRON

GALVANIZED

GROUND

G

JAN

J-BOX

JT

JANITOR

JOINT

JUNCTION BOX

J

KPL

KIT

KICKPLATE

KITCHEN

K

LAV

LAM

LVR

LT WT

LINO

LOUVER

LAVATORY

LAMINATE

LINOLEUM

LIGHT WEIGHT

L

MECH

MACH

MAX

MULL

MTL

MFR

MIN

MO

MR

MH

MANUFACTURER

MULLION

METAL

MASONRY OPENING

MARBLE

MINIMUM

MAN HOLE

MECHANICAL

MACHINE

MAXIMUM

M

NTS

NOM

N

NIC

N

NOT TO SCALE

NORTH

NOMINAL

NOT IN CONTRACT

OPP

OPNG

OC

OH

OD

OPPOSITE

ON CENTER

OVERHEAD

OPENING

OUTSIDE DIAMETER

O

HB HOSE BIB

ENLARGED DETAIL

INTERIOR ELEVATIONS

EXTERIOR ELEVATIONS

BUILDING / DETAIL SECTION

DRAWING TITLE

END OF SECTION

DRAWING SHEET NUMBER

DRAWING REFERENCE NUMBER

DRAWING SHEET NUMBER

DRAWING REFERENCE NUMBER

SCALE OF DRAWING

DRAWING TITLE

DRAWING REFERENCE NUMBER

DRAWING SHEET NUMBER

DRAWING REFERENCE NUMBER /

DRAWING SHEET NUMBER

DRAWING REFERENCE NUMBER

A.401

A.401

A.401

DRAWING NAME

1/4" = 1'-0"

A.701

A.401

BUILDING

SECTION

WALL

SECTION

ELEVATION INDICATIONS

GLASS

ACOUSTICAL

TILE

GYPSUM

BOARD

CONCRETE SIDING

LATH AND

PLASTER

MASONRY

WOOD

FINISHES

INSULATION

LOOSE OR

BATT

GLASS

SMALL SCALE

PLYWOOD

FINISH

RIGID

LARGE SCALE

ROUGH

METAL

METAL @

LARGE SCALE

STONE

CAST STONE

C.M.U.

METAL @

SMALL SCALE

FACE BRICK

CONCRETE

CONCRETE

EARTHWORK

EARTH OR

COMPACT FILL

LT. WEIGHT

CONCRETE

GRANULAR

FILL

SPRAY FOAM

GLASS BLOCK

BLOCKING

MORTAR

ROCK

BRICK CMU SHINGLES

CARPET

SHADED PORTION IS

THE SIDE CONSIDERED

ROOM NAME

KEY NOTE

REVISION/CHANGE

ROOM NUMBER DATUM POINT

MATCH LINE

OPENING SYMBOL

DOOR SYMBOL

GRAPHIC SYMBOLS

WORK POINT

COLUMN CENTER LINES

ROOM SYMBOL

WALL TYPE

R.D.

MISCELLANEOUS SYMBOLS

F.D.

CHANGE IN ELEVATION

ROOF DRAIN

FLOOR DRAINA

STORAGE

POCKET DOOR

BI-FOLD DOOR

DOUBLE ACTING DOOR

EXIST. DOOR TO REMAIN

NEW SINGLE DOOR

TYPICAL DOOR CONVENTIONS

ACCORDIAN FOLDING DOOR

DOOR WITH 180 DEGREE SWING

DOOR WITH EMERGENCY RELEASE HARDWARE

EXIST. DOOR TO BE REMOVED

NEW PAIR OF DOORS

4454 Idea Center Blvd Dayton, OH 45430-1500 937.461.5660 Fax: 937.461.0743

Proj. No.:

Date:

Revisions:

Sheet Name:

R E

P A

IR

H

A N

G A

R

H A

N G

A R

W

IN

D O

W S

P R

O

JE

C T:

Z H

TV

FA

C

IL

IT

Y : 3

W

PA

FB

3/

/2

4:

:0

PM

076800 04-11-2017

ABBREVIATIONS &

SYMBOLS

A-001

100% SUBMITTAL

ABBREVIATIONS REFERENCE SYMBOLS MATERIAL SYMBOLS

DRAWING SYMBOLS DOOR CONVENTIONS

Jill Elder - Liscence #6608

CL

A B E H L P

0"

0"

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

/2

4'

0"

3'

8"

1' - 3" 8' - 7" 50' - 0" 50' - 0" 50' - 0" 50' - 0" 1' - 3"

A-2011Si m

A-201 4 Si m

A-202

Sim

A-202

Sim

200' - 0"

A-202

Sim

A-201 2 A-2013Si m

A-202

Sim

EXISTING SIDE WINDOWS METAL PANELLED OVER TO REMAIN

C

LE

R

ES

TO

R

Y

- O

PE

R

AB

LE

W

IT

H V

EN

TS

M

ET

AL

P

AN

EL

O

VE

R

W

IN

D O

W S

C

LE

R

ES

TO

R

Y

- O

PE

R

AB

LE

N O

V

EN

TS

M

ET

AL

P

AN

EL

O

VE

R W

IN

D

O W

S

NOTE: REFER TO G-101 FOR FULL PROJECT DESCRIPTION. ALSO SEE

DESCRIPTION ABOVE TITLE OF EACH INDIVIDUAL ELEVATION TO AID IN THE

BIDDING PROCESS.

HANGAR #2

PHASE #1

HANGAR #1

PHASE #2

FRONT ENTRY SIDEHANGAR DOORS SIDE

SK

EE

L A

VE

N

U E

R U

N W

A Y

SI

D

E

EXISTING SIDE WINDOWS METAL PANELLED OVER TO REMAIN

INT. CLERESTORY

CATWALKS. CONT. INT. FIRE-

RATED PLYWOOD TO BE

INSTALLED ON THE FLOOR

AND 48" UP ON CATWALK

RAILING w/ CONT. SILICONE

SEALANT AND CAULK SUCH

THAT CATWALK BECOME

IMPENETRABLE SELF

CONTAINED SPACE TO

CAPTURE ANY FOD - 264 LF X

4' FLOOR X 4' HIGH RAILING =

2,112 SF X 6 CATWALKS =

12,672 SF FIRE-RATED

PLYWOOD TOTAL w/ CONT.

SEALANT

4' - 0" TYP. CATWALKS

INT. CLERESTORY CATWALKS.

CONT. INT. FIRE-RATED

PLYWOOD TO BE INSTALLED

ON THE FLOOR AND 48" UP ON

CATWALK RAILING w/ CONT.

SILICONE SEALANT AND

CAULK SUCH THAT CATWALK

BECOME IMPENETRABLE

SELF CONTAINED SPACE TO

CAPTURE ANY FOD - 264 LF X

4' FLOOR X 4' HIGH RAILING =

2,112 SF X 6 CATWALKS =

12,672 SF FIRE-RATED

PLYWOOD TOTAL w/ CONT.

SEALANT

C

LE

R

ES

TO

R

Y

- O

PE

R

AB

LE

W

IT

H V

EN

TS

M

ET

AL

P

AN

EL

O

VE

R

W

IN

D O

W S

C

LE

R

ES

TO

R

Y

- O

PE

R

AB

LE

N O

V

EN

TS

M

ET

AL

P

AN

EL

O

VE

R W

IN

D

O W

S

METAL PANEL OVER EXISTING SIDE WINDOWS

METAL PANEL OVER EXISTING SIDE WINDOWS

R

ES

TO

R

E

AL

L

EX

IS

TI

N G

W

IN

D O

W S

IN

C

LU

D

IN

G

C

LE

R

ES

TO

R

Y

PE

R T

H

IS

E

LE

VA

TI

O N

R

ES

TO

R

E

AL

L

EX

IS

TI

N G

C

LE

R

ES

TO

R

Y W

IN

D

O W

S

AB

O

VE

D O

O R

S

PE

R T

H

IS

E

LE

VA

TI

O N

1/A-201

2/A-201

2/A-202

1/A-202

3/A-2024/A-202

3/A -2

4/A -2

HANGAR DOOR SIDE 2/A-201

ENTRANCE SIDE 1/A-201

CL

B P

4'

0"

3'

8"

200' - 0"

NOTE: REFER TO G-101 FOR PROJECT

DESCRIPTION AND PHASING. ALSO SEE

DESCRIPTION ABOVE TITLE OF EACH INDIVIDUAL

ELEVATION TO AID IN THE BIDDING PROCESS.

HANGAR #2

PHASE #1

HANGAR #1

PHASE #2

FRONT ENTRY SIDE

HANGAR DOORS SIDE

SK

EE

L A

VE

N

U E

R U

N W

A Y

SI

D

E

15' - 0"

15' - 0"

ALL EXISTING LOOSE FOD, BIRD DROPPINGS, DUST,

LEAD BASED PAINT, & ASBESTOS RESTING ON ALL

INT. PERIMETER WALLS, INT. CLERESTORY WALLS,

CATWALKS, AND ADJACENT STRUCTURE, PIPING,

HVAC, AND ALL OTHER ELEMENTS WITHIN A 15'

RADIUS OF THESE WALLS TO BE DRY CLEANED /

DECONTAMINATED w/ HEPA VACUUMS AS WELL AS

ANY DEBREE CREATED DURING CONSTRUCTION. TO

INCLUDE HANGAR DOOR INTERIORS. TO INCLUDE

TOPS OF ALL HORIZONTAL SURFACES. TO INCLUDE

DISPOSAL. FOR OPTIMAL PERFORMANCE UTILIZE

EACH ENTIRE INDIVIDUAL HANGAR AS A SINGLE SELF

CONTAINED CONTAINMENT ZONE DURING CLEANING /

DECONTAMINATION PROCEDURE. ENTIRE HANGAR TO

BE CLEANED / DECONTAMINED UPON COMPLETION.

FOR OPTIMAL PERFORMANCE UTILIZE ENTIRE

INDIVIDUAL HANGAR AS A SINGLE CONTAINMENT

ZONE DURING CLEANING / DECONTAMINATION

PROCEDURE. TEMPORARY BARRICADES DURING

WINDOW RESTORATION TO BE SEALED TO EXISTING

BUILDING AS REQUIRED BY BASE REGULATIONS TO

MAINTAIN SELF-CONTAINED INTERIOR HAZARDOUS

CONTAINMENT ZONE, AND PROTECT THE INTERIOR

OF THE BUILDING FROM THE ELEMENTS.

928 (264 LF X 2 + 200 LF X 2) LF PERIMETER WALLS X 54' H =

APPROX. 50,112 SF.

+ 628 LF (264 LF X 2 + 50 LF X 2)X 2 CLERESTORY BUMP

OUTS X 17' H = APPROX. 21,352 SF

71,464 SF INT. VERTICAL SURFACES / HANGAR

X 2 HANGARS

= 142,928 SF VERT SURFACES TOTAL

SUBTRACT 21,812 RESTORED WINDOW SF

121,116 SF TOTAL WALL CLEAN-UP / DECONTAMINATION

PER ENTIRE PROJECT + 5,000 SF MISC. CLEAN-UP

NOTE: REFER TO PHASING & GENERAL NOTES ON

G-101. REFER TO SPECIFICATIONS SECTION 02

EXISTING CONDITIONS AND SECTION 4 OF

EXISTING ENVIRONMENTAL ANALYSIS REPORT

FOR ALL REQUIREMENTS AND REGULATIONS.

COORDINATE w/ BASE.

4454 Idea Center Blvd Dayton, OH 45430-1500 937.461.5660 Fax: 937.461.0743

Proj. No.:

Date:

Revisions:

Sheet Name:

R E

P A

IR

H

A N

G A

R

H A

N G

A R

W

IN

D O

W S

P R

O

JE

C T:

Z H

TV

FA

C

IL

IT

Y : 3

W

PA

FB

3/

/2

4:

:1

PM

076800 04-11-2017

FLOOR PLAN

A-101

100% SUBMITTAL

SCALE : 1" = 40'-0"1 FLOOR PLAN

N

SCALE : 1" = 80'-0"2 SITE PLAN

SCALE : 1" = 30'-0"3 ORIGINAL CONSTRUCTION AERIAL

FOR REFERENCE ONLY

FOR REFERENCE ONLY

SCALE : 1" = 80'-0"4 CLEANING CONTAINMENT PLAN

Jill Elder - Liscence #6608

TOTAL # OF

WINDOW TYPE

EXISTING WINDOW TYPE & COUNT

WINDOW

TYPE

W1

W1a

W2

W3

W3a

W3b

W4

W5

W6

W7

W8

W9

W10

W11

W12

W2n

W3n

1084TOTAL # OF

WINDOWS PER

EXISTING

BUILDING

EQ

EQ

EQ

EQ

EQ

W1

8'

3/

8"

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

4' - 10"

EQ

EQ

EQ

EQ

6'

/8

4' - 10"

W2

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

EQ

EQ

EQ

EQ

EQ

EQ

4' - 10"

/8

W3W1a

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

1 1/4"

1/

4" CONT. 1" TO 1-3/8" STEEL

FRAME AROUND ENTIRE

WINDOW - FIELD VERIFY

WIDTH OF EXISTING

FRAME. TYPICAL TO ALL

WINDOW FRAMES.

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

4' - 10"

EQ

EQ

EQ

EQ

6'

/8

W3a W3b

EQ

EQ

EQ

EQ

EQ

EQ

/8

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

4' - 10"

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

4' - 10"

EQ

EQ

EQ

EQ

EQ

EQ

/8

EQ

EQ

EQ

EQ

EQ

8'

3/

8"

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

4' - 10"

W2N IDENTICAL SIZE TO W2 BUT IS A NEW

WINDOW THAT HAS BEEN REPLACED.

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

EQ

EQ

EQ

EQ

EQ

EQ

4' - 10"

/8

W3N

IDENTICAL SIZE TO W3 BUT IS A NEW

WINDOW THAT HAS BEEN REPLACED.

REPLACEMENT WINDOW TO BE

CUSTOM FABRICATED TO EXACTLY

MATCH ORIGINAL CONSTRUCTION.

1' - 4 1/2" 1' - 4 1/2" 1' - 4 1/2" 1' - 4 1/2"

1' - 4 1/2"

6' - 10 1/2"

W8

EQ

EQ

EQ

EQ

EQ

8'

3/

8"

1' - 2 1/2" 1' - 2 1/2"

2' - 5"

EQ

EQ

EQ

EQ

6'

/8

W9

1' - 2 1/2" 1' - 2 1/2"

2' - 5"

/8

W10

EQ

EQ

EQ

EQ

EQ

EQ

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

3' - 7 1/2"

EQ

EQ

EQ

5'

3/

4"

W11

6'

6"

W12

2' - 2 1/2"

EQEQ

EQ

EQ

EQ

EQ

EQ

EQ

EQ

1' - 5"

6'

/8

8 1/2" 8 1/2"

EQ

EQ

EQ

EQ

EQ

1' - 5" 8'

3/ 8"

8 1/2" 8 1/2"

EQ

EQ

EQ

EQ

EQ

EQ

/8

1' - 5"

W4 W5 W6

EQ

EQ

EQ

EQ

1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2" 1' - 2 1/2"

1' - 2 1/2"

6' - 0 1/2"

6'

/8

W7

TYPE NOT INCLUDED IN RESTORATION

TO BE METAL PANELLED OVER

A-602

Sim

A-602

Sim

A-602

Sim 2

A-602

Sim

A-602

Sim

A-602

Sim

A-602

Sim

A-602

Sim

HEAD DTL. 3/A-602

TYP. ALL WINDOWS

JAMB DTL. 1/A-602

TYP. ALL WINDOWS

SILL DTL. 4/A-602 TYP.

ALL WINDOWS U.N.O.

SILL DTL. 2/A-602 TYP.

ALL FIRST FLOOR

WINDOWS (ALL NOTED)

TYPE NOT INCLUDED IN

RESTORATION TO BE METAL

PANELLED OVER

TYPE NOT INCLUDED IN

RESTORATION TO BE METAL

PANELLED OVER

= OPERABLE WINDOWS (SEE ELEVS.)

= HVAC INFILL (SEE ELEVS)

= EXISTING METAL PANEL OVER EXISTING WINDOWS (SEE ELEVS)

4454 Idea Center Blvd Dayton, OH 45430-1500 937.461.5660 Fax: 937.461.0743

Proj. No.:

Date:

Revisions:

Sheet Name:

R E

P A

IR

H

A N

G A

R

H A

N G

A R

W

IN

D O

W S

P R

O

JE

C T:

Z H

TV

FA

C

IL

IT

Y : 3

W

PA

FB

3/

/2

4:

:0

PM

076800 04-11-2017

WINDOW SCHEDULE

A-601

100% SUBMITTAL

SCALE : 1/4" = 1'-0"1 WINDOW SCHEDULE

NOTE: SCHEDULE DEPICTS WINDOW TYPES FOR ENTIRE BUILDING. SOME TYPES WILL NOT BE APPLICABLE TO THE RESTORATION PROCESS AS THEY WILL BE METAL PANELLED OVER. REFER TO ELEVATIONS IN CONJUNCTION WITH WINDOW SCHEDULE TO NOTE THE TYPES OF WINDOWS THAT WILL BE RESTORED.

CONTRACTOR TO VERIFY EXISTING WINDOW COUNT AS WELL AS COUNT OF HOW MANY WILL BE RESTORED.

NOTE: SCHEDULE DEPICTS WINDOW TYPES FOR ENTIRE BUILDING. SOME TYPES WILL NOT BE APPLICABLE TO THE RESTORATION PROCESS AS THEY WILL BE METAL PANELLED OVER. REFER TO ELEVATIONS IN CONJUNCTION WITH WINDOW SCHEDULE TO NOTE THE TYPES OF WINDOWS THAT WILL BE RESTORED. CONTRACTOR TO VERIFY EXISTING WINDOW COUNT AS WELL AS COUNT OF HOW MANY WILL BE RESTORED.

Jill Elder - Liscence #6608

SCALE : 1/4" = 1'-0"

WINDOW TYPE KEY

CL

A B E H L P

5 5

5 5

4454 Idea Center Blvd Dayton, OH 45430-1500 937.461.5660 Fax: 937.461.0743

Proj. No.:

Date:

Revisions:

Sheet Name:

R E

P A

IR

H

A N

G A

R

H A

N G

A R

W

IN

D O

W S

P R

O J E

C T

Z

H T

V

F

A C

IL

IT

Y

W P

A F

B

/3

/2

:4 :0

P

M

076800

04-11-2017

MECHANICAL &

ELECTRICAL FLOOR

PLAN

ME101

100% SUBMITTAL

SCALE : 1" = 40'-0"1

MECHANICAL/ELECTRICAL FLOOR PLAN

N

DRAWING NOTES

1. THE EXISTING TOILET ROOM EXHAUST DUCT CURRENTLY LOCATED IN THE SOUTHEAST

CORNER OF THE HANGAR #2 TO BE RELOCATED TO DISCHARGE THROUGH THE METAL

WALL PANEL IN LIEU THROUGH THE GLAZING OF THE WINDOW SYSTEM. NEW LOUVERS TO

BE INSTALLED FOR THE NORTH AND SOUTH TOILET ROOMS. FIELD VERIFY EXACT LOUVER

SIZE AND EXISTING CLEARANCES FOR NEW DUCTWORK.

2. THE EXISTING STORM WATER PIPE IN THE NORTHEAST WALL OF THE HANGAR #2 TO BE

RELOCATED TO PENETRATE THE MASONRY WALL BELOW THE WINDOWS. COORDINATE

EXACT LOCATION WITH E.C.

3. THE EXISTING COMPRESSED AIR PIPING LOCATED IN THE NORTHEAST WALL OF THE

HANGAR #2 TO BE RELOCATED TO PENETRATE THE MASONRY WALL BELOW THE WINDOWS.

4. EXISTING LOUVERS AT CLERESTORY LEVEL ON THE EAST SIDE TO BE REMOVED AND

REPLACED WITH THE NEW LOUVERS. FIELD VERIFY EXACT LOUVER SIZE.

5. EXISTING MANUAL OPERATING SYSTEM FOR THE CLERESTORY WINDOWS TO BE REPLACED.

PROVIDE NEW GEARS AND CHAIN OPERATORS TO RESTORE MANUAL OPERATING SYSTEM

TO ORIGINAL CONDITIONS. (8) - WINDOW OPERATOR IN EACH HANGAR (#2 AND #1) TO BE

REPLACED. WEST SIDE OF HANGARS, THE OPERATOR SHALL HAVE EXTENSIONS ON THE

GEAR SHAFT FOR PROPER CHAIN OPERATION. FIELD VERIFY OPERATING SYSTEM

CLEARANCES.

6. REMOVE EXISTING ABANDONED 75 KWA TRANSFORMER MOUNTED AT SECOND WINDOW

LEVEL IN HANGAR #2.

7. EXISTING TRANSFORMER AND PANEL BOARD MOUNTED ON WALL BELOW WINDOWS.

RELOCATE PANEL AND TRANSFORMER 6" FROM WALL ON UNISTRUT SUPPORTS. EXTEND

EXISTING WIRING TO NEW LOCATION.

8. (4) EXISTING CONDUITS IN THE NORTHEAST CORNER OF THE HANGAR #2 TO BE

RELOCATED ABOVE THE RELOCATED STORM PIPE. COORDINATE EXACT LOCATION WITH H.C.

G-101 with OPTION
A-001
Sheets
A-001 - ABBREVIATIONS & SYMBOLS
A-101 - FLOOR PLAN
A-201 - EXTERIOR ELEVATIONS
A-202 - EXTERIOR SIDE ELEVATIONS
A-601 - WINDOW SCHEDULE
A-602 - DETAILS
A-603 - DETAILS
G-101 - COVER SHEET
A-101
Sheets
A-001 - ABBREVIATIONS & SYMBOLS
A-101 - FLOOR PLAN
A-201 - EXTERIOR ELEVATIONS
A-202 - EXTERIOR SIDE ELEVATIONS
A-601 - WINDOW SCHEDULE
A-602 - DETAILS
A-603 - DETAILS
G-101 - COVER SHEET
A-201 with OPTION
A-202 with OPTION
A-601
Sheets
A-001 - ABBREVIATIONS & SYMBOLS
A-101 - FLOOR PLAN
A-201 - EXTERIOR ELEVATIONS
A-202 - EXTERIOR SIDE ELEVATIONS
A-601 - WINDOW SCHEDULE
A-602 - DETAILS
A-603 - DETAILS
G-101 - COVER SHEET
A-602 with OPTION
A-603 with OPTION
ME-101
Sheets
ME101 - MECHANICAL & ELECTRICAL FLOOR PLAN

File details come from the government source that posted it.