Pre-award Request for Information: FA8601-18-R-0018 Please clarify a question below regarding project Repair Hangar 1 & 2 Windows F30206:
26. Asbestos Report, page 16, points to asbestos materials contained in the original siding covered by the new siding panels. Does the contractor have to remove this old siding including removal and re-installation of the new siding panels or this work shall not be addressed in the proposal?
ANSWER: The asbestos report was for information only. It is not part of the contract documents. Contractor only needs to follow the drawings and specs. The work mentioned above should not be part of the proposal since it is not listed in the contract documents.