Preaward_RFI_question_26_Response.docx

DOCX document 21 KB Posted

Attached to
Contruction Project to "Repair Hangar 1 and 2 Windows Project 130068 Facility 30206.
Solicitation number
FA8601-18-R-0018
Issued by

View the file

Other files

File Type Posted
Responses_Preaward_RFI_questions_3-8.docx DOCX document
Pre_RFI_Questions_27-30_Response.docx DOCX document
Amendment__5_Addendum_1.docx.pdf PDF
Preaward_RFI_question_26.docx DOCX document
13Preserve-Brief-SteelWindows.pdf PDF
ZHTV130068_RFI_18-25_Respones.msg MSG file
Pre_RFI_Questions_09-17_respones.docx DOCX document
Amendment_4_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Amendment_2_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Rules_of_Engagement_Project_130068_FA8601-18-R-0018.rtf RTF text file
Environmental_Report_Project_130068.pdf PDF
Pre-award_RFI_Questions_1-8_Responses.docx DOCX document
Site_Visit_Attendance_List_10_July_18.pdf PDF
Amendment_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Wage_Determination_OH102_Project_130068.txt TXT text file
Pre_Award_RFIs_Responses_from_MACC_3-16.docx DOCX document
FA860118R0018.pdf PDF
WPAFB_BFS_and__Appendicies_Mar_2016.pdf PDF
ZHTV130068_Combined_Drawings_with_Option.pdf PDF
Specifications_100_Percent_Submittal.pdf PDF
ZHTV130068_Combined_Drawings_with_Option.pdf PDF
Specifications_100_Percent_Submittal.pdf PDF
WPAFB_BFS_and__Appendicies_Mar_2016.pdf PDF
Wage_Determination_OH102.txt TXT text file
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-award Request for Information: FA8601-18-R-0018 Please clarify a question below regarding project Repair Hangar 1 & 2 Windows F30206:

26. Asbestos Report, page 16, points to asbestos materials contained in the original siding covered by the new siding panels. Does the contractor have to remove this old siding including removal and re-installation of the new siding panels or this work shall not be addressed in the proposal?

ANSWER: The asbestos report was for information only. It is not part of the contract documents. Contractor only needs to follow the drawings and specs. The work mentioned above should not be part of the proposal since it is not listed in the contract documents.

File details come from the government source that posted it.