Pre_RFI_Questions_27-30_Response.docx

DOCX document 23 KB Posted

Attached to
Contruction Project to "Repair Hangar 1 and 2 Windows Project 130068 Facility 30206.
Solicitation number
FA8601-18-R-0018
Issued by

View the file

Other files

File Type Posted
Responses_Preaward_RFI_questions_3-8.docx DOCX document
Amendment__5_Addendum_1.docx.pdf PDF
Preaward_RFI_question_26_Response.docx DOCX document
Preaward_RFI_question_26.docx DOCX document
13Preserve-Brief-SteelWindows.pdf PDF
ZHTV130068_RFI_18-25_Respones.msg MSG file
Pre_RFI_Questions_09-17_respones.docx DOCX document
Amendment_4_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Amendment_2_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Rules_of_Engagement_Project_130068_FA8601-18-R-0018.rtf RTF text file
Environmental_Report_Project_130068.pdf PDF
Pre-award_RFI_Questions_1-8_Responses.docx DOCX document
Site_Visit_Attendance_List_10_July_18.pdf PDF
Amendment_to_Soliticitation_FA8601-18-R-0018_Project_130068_Repair_Hangar_1_and_2_Windows.pdf PDF
Wage_Determination_OH102_Project_130068.txt TXT text file
Pre_Award_RFIs_Responses_from_MACC_3-16.docx DOCX document
FA860118R0018.pdf PDF
WPAFB_BFS_and__Appendicies_Mar_2016.pdf PDF
ZHTV130068_Combined_Drawings_with_Option.pdf PDF
Specifications_100_Percent_Submittal.pdf PDF
ZHTV130068_Combined_Drawings_with_Option.pdf PDF
Specifications_100_Percent_Submittal.pdf PDF
WPAFB_BFS_and__Appendicies_Mar_2016.pdf PDF
Wage_Determination_OH102.txt TXT text file
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre award Request for Information: FA8601-18-R-0018 Please clarify a question below regarding project Repair Hangar 1 & 2 Windows F30206:

27. Regarding the Government response to RFI #10 that states that “only interior cleaning” is required to the windows that are receiving the metal panels.

· Does this interior cleaning require re-painting of the interior side of these windows?

· Does the interior cleaning and re-painting of the interior side of windows apply for the windows that already have metal panels installed over them?

ANSWER: Cleaning required throughout interior of hangar. No painting or repair work on the existing metal covered windows; nor those windows designated to receive metal panels.

Please clarify a question below regarding project Repair Hangar 1 & 2 Windows F30206:

28. Spec 09 96 00, para 3.2.1 states that power tool conform to SSPC-SP11 for cleaning to white metal is allowed for window frames prepped in the field. Please confirm that this statement is accurate. The general notes on the drawings and some of the answers to previous question state that sand blasting only.

ANSWER: SSPC-SP11 is valid for this specification. A sand blaster was expected to be used, but means and methods of meeting the spec is up to the contractor.

29. On the Q&A you previously posted to FBO, #16 states that the window restoration contractor shall install the glass with clear silicone then neatly apply putty over that. I would highly recommend against that since silicone sealants are not compatible with traditional linseed oil glazing compounds. The person asking the question said that you could bed the glass in silicone and then putty glaze around the interior. This also will present a problem with the silicone in close proximity of the glazing and will cause the glazing to prematurely fail.

Our opinion is that you will need to either stay with all silicone sealant products or all glazing putty products. These two products are not compatible long term.

ANSWER: Strike RFI answer #16. Remove putty from scope. Use silicone products only.

30. Can you please outline the attachment of the metal siding panels being installed over the existing windows? How are the siding panels to be attached to the existing windows?

ANSWER: Refer to drawing A-602 for information via section details. Attaching siding panels is up to the contractor’s means and methods. Design intent is that the new panels protect windows from the weather, that they match the existing panels, and once installed that they simply not fall off the building.