Attachment_4_-_WPAFB_Preventative_Mx_List.xlsx

XLSX spreadsheet 122 KB Posted

Attached to
Civil Engineering Facility & Equipment Support Service Federal contract opportunity
Solicitation number
FA8601-17-R-0025
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Attachment 4 - Preventative Maintenance Task List

View the file

Other files for this federal contract opportunity

Other files attached to Civil Engineering Facility & Equipment Support Service, newest first.
File Type Posted
Attachment_01_-__CE_Support_Contract_PWS_4_Aug_2017.pdf PDF
Attachment_08_-_SCA_Wage_Determination_15-4731_--_Revision_3.pdf PDF
Attachment_03_-_FINAL_Equip_List_Aug_7_2017.pdf PDF
Questions_and_Comments__3.pdf PDF
Attachment_11_-_Instructions_and_Evaluations_Criteria_-_Final.pdf PDF
CE_Facility_&_Equipment_Support_Amendment_0003.pdf PDF
Attachment_11_-_Instructions_and_Evaluation_Commercial_v5.pdf PDF
Questions_and_Comments_.pdf PDF
CE_Facility_&_Equipment_Support_Amendment_0002.pdf PDF
Attachment_7_-_Bid_Schedule_Final_A002.xlsx XLSX spreadsheet
Attachment_1_-_CE_Support_Contract_PWS_6.26.2017.pdf PDF
Attachment_11_-_Instructions_and_Evaluation_Commercial_v5.pdf PDF
Site_Visit_Meeting_Minutes.pdf PDF
Site_Visit_-_Contractor_Attendees.pdf PDF
Site_Visit_-_CE_Maintenance_and_Repair_Contract_Updated.pdf PDF
Attachment_7_-_Bid_Schedule_Final_A001.xlsx XLSX spreadsheet
CE_Facility_&_Equipment_Support_-_Amendment_0001.pdf PDF
Site_Visit_-_Government_Attendees.pdf PDF
Combined_Pre-Site_Visit_Q&A_26_July_2017.pdf PDF
Attachment_2_-_Bldg_Numbers_A001.pdf PDF
Lab_Software_Presentation.pdf PDF
Attachment_8_-_SCA_Wage_Determination_15-4731--Revision_2.pdf PDF
Attachment_8_-_SCA_Wage_Determination_15-4731.pdf PDF
FA8601-17-R-0025_CE_Facility_Mx_and_Support_V3.pdf PDF
Attachment_6_-_Historical_Repair_over_$10K.pdf PDF
Attachment_13_-_Facility_Tools_List.xlsx XLSX spreadsheet
Attachment_1_-_CE_Support_Contract_PWS_6.16.2017.pdf PDF
Attachment_11_-_Instructions_and_Evaluation_Commercial_v4.pdf PDF
Attachment_7_-_Bid_Schedule_Final.xlsx XLSX spreadsheet
Attachment_10_-_Past_Performance_Questionnaire_.docx DOCX document
Attachment_5_-_Historical_Repair_under_$10k.pdf PDF
Attachment_12_-_Area_B_Map_Site_Visit.pdf PDF
Attachment_3_-_Equipment_List_Final.pdf PDF
Attachment_9_-_WPAFB_Base_Facility_Standard.pdf PDF
Attachment_14_-_Subcontractor_Consent_Letter.docx DOCX document
Attachment_2_-_Bldg_Numbers.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

TABLE OF CONTENTS

D5023 500 1950Air Handler UV Lights
D2023 220 0000ChromaLox Elec Water Heater
D3095-122-1951Screw Air Compressor
D3000-500-1950Purge Alarm
D5015-260-1950Subpanels up to 600A
D5015-210-1950Distribution Panelboard 600 Amps and Larger
D3045-110-3950Air Handler with Humidification
D3095-500-1950Refrigerated Air Dryer
D2013-9x0-0000Emergency Eye Wash and Showers
D3045-500-5000Glycol Make Up Station
D5095-210-3951Diesel Generator Cat C175
D5000-500-1951Cat C175 Genset Enclosure
D5095-500-1951Piller Rotary UPS
D5095-500-19523 ph Battery UPS
D5015-500-1951Lakeshore Paralleling Switchgear
D5000-500-1952Load Bank
D3095-220-1950Dessicant Dryer
D5095-250-1950Lightning Protection
D3065-100-1950Variable Frequency Drive (VFD)
E1095 123 3950Elec Monorail Crane (to 25' length)
E1095 123 3951Elec Monorail Crane (25' - 50' length)
E1095 123 3952Elec Monorail Crane (Over 50' length)
E1095 123 3953Manual Monorail Crane (to 25' length)
E1095 123 3954Manual Monorail Crane (25' - 50' length)
E1095 123 3955Manual Monorail Crane (Over 50' length)
B2013-330-1040Control Dampers

AHU UV Lights

Equipment Type:D5023 500 1950
Component:Air Handler UV LightsREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Coordinate air handler shutdown in writing with facility personnel0.1600000000010.1610.16
2Lock Out/Tag Out air handler prior to entering0.2500000000010.2510.25
3NOTE – DO NOT TOUCH UV BULBS WITH BARE HANDS – USE GLOVES0.000000000000000
4Remove and replace all UV bulbs1.000000000000011
5Clean UV bulbs with clean cotton cloth and isopropyl alcohol0.5000000000010.500
6Verify UV bulb length, wattage, model numbers for ordering0.1600000000010.1600
7Remove Lock Out/Tag Out0.2500000000010.2510.25
8Restart air handler, verify proper operation0.2500000000010.2510.25
9Verify all UV lights proper operation0.1600000000010.1610.16
10Fill out maintenance checklist and report deficiencies0.1500000000010.1510.15
11NOTE - USE CONFINED SPACE ENTRY PROCEDURES AS NECESSARY0.000000000000000
Total Labor-hours/period2.8800.000.000.000.001.882.22
Total Labor-hours/year4.10
Table of Contents

ChromaLox Wtr Htr

Equipment Type:D2023 220 0000
Component:ChromaLox Elec Water HeaterREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Inspect for Leaks0.08000000040.320000
2Check for correct water temperature0.250000000410000
3Operate safety / relief valve0.08000000040.320000
4Inspect wiring connections0.08000000040.320000
5Fill out maintenance checklist and report deficiencies0.15000000040.60000
Total Labor-hours/period0.6400.000.000.002.560.000.00
Total Labor-hours/year2.56
Table of Contents

Screw Air Compressor

Equipment Type:D3095 122 1951
Component:Screw Air CompressorREF2504482110.5
PM Components (Task Description)Labor HrsDWMQSA2 Yr
1Check air/oil reservoir oil level0.09000443.960000000000
2Check operation of the machine, is it loading and unloading properly0.17000447.480000000000
3Check discharge pressure and temperature0.08000443.520000000000
4Check control panel for advisory text messages0.08000443.520000000000
5Inspect, Clean if necessary Cooler / Fan0.080000080.6400000000
6Replace oil filter element0.3500000000010.3510.3500
7Replace air filter element0.2500000000010.2510.2500
8Take Oil Sample / Provide Analysis Report0.2000000000010.210.200
9Replace cool air inlet filter pad (if app.)0.1500000000010.1510.1500
10Replace Control Box Filter (if app.)0.1500000000010.1510.1500
11Visually check for leakage Shaft Seal0.080000000010.0810.0800
12Replace Lubricant *0.3500000000010.3510.3500
13Replace Air/Oil Separator0.500000000000010.500
14Inspect, clean if necessary scavenge line, replace check valve0.080000000000010.0800
15Inspect, service if necessary Inlet Valve0.080000000000010.0800
16Inspect, re-grease if necessary Motor Bearings0.080000000000010.0800
17Inspect, replace if necessary Drive Belts (if app.)0.080000000000010.0800
18Inspect, replace if necessary Min. Pressure/Check Valve0.080000000000010.0800
19Check pressure relief valve0.080000000000010.0800
20Inspect, repair if necessary the Condensate Drains0.080000000000010.0800
21Inspect, replace if necessary Solenoid Valves / Vacuum Switch0.08000000000000010.08
22Inspect, replace if necessary Blow-down Valve0.08000000000000010.08
23nspect, replace if necessary Thermistor Probes0.08000000000000010.08
24Inspect, replace if necessary Pressure Transducer0.08000000000000010.08
25Inspect, replace if necessary Control Valves and Pressure Regulator0.08000000000000010.08
26Inspect, replace if necessary Thermal Mixing Valve0.08000000000000010.08
27Inspect, replace if necessary the drive Coupling Spider0.08000000000000010.08
28Inspect, replace if necessary Hoses0.08000000000000010.08
29Compile list of discrepancies and open corrective maintenance job order(s) to make the repair(s)0.1500446.681.20010.1510.1510.15
* - Drain and change as indicated by oil Analysis report, hour life rating of lubricant or every 12 months,whichever occurs first.
Total Labor-hours/period3.8800.0025.081.840.001.682.740.79
Total Labor-hours/year31.34
Table of Contents

Purge Alarm

Equipment Type:D3000 500 1950
Component:PURGE ALARM (Lab 7)REF250448211
PM Components (Task Description)Labor HrsDWMQSA
1NOTIFY BUILDING OCCUPANTS THAT THE SYSTEM WILL BE TESTED0.20000000040.80000
2PHYSICALLY CHECK PUSHBUTTON STATIONS FOR SIGNS OF VISUAL DAMAGE0.20000000040.80000
3ACTIVATE ALARM BY PUSHING ALARM PUSHBUTTON STATIONS0.250000000410000
4INSURE BOTH AUDIO & VISUAL ALARMS AND BEACONS WORK0.250000000410000
5ENSURE APPROPRIATE DAMPERS OPEN AND CLOSE AS REQUIRED0.30000000041.20000
6RESET THE SYSTEM AND ENSURE ALL FANS, FUME HOODS, AND CONSTANT VOLUME BOXES RETURN TO NORMAL OPERATION.0.500000000420000
7NOTIFY BUILDING OCCUPANTS THAT THE TESTS ARE COMPLETE0.15000000040.60000
8FILL OUT MAINTENANCE CHECKLIST AND REPORT DEFICIENCIES0.15000000040.60000
Total Labor-hours/period2.0000.000.000.008.000.000.00
Total Labor-hours/year8.00
Table of Contents

Subpanels up to 600A

Equipment Type:D5015 260 1950
Component:Subpanels up to 600AREF2504482111
PM Components (Task Description)Labor HrsDWMQSA3 YR
1Check With Operating or area personnel for any obvious deficiencies0.04400000000000010.044
2Remove Panel Cover0.41600000000000010.416
3Visually check for discoloration or charred insulation, check for burnt odor0.58300000000000010.583
4Conduct complete infrared scan for hot spots0.29100000000000010.291
5Check all phases, neutral and ground for load balance and presence of current0.58300000000000010.583
6Tighten all lugs, screws and loose connections0.75000000000000010.75
7Vacuum and clean inside of panel0.20000000000000010.2
8Reinstall panel cover0.58300000000000010.583
9Return panel to service0.20000000000000010.2
10Fill out maintenance checklist and report deficiencies0.16700000000000010.167
Total Labor-hours/period3.8170.000.000.000.000.000.003.817
Total Labor-hours/year0.00
Table of Contents

Dist. Panelboard 600A and up

Equipment Type:D5015 210 1950
Component:Distribution Panelboard 600 Amps and LargerREF2504482111
PM Components (Task Description)Labor HrsDWMQSA3 YR
1Check With Operating or area personnel for any obvious deficiencies0.04400000000000010.044
2Remove Panel Cover0.58300000000000010.583
3Visually check for discoloration or charred insulation, check for burnt odor0.58300000000000010.583
4Conduct complete infrared scan for hot spots0.33300000000000010.333
5Check all phases, neutral and ground for load balance and presence of current0.66600000000000010.666
6Tighten all lugs, screws and loose connections0.91600000000000010.916
7Vacuum and clean inside of panel0.25200000000000010.252
8Reinstall panel cover0.75000000000000010.75
9Return panel to service0.29400000000000010.294
10Fill out maintenance checklist and report deficiencies0.16700000000000010.167
Total Labor-hours/period4.5880.000.000.000.000.000.004.588
Total Labor-hours/year0.00

Table of Contents

Air Handler with Humidification

Equipment Type:D3045-110-3950
Component:Air Handler with HumidificationREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with operating or area personnel for deficiencies0.03100000020.062510.0312510.03125
2Check controls and unit for proper operation0.03100000020.062510.0312510.03125
3Check for unusual noise, vibration, leaks0.031000080.2520.062510.0312510.03125
4Clean coils, evaporator drain pan, blower, motor and drain piping, as required0.5000000002110.510.5
5Humidification Units - CHECK UNIT FOR PROPER OPERATION, ADJUST/REPAIR AS REQUIRED0.031000080.2520.062510.0312510.03125
6Humidification Units - CLEAN DISTRIBUTOR, PAN/DRAIN0.25000008220.510.2510.25
7Humidification Units - CHECK HUMIDISTAT, CONTROL VALVE, TRAP0.12500008120.2510.12510.125
8Humidification Unit - CHECK FOR LEAKS/OUTPUT0.031000080.2520.062510.0312510.03125
9Humidification Unit - CLEAN HUMIDIFIER, CHECK VALVE, TRAP, STRAINER0.12500008120.2510.12510.125
10Humidification Unit - CHECK VALVES PACKINGS FOR LEAKAGE0.031000080.24820.06210.03110.031
11Humidification Unit - CHECK SYSTEM OPERATING TEMP0.031000080.24820.06210.03110.031
12Humidification Unit - CHECK SYSTEM OPERATING PRESSURES, WATER STEAM, AIR0.031000080.24820.06210.03110.031
13Humidification Unit - CHANGE FILTERS0.09300000020.18610.09310.093
14Lubricate shaft and motor bearings0.09300000020.18610.09310.093
15Check belts for wear, proper tension and alignment: adjust as necessary0.12500000020.2510.12510.125
16Inspect exterior piping and valves for leaks: tighten connections as required0.09300000020.18610.09310.093
17Check operation and clean dampers, louvers and shutters; lubricate all pivot points and linkages0.09300000020.18610.09310.093
18Clean centrifugal fan0.09300000020.18610.09310.093
19Replace air filters0.25000000020.510.2510.25
20Clean area around equipment0.093000080.74420.18610.09310.093
21Fill out maintenance checklist and report deficiencies0.031000080.2520.062510.0312510.03125
Total Labor-hours/period2.2140.000.006.494.432.212.21
Total Labor-hours/year15.34
Table of Contents

Refrig. Air Dryer

Equipment Type:D3095-500-1950
Component:Refrigerated Air DryerREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with operating or area personnel for deficiencies0.03500000020.0710.03510.035
2Clean and check drain system for proper operation0.5100000021.0210.5110.51
3Clean Condenser coil and fan0.4700000020.9410.4710.47
4Clean Strainer if equipped0.1810000000010.18110.181
5Replace filters if equipped0.177000000000010.177
6Clean area around equipment0.06600000020.13210.06610.066
7Fill out maintenance checklist and report deficiencies0.02200000020.04410.02210.022
Total Labor-hours/period1.4610.000.000.002.211.281.46
Total Labor-hours/year4.95
Table of Contents

Emergency Eye Wash and Showers

Equipment Type:D2013-9x0-0000
Component:Emergency Eye Wash and ShowersREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with operating or area personnel for deficiencies0.03100521.62500000000
2Activate unit long enough to ensure adequeate pressure and volume of water is available and all alarms and lights are in proper working condition if applicable, make sure all orifices are free of abstructions0.12500526.500000000
3Document proper operation on customer provided form as directed0.03100521.62500000000
4Clean area around equipment0.06300523.2500000000
5Fill out maintenance checklist and report deficiencies0.03100521.62500000000
6The above maintenance steps are in compliance with AFI 91-203 15 JUNE 20120.000000000000000
Total Labor-hours/period0.2810.0014.630.000.000.000.00
Total Labor-hours/year14.63
Table of Contents

Glycol Make up

Equipment Type:D3045-500-5000
Component:Glycol make-up stationREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check unit for leaks0.1600000000010.1610.16
2Clean all ventilation openings on pump motor0.2500000000010.2510.25
3Meger pump motor to ensure winding resistance to ground is less than 1.5 MEGOHMS0.2500000000010.2510.25
4Check Glycol Level - Inform facility manager if low0.1600000000010.1610.16
5Fill out maintenance checklist and report deficiencies0.1700000000010.1710.17
Total Labor-hours/period0.9900.000.000.000.000.990.99
Total Labor-hours/year1.98
Table of Contents

Diesel Generator Cat C175

Equipment Type:D5095-210-3951
Component:Diesel Generator Cat C175 - Refer to Cat C175 SEBU8100-12 service manual for detailsREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check With Operating or area personnel for any obvious deficiencies0.17025042.50000000000
2Inspect/Test Control Panel (pg. 84)0.17000508.500000000
3Check Coolant Level (pg. 92)0.17025042.50000000000
4Check Electrical Connections (pg. 97)0.25025062.50000000000
5Check and record Engine Oil Filter Differential Pressure during engine run (pg. 104)0.250005012.500000000
6Inspect Engine Air Cleaner Service Indicator (pg. 102)0.0800050400000000
7Check Engine Oil Level (pg. 104)0.080250200000000000
8Drain Primary fuel system water separator (pg. 113)0.17000508.500000000
9Drain fuel tank water/settlement (pg. 114)0.250005012.500000000
10Test/Record Generator bearing temperature (pg. 116)0.250005012.500000000
11Check Generator Load (pg. 117)0.250005012.500000000
12Check water heater jacket (pg. 124)0.0800050400000000
13Check Power Factor (pg. 132)0.0800050400000000
14Perform walk-around inspection (pg. 139) Check for leaks/loose connections0.250005012.500000000
15Check Battery Charger (pg. 82)0.0800050400000000
16Check Battery Electrolyte Levels (pg. 82)0.17000508.500000000
17Inspect Generator (pg. 115)0.250005012.500000000
18Test Space Heater Oct-Apr Only (pg. 135)0.17000305.100000000
19Stator Winding Temperature Test (pg. 138)0.17000508.500000000
20Check / Record Voltage and Frequency (pg. 139)0.0800050400000000
21Every 300 Hrs. - Engine oil sample - Provide analysis/Report (pg. 105) (WORK ORDER)0.500000000000010.5
22Using OEM personnel, perform quarterly maintenance per CAT service manual1.000000000440000
23Using OEM personnel, perform semi-annual maintenance per CAT service manual1.000000000001100
24Using OEM personnel, perform annual maintenance per CAT service manual1.000000000000000
25Using OEM personnel, perform annual black out test with facility personnel1.000000000000000
26Perform engine runs per PWS guidance1.50000000034.50011.5
27Perform oil change based on oil analysis per PWS guidance (WORK ORDER)0.000000000000000
28Fill out maintenance checklist and report deficiencies0.17020034508.500000000
29Fill out generator forms per PWS guidance0.500004522.5002110.510.5
Total Labor-hours/period10.090201.50142.600.008.501.002.00
Total Labor-hours/year355.60
Table of Contents

Cat C175 Genset Enclosure

Equipment Type:D5000-500-1951
Component:Cat C175 Genset EnclosureREF8211
PM Components (Task Description)Labor HrsMQSA
1Check With Operating or area personnel for any obvious deficiencies0.17081.360010.1710.17
2Wipe down interior perforated screen walls with light coat WD-400.500000010.510.5
3Inspect louvers for proper operation0.330000010.3310.33
4Oil Louver pivot points0.170000010.1710.17
5Check all wall/roof penetrations for leaks, seal as necessary0.330000010.3310.33
6Check exhaust system hardware, tighten connections0.250000010.2510.25
7Check lighting fixtures for proper operation0.17000000010.17
8Sweep interior floors0.25000000010.25
9Provide corrosion control / touch up paint interior and exterior0.50000000010.5
10Check radiator, oil and coolant connections are tight0.330000010.3310.33
11Check electrical conduit connections are tight0.330000010.3310.33
12Inspect Roof0.33000000010.33
13Oil door handle levers0.17000000010.17
14Clean discharge plenum of any debris0.17000000010.17
15Fill out maintenance checklist and report deficiencies0.17081.360010.1710.17
Total Labor-hours/period4.1702.720.002.584.17
Total Labor-hours/year9.47
Table of Contents

Rotary UPS

Equipment Type:D5095 500 1951
Component:Piller Rotary UPSREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check With Operating or area personnel for any obvious deficiencies0.17000447.4800000000
2Clean air inlets and Outlets (VAC ONLY, NO COMPRESSED AIR!)0.2500000112.75000000
3Check for adequate helium0.2500000112.75000000
4Check for unusual noise or sounds0.1700000111.87000000
5Refill grease reservoirs (use mfg. recommended grease only)0.1700000111.87000000
6Using OEM personnel perform semi-annual maintenance per mfg recommendations1.000000000001100
7Using OEM personnel perform annual maintenance per manufacturers recommendations1.000000000000011
8Using OEM personnel assist with annual black out test1.000000000000011
9Fill out maintenance checklist and report deficiencies0.17000447.48111.870010.1710.17
Total Labor-hours/period4.1800.0014.9611.110.001.172.17
Total Labor-hours/year29.41
Table of Contents

3 ph Battery UPS

Equipment Type:D5095 500 1952
Component:3 ph Battery UPS MGE EPS-8000REF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check With Operating or area personnel for any obvious deficiencies0.17000447.4800000000
2Check filters, replace if necessary0.330004414.5200000000
3Check for unusual noise or sounds0.25000441100000000
4Using OEM personnel perform quarterly maintenance per mfg recommendations1.000000000220000
5Using OEM personnel perform semi-annual maintenance per mfg recommendations1.000000000001100
6Using OEM personnel perform annual maintenance per manufacturers recommendations1.000000000000011
7Using OEM personnel assist with annual black out test1.000000000000011
8Fill out maintenance checklist and report deficiencies0.17000447.4800000000
Total Labor-hours/period4.9200.0040.480.002.001.002.00
Total Labor-hours/year45.48
Table of Contents

Paralleling SwGear

Equipment Type:D5015 500 1951
Component:Lakeshore Paralleling SwitchgearREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check With Operating or area personnel for any obvious deficiencies0.17000447.4800000000
2Check for unusual noise or sounds0.330004414.5200000000
3Check air filters at doors and eaves, replace as necessary0.2500000112.75000000
4Check for Leaks0.1700000111.87000000
5Check heater for proper operation0.1700000111.87000000
6Check Door Gaskets0.1700000111.87000000
7Check door panic latch for proper operation0.0800000110.88000000
8Check CMOS battery at touch panel, replace as required0.0800000110.88000000
9Clean touch screen panel w/ lint free cloth0.0800000110.88000000
10Check batteries in switchgear, replace as necessary0.2500000112.75000000
11Using OEM personnel perform annual maintenance per manufacturers recommendations1.000000000000011
12Using OEM personnel assist with annual black out test1.000000000000011
13Fill out maintenance checklist and report deficiencies0.17000447.48111.87000000
Total Labor-hours/period3.9200.0029.4815.620.000.002.00
Total Labor-hours/year47.10
Table of Contents

Load Bank

Equipment Type:D5000-500-1952
Component:Load Bank (refer to manufacturers manual)REF11
PM Components (Task Description)Labor HrsSA
1Check With Operating or area personnel for any obvious deficiencies0.17010.1710.17
2Remove access panels and inspect resistors per mfg instructions0.25010.2510.25
3Inspect for broken ceramic insulators0.17010.1710.17
4Inspect for loose hardware or loose connections, tighten as necessary0.17010.1710.17
5Inspect connections for oxidation or corrosion, clean where required0.17010.1710.17
6Verify airflow switch proper operation0.17010.1710.17
7Inspect magnetic contactors for pitting or corrosion0.08010.0810.08
8Verify contacts move freely and seat properly0.08010.0810.08
9Clean all dirt and debris out of load bank using compressed air0.17010.1710.17
10Inspect wiring for signs of insulation failure0.17010.1710.17
11Replace panels and screens, tighten hardware securely0.25010.2510.25
12Check control panel indicator lights0.08010.0810.08
13Lube fan blower motor if required0.08010.0810.08
14Inspect exhaust hood and screen0.1700010.17
15Fill out maintenance checklist and report deficiencies0.0800010.08
Total Labor-hours/period2.2602.012.26
Total Labor-hours/year4.27
Table of Contents

Dessicant Dryer

Equipment Type:D3095 220 1950
Component:Dessicant DryerREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check With Operating or area personnel for any obvious deficiencies0.166000081.32820.33210.16610.166
2Check function by manually operating automatic condensate drain0.083000080.66420.16610.08310.083
3Check gel indicator, refer to maintenance manual for dew points.0.083000080.66420.16610.08310.083
4Check differential pressure on the pre-filter, should not exceed 10PSI0.16600000020.33210.16610.166
5Replace pre-filter0.250000000000010.25
6Check differential pressure on after-filter, should not exceed 10 PSI0.16600000020.33210.16610.166
7Replace after-filter0.250000000000010.25
8Check the back pressure at silencer behind exhaust valve, should not exceed 5 psid0.16600000020.33210.16610.166
9Check dessicant for impurities, change as necessary0.500000000000010.5
10Check seat O-rings on outlet check valve, replace as necessary0.250000000000010.25
11Check function of 3 port inlet valve by sending control signals0.166000000000010.166
12Check/Tighten electical connections0.1660000000010.16610.166
13Check wiring insulation0.0830000000010.08310.083
14Inspect solenoid valves and control components, replace when necessary0.16600000020.33210.16610.166
15Clean up area around dryer0.083000080.66420.16610.08310.083
16Fill out maintenance checklist and report deficiencies0.166000081.32820.33210.16610.166
Total Labor-hours/period2.9100.000.004.652.491.492.91
Total Labor-hours/year11.54
Table of Contents

Lightning Protection

Equipment Type:D5095-250-1950
Component:Lightning ProtectionREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Coordinate inspection with facility manager0.044000000000010.044
2Check for current meter calibration date - if required0.017000000000010.017
3Verify static bus bars and equipment grounding systems are bonded to the facility ground at ground level or as near as possible0.750000000000010.75
4Inspect cable and ground rods for corrosion, note extent and type of corrosion0.500000000000010.5
5Check condition of all air terminals1.000000000000011
6Inpsect/tighten ground connections as required1.000000000000011
7Locate test point0.500000000000010.5
8Drive reference pins and attach cables0.250000000000010.25
9Check / record ground reading0.250000000000010.25
10Compare to last 6 inspections and determine if there is a deterioration0.170000000000010.17
11Disconnect cables, remove reference pins, clean up area0.170000000000010.17
12Fill out maintenance checklist and report deficiencies0.170000000000010.17
Total Labor-hours/period4.8210.000.000.000.000.004.82
Total Labor-hours/year4.82
Table of Contents

VFD

Equipment Type:D3065-100-1950
Component:Variable Frequency Drives (VFD)REF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check With Operating or area personnel for any obvious deficiencies0.044000000000010.044
2Coordinate VFD shut off with facility personnel0.044000000000010.044
3Check for excessive vibrations, noise, overheating, etc.0.080000000000010.08
4Disconnect Power, wait for DC capacitor discharge, approx 5 mins.0.170000000000010.17
5Check and tighten loose electrical wiring and connections0.170000000000010.17
6Vacuum or use compressed air to remove dust/dirt from heat sink fins0.080000000000010.08
7Clean air box and change filter as needed0.080000000000010.08
8Fill out maintenance checklist and report deficiencies0.170000000000010.17
Total Labor-hours/period0.8380.000.000.000.000.000.84
Total Labor-hours/year0.84
Table of Contents

Elec Monorail Crane to 25 ft

Equipment Type:E1095 123 3950
Component:Elec Monorail Crane to 25 ft. lengthREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with Facility Manager for any related discrepancies0.083000000000010.083
2Check that historical records are being maintained0.166000000000010.166
3Inspect crane foundation and support system, braces, hanger rods, stops. Make adjustments and tighten fasteners as needed0.166000000000010.166
4Inspect monorail and beam0.332000000000010.332
5Inspect limit switches, adjust as needed0.166000000000010.166
6Inspect rail switches for proper function and alignment, adjust as needed0.249000000000010.249
7Inspect control cabinets0.249000000000010.249
8Ensure the hoist disconnect is accessible, identified, and lockable0.044000000000010.044
9Inspect collectors/conductors. Check for pitted or burned contacts0.500000000000010.5
10Test weight capacity of hoisitng equipment within rated capacity in accordance with Chapter 35/AFI 91-203*1.170000000000011.17
11Fill out annual certification paperwork0.167000000000010.167
12Fill out maintenance checklist and report deficiencies0.167000000000010.167
Total Labor-hours/period3.4590.000.000.000.000.003.46
Total Labor-hours/year3.46
*Note: Chapter 35/AFI 91-203, Air Force Consolidated Occupational Safety describes complete Periodic portion of inspection of cranes outside this PMTL.

Table of Contents

Elec Monorail Crane 25-50 ft

Equipment Type:E1095 123 3951
Component:Elec Monorail Crane 25 - 50 ft. lengthREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with Facility Manager for any related discrepancies0.083000000000010.083
2Check that historical records are being maintained0.166000000000010.166
3Inspect crane foundation and support system, braces, hanger rods, stops. Make adjustments and tighten fasteners as needed0.332000000000010.332
4Inspect monorail and beam0.500000000000010.5
5Inspect limit switches, adjust as needed0.166000000000010.166
6Inspect rail switches for proper function and alignment, adjust as needed0.249000000000010.249
7Inspect control cabinets0.249000000000010.249
8Ensure the hoist disconnect is accessible, identified, and lockable0.044000000000010.044
9Inspect collectors/conductors. Check for pitted or burned contacts0.500000000000010.5
10Test weight capacity of hoisitng equipment within rated capacity in accordance with Chapter 35/AFI 91-203*1.170000000000011.17
11Fill out annual certification paperwork0.167000000000010.167
12Fill out maintenance checklist and report deficiencies0.167000000000010.167
Total Labor-hours/period3.7930.000.000.000.000.003.79
Total Labor-hours/year3.79
*Note: Chapter 35/AFI 91-203, Air Force Consolidated Occupational Safety describes complete Periodic portion of inspection of cranes outside this PMTL.

Table of Contents

Elec Monorail Crane 50 ft plus

Equipment Type:E1095 123 3952
Component:Elec Monorail Crane 50 ft. plusREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with Facility Manager for any related discrepancies0.083000000000010.083
2Check that historical records are being maintained0.166000000000010.166
3Inspect crane foundation and support system, braces, hanger rods, stops. Make adjustments and tighten fasteners as needed0.747000000000010.747
4Inspect monorail and beam1.037000000000011.037
5Inspect limit switches, adjust as needed0.166000000000010.166
6Inspect rail switches for proper function and alignment, adjust as needed0.249000000000010.249
7Inspect control cabinets0.249000000000010.249
8Ensure the hoist disconnect is accessible, identified, and lockable0.044000000000010.044
9Inspect collectors/conductors. Check for pitted or burned contacts0.500000000000010.5
10Test weight capacity of hoisitng equipment within rated capacity in accordance with Chapter 35/AFI 91-203*1.170000000000011.17
11Fill out annual certification paperwork0.167000000000010.167
12Fill out maintenance checklist and report deficiencies0.167000000000010.167
Total Labor-hours/period4.7450.000.000.000.000.004.75
Total Labor-hours/year4.75
*Note: Chapter 35/AFI 91-203, Air Force Consolidated Occupational Safety describes complete Periodic portion of inspection of cranes outside this PMTL.

Table of Contents

Manual Monorail up to 25ft

Equipment Type:E1095 123 3953
Component:Manual Monorail Crane (to 25' length)REF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with Facility Manager for any related discrepancies0.083000000000010.083
2Check that historical records are being maintained0.166000000000010.166
3Inspect crane foundation and support system, braces, hanger rods, stops. Make adjustments and tighten fasteners as needed0.166000000000010.166
4Inspect monorail and beam0.332000000000010.332
5Inspect rail switches for proper function and alignment, adjust as needed0.249000000000010.249
6Test weight capacity of hoisitng equipment within rated capacity in accordance with Chapter 35/AFI 91-203*1.170000000000011.17
7Fill out annual certification paperwork0.167000000000010.167
8Fill out maintenance checklist and report deficiencies0.167000000000010.167
Total Labor-hours/period2.5000.000.000.000.000.002.50
Total Labor-hours/year2.50
*Note: Chapter 35/AFI 91-203, Air Force Consolidated Occupational Safety describes complete Periodic portion of inspection of cranes outside this PMTL.

Table of Contents

Manual Monorail 25-50ft

Equipment Type:E1095 123 3954
Component:Manual Monorail Crane (25' - 50' length)REF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with Facility Manager for any related discrepancies0.083000000000010.083
2Check that historical records are being maintained0.166000000000010.166
3Inspect crane foundation and support system, braces, hanger rods, stops. Make adjustments and tighten fasteners as needed0.332000000000010.332
4Inspect monorail and beam0.500000000000010.5
5Inspect rail switches for proper function and alignment, adjust as needed0.249000000000010.249
6Test weight capacity of hoisitng equipment within rated capacity in accordance with Chapter 35/AFI 91-203*1.170000000000011.17
7Fill out annual certification paperwork0.167000000000010.167
8Fill out maintenance checklist and report deficiencies0.167000000000010.167
Total Labor-hours/period2.8340.000.000.000.000.002.83
Total Labor-hours/year2.83
*Note: Chapter 35/AFI 91-203, Air Force Consolidated Occupational Safety describes complete Periodic portion of inspection of cranes outside this PMTL.

Table of Contents

Manual Monorail over 50ft

Equipment Type:E1095 123 3955
Component:Manual Monorail Crane (Over 50' length)REF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with Facility Manager for any related discrepancies0.083000000000010.083
2Check that historical records are being maintained0.166000000000010.166
3Inspect crane foundation and support system, braces, hanger rods, stops. Make adjustments and tighten fasteners as needed0.747000000000010.747
4Inspect monorail and beam1.037000000000011.037
5Inspect rail switches for proper function and alignment, adjust as needed0.249000000000010.249
6Test weight capacity of hoisitng equipment within rated capacity in accordance with Chapter 35/AFI 91-203*1.170000000000011.17
7Fill out annual certification paperwork0.167000000000010.167
8Fill out maintenance checklist and report deficiencies0.167000000000010.167
Total Labor-hours/period3.7860.000.000.000.000.003.79
Total Labor-hours/year3.79
*Note: Chapter 35/AFI 91-203, Air Force Consolidated Occupational Safety describes complete Periodic portion of inspection of cranes outside this PMTL.

Table of Contents

Control Dampers

Equipment Type:B2013-330-1040
Component:Control DampersREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check with Facility Manager for any related discrepancies0.083000000000010.083
2Observe damper motors and actuators through an operating cycle to check for defects or binding. All mounting bolts must be securely fastened.0.080000000000010.08
3Linkages from actuators should be adjusted to insure blades of damper fully open or close within the stroke or travel of the actuator arm.0.170000000000010.17
4Blades should be checked in closed position to be sure all close tightly. If necessary, adjustments should be made to damper linkage or linkages to close any partially open blades0.080000000000010.08
5Damaged blades should be replaced. Dirt, soot lint, etc. should be removed especially around operating parts.0.170000000000010.17
6Check blade edge and side seals. Replace where necessary.0.030000000000010.03
7Check pins, straps, bushings (bearings) for wear, rust or corrosion. Replace as required.0.080000000000010.08
8Lubricate all mechanisms and moving parts with a moli-spray oil or similar graphite based dry lubricant, as regular lubricating oil will attract dirt.0.080000000000010.08
9Caulking, where used to make damper frames tight to structure, should be checked and repaired as needed.0.020000000000010.02
10Fill out maintenance checklist and report deficiencies0.170000000000010.17
Total Labor-hours/period0.9630.000.000.000.000.000.96
Total Labor-hours/year0.96

Table of Contents

Template

Equipment Type:D5015 260 1950
Component:Panelboards up to 600AREF250448211
PM Components (Task Description)Labor HrsDWMQSA
1Check With Operating or area personnel for any obvious deficiencies0.000000000000000
2Remove Panel Cover0.000000000000000
3Visually check for discoloration or charred insulation, check for burnt odor0.000000000000000
4Conduct complete infrared scan for hot spots0.000000000000000
5Check all phases, neutral and ground for load balance and presence of current0.000000000000000
6Tighten all lugs, screws and loose connections0.000000000000000
7Vacuum and clean inside of panel0.000000000000000
8Reinstall panel cover0.000000000000000
9Return panel to service0.000000000000000
10Fill out maintenance checklist and report deficiencies0.000000000000000
Total Labor-hours/period0.0000.000.000.000.000.000.00
Total Labor-hours/year0.00