Atch_7 _Pricing_Worksheets.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) Federal contract opportunity
- Solicitation number
- FA8601-14-R-0007
About this file
Draft 2 Atch 7 Pricing Worksheets
View the file
Other files for this federal contract opportunity
Show all 50
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Non-DBA Labor Rate Matrix
BINDING NOT TO EXCEED HOURLY LABOR RATE MATRIX
FOR
NON-DAVIS BACON ACT (DBA) LABOR CATEGORIES
REQUIRED BY THE STATEMENT OF WORK (SOW)
Note: Offeror is required to complete the following:
All Blue Cells All other cells will self-populate
| Required Non-DBA Labor Category | |||||||
| (Reference SOW Paragraph 3) | Ordering Period | ||||||
| Hourly Rates for Ordering Period 1 | Hourly Rates for Ordering Period 2 | Hourly Rates for Ordering Period 3 | Hourly Rates for Ordering Period 4 | Hourly Rates for Ordering Period 5 | *Hourly Rates for Potential |
6-Month Option Extension
| Contract Manager (CM) | $ - 0 |
| Project Superintendent (PS) | $ - 0 |
| Design Quality Control Manager (DQCM) | $ - 0 |
| Contract Quality Control Manager (CQCM) | $ - 0 |
| Site and Health Officer (SSHO) | $ - 0 |
| Environmental Manager (EM) | $ - 0 |
| * Offerors are to assume (for evaluation purposes only) the total 6-month extension shall be incorporated after Ordering Period 5 has expired. However, IAW FAR 52.217-8, Extension of Services (up to six months), the Government reserves the right to exercise this clause during any ordering period. If the clause is exercised, pricing will be determined at the time of exercise, based upon current unit pricing. |
FA8601-14-R-0007
Multiple Award Construction Contract (MACC)
Attachment 7 For Evaluation and Award Purposes Binding NTE Non-DBA Labor Rate Matrix
TO Pricing for Seed Project
MACC TASK ORDER PRICING WORKSHEET
FOR SEED PROJECT
(FOR EVALUATION AND AWARD PURPOSES)
Note: Offeror is required to complete the following:
All Blue Cells All other cells will self-populate.
| PROJECT NUMBER | 071930 (MACC Seed Project) | ||||
| MAGNITUDE OF CONSTRUCTION (Per FAR 36.204) | Between $100,000 and $250,000 | ||||
| PROJECT TITLE/DESCRIPTION | Upgrade Fire Alarm Systems 20255 - To furnish all materials and perform all labor required to Upgrade Fire Alarm Systems for Facility 20255, including associated architectural, civil, structural, mechanical, plumbing, electrical and miscellaneous work as shown on the project drawings and described in the specifications. | ||||
| FACILITY NUMBER | 20255 | ||||
| PERIOD OF PERFORMANCE | 180 | Calendar Days | |||
| SECTION I | |||||
| Description | Qty | U/I | Unit Price | Total | |
| Davis-Bacon Act (DBA) Labor, Material, Subcontractor, Equipment Rental, etc (Direct Costs associated with the performance of this project other than those listed below) | 1 | Project | $ - 0 | ||
| SECTION II | |||||
| Non-DBA Labor Applicable to this Project (Reference SOW Paragraph 3) | |||||
| Description | Qty | U/I | Unit Price | Total | |
| Contract Manager (CM) | Hour | $ - 0 | $ - 0 | ||
| Project Superintendent (PS) | Hour | $ - 0 | $ - 0 | ||
| Design Quality Control Manager (DQCM) | Hour | $ - 0 | $ - 0 | ||
| Contract Quality Control Manager (CQCM) | Hour | $ - 0 | $ - 0 | ||
| Site and Health Officer (SSHO) | Hour | $ - 0 | $ - 0 | ||
| Environmental Manager (EM) | Hour | $ - 0 | $ - 0 | ||
| Section II Total | $ - 0 | ||||
| Subtotal of Section I & II | $ - 0 | ||||
| Indirect Markup Factor | 0.0% | $ - 0 | |||
| Task Order Total | |||||
| (For Evaluation and Award Purposes) | $ - 0 |
Contractor Certification: By submission of this proposal, I hereby certify that the hourly rates for the professional labor categories cited above as well as the Indirect Markup Factor do not exceed the rates proposed and incorporated into the basic contract.
Signature: __________________________________________
Title: ______________________________________________
Date:_______________________________________________
FA8601-14-R-0007
Multiple Award Construction Contract (MACC)
| Attachment 7 | For Evaluation & Award of |
| Seed Project Purposes | Task Order Pricing for Seed Project |
TO Pricing for Sample Project
MACC TASK ORDER PRICING WORKSHEET
FOR SAMPLE PROJECT
(FOR EVALUATION PURPOSES ONLY)
Note: Offeror is required to complete the following:
All Blue Cells All other cells will self-populate
| PROJECT NUMBER | 000077 (MACC Sample Project) | ||||
| MAGNITUDE OF CONSTRUCTION (Per FAR 36.204) | Between $500,000 and $1,000,000 | ||||
| PROJECT TITLE/DESCRIPTION | Renovate/Reconfigure PAX Terminal - to furnish all materials and equipment and to perform all labor and secure all permits required to Renovate/ Reconfigure PAX Terminal, Facility 30206 including all required demolition, site preparation, civil, architectural, structural, mechanical, electrical, and miscellaneous associated incidental work at adjacent areas, as shown on the project drawings and described in the specifications. | ||||
| FACILITY NUMBER | 30206 | ||||
| PERIOD OF PERFORMANCE | 240 | Calendar Days | |||
| SECTION I | |||||
| Description | Qty | U/I | Unit Price | Total | |
| Davis-Bacon Act (DBA) Labor, Material, Subcontractor, Equipment Rental, etc (Direct Costs associated with the performance of this project other than those listed below) | 1 | Project | $ - 0 | ||
| Section II | |||||
| Non-DBA Labor Applicable to this Project (Reference SOW Paragraph 3) | |||||
| Description | Qty | U/I | Unit Price | Total | |
| Contract Manager (CM) | Hour | $ - 0 | $ - 0 | ||
| Project Superintendent (PS) | Hour | $ - 0 | $ - 0 | ||
| Design Quality Control Manager (DQCM) | Hour | $ - 0 | $ - 0 | ||
| Contract Quality Control Manager (CQCM) | Hour | $ - 0 | $ - 0 | ||
| Site and Health Officer (SSHO) | Hour | $ - 0 | $ - 0 | ||
| Environmental Manager (EM) | Hour | $ - 0 | $ - 0 | ||
| Section II Total | $ - 0 | ||||
| Subtotal of Section I & II | $ - 0 | ||||
| Indirect Markup Factor | 0.0% | $ - 0 | |||
| Task Order Total | |||||
| (For Evaluation Purposes Only) | $ - 0 |
Contractor Certification: By submission of this proposal, I hereby certify that the hourly rates for the professional labor categories cited above as well as the Indirect Markup Factor do not exceed the rates proposed and incorporated into the basic contract.
Signature: __________________________________________
Title: ______________________________________________
Date:_______________________________________________
FA8601-14-R-0007
Multiple Award Construction Contract (MACC)
Attachment 7 For Evaluation Purposes Only Task Order Pricing for Sample Project
Non-DBA Pricing Scenario
NON-DBA PRICING SCENARIO
(FOR EVALUATION PURPOSES ONLY)
NOTE: The offeror is NOT to manually complete this worksheet. The Binding Non-DBA Labor Rates for each ordering period column will self-populate from the rates entered by the offeror on the Non-DBA Labor Rate Matrix. The Total column has been preformatted to automatically total.
Ordering Period 1 Non-DBA Labor Applicable to this Scenario (Reference SOW Paragraph 3)
| Required Non-DBA Labor Category | Qty* | U/I | Binding Non-DBA Labor Rate from Matrix (Ordering Period 1) | Total | |
| Contract Manager (CM) | 420 | Hour | $ - 0 | $ - 0 | |
| Project Superintendent (PS) | 1040 | Hour | $ - 0 | $ - 0 | |
| Design Quality Control Manager (DQCM) | 80 | Hour | $ - 0 | $ - 0 | |
| Contract Quality Control Manager (CQCM) | 580 | Hour | $ - 0 | $ - 0 | |
| Site and Health Officer (SSHO) | 360 | Hour | $ - 0 | $ - 0 | |
| Environmental Manager (EM) | 280 | Hour | $ - 0 | $ - 0 | |
| Non-DBA Labor Total for Ordering Period 1 | |||||
| (FOR EVALUATION PURPOSES ONLY) | $ - 0 |
*Qty (e.g., number of hours per labor category) are set numbers provided by the Government for the purposes of this evaluation only.
Ordering Period 2 Non-DBA Labor Applicable to this Scenario (Reference SOW Paragraph 3)
| Required Non-DBA Labor Category | Qty* | U/I | Binding Non-DBA Labor Rate from Matrix (Ordering Period 2) | Total | |
| Contract Manager (CM) | 420 | Hour | $ - 0 | $ - 0 | |
| Project Superintendent (PS) | 1040 | Hour | $ - 0 | $ - 0 | |
| Design Quality Control Manager (DQCM) | 80 | Hour | $ - 0 | $ - 0 | |
| Contract Quality Control Manager (CQCM) | 580 | Hour | $ - 0 | $ - 0 | |
| Site and Health Officer (SSHO) | 360 | Hour | $ - 0 | $ - 0 | |
| Environmental Manager (EM) | 280 | Hour | $ - 0 | $ - 0 | |
| Non-DBA Labor Total for Ordering Period 2 | |||||
| (FOR EVALUATION PURPOSES ONLY) | $ - 0 |
*Qty (e.g., number of hours per labor category) are set numbers provided by the Government for the purposes of this evaluation only.
Ordering Period 3 Non-DBA Labor Applicable to this Scenario (Reference SOW Paragraph 3)
| Required Non-DBA Labor Category | Qty* | U/I | Binding Non-DBA Labor Rate from Matrix (Ordering Period 3) | Total | |
| Contract Manager (CM) | 420 | Hour | $ - 0 | $ - 0 | |
| Project Superintendent (PS) | 1040 | Hour | $ - 0 | $ - 0 | |
| Design Quality Control Manager (DQCM) | 80 | Hour | $ - 0 | $ - 0 | |
| Contract Quality Control Manager (CQCM) | 580 | Hour | $ - 0 | $ - 0 | |
| Site and Health Officer (SSHO) | 360 | Hour | $ - 0 | $ - 0 | |
| Environmental Manager (EM) | 280 | Hour | $ - 0 | $ - 0 | |
| Non-DBA Labor Total for Ordering Period 3 | |||||
| (FOR EVALUATION PURPOSES ONLY) | $ - 0 |
*Qty (e.g., number of hours per labor category) are set numbers provided by the Government for the purposes of this evaluation only.
Ordering Period 4 Non-DBA Labor Applicable to this Scenario (Reference SOW Paragraph 3)
| Required Non-DBA Labor Category | Qty* | U/I | Binding Non-DBA Labor Rate from Matrix (Ordering Period 4) | Total | |
| Contract Manager (CM) | 420 | Hour | $ - 0 | $ - 0 | |
| Project Superintendent (PS) | 1040 | Hour | $ - 0 | $ - 0 | |
| Design Quality Control Manager (DQCM) | 80 | Hour | $ - 0 | $ - 0 | |
| Contract Quality Control Manager (CQCM) | 580 | Hour | $ - 0 | $ - 0 | |
| Site and Health Officer (SSHO) | 360 | Hour | $ - 0 | $ - 0 | |
| Environmental Manager (EM) | 280 | Hour | $ - 0 | $ - 0 | |
| Non-DBA Labor Total for Ordering Period 4 | |||||
| (FOR EVALUATION PURPOSES ONLY) | $ - 0 |
*Qty (e.g., number of hours per labor category) are set numbers provided by the Government for the purposes of this evaluation only.
Ordering Period 5 Non-DBA Labor Applicable to this Scenario (Reference SOW Paragraph 3)
| Required Non-DBA Labor Category | Qty* | U/I | Binding Non-DBA Labor Rate from Matrix (Ordering Period 5) | Total | |
| Contract Manager (CM) | 420 | Hour | $ - 0 | $ - 0 | |
| Project Superintendent (PS) | 1040 | Hour | $ - 0 | $ - 0 | |
| Design Quality Control Manager (DQCM) | 80 | Hour | $ - 0 | $ - 0 | |
| Contract Quality Control Manager (CQCM) | 580 | Hour | $ - 0 | $ - 0 | |
| Site and Health Officer (SSHO) | 360 | Hour | $ - 0 | $ - 0 | |
| Environmental Manager (EM) | 280 | Hour | $ - 0 | $ - 0 | |
| Non-DBA Labor Total for Ordering Period 5 | |||||
| (FOR EVALUATION PURPOSES ONLY) | $ - 0 |
*Qty (e.g., number of hours per labor category) are set numbers provided by the Government for the purposes of this evaluation only.
Potential 6-Month Option Extension Non-DBA Labor Applicable to this Scenario (Reference SOW Paragraph 3)
| Required Non-DBA Labor Category | Qty* | U/I | Binding Non-DBA Labor Rate from Matrix (Potential 6-Month Option Extension) | Total | |
| Contract Manager (CM) | 420 | Hour | $ - 0 | $ - 0 | |
| Project Superintendent (PS) | 1040 | Hour | $ - 0 | $ - 0 | |
| Design Quality Control Manager (DQCM) | 80 | Hour | $ - 0 | $ - 0 | |
| Contract Quality Control Manager (CQCM) | 580 | Hour | $ - 0 | $ - 0 | |
| Site and Health Officer (SSHO) | 360 | Hour | $ - 0 | $ - 0 | |
| Environmental Manager (EM) | 280 | Hour | $ - 0 | $ - 0 | |
| Non-DBA Labor Total for Potential 6-Month Option Extension | |||||
| (FOR EVALUATION PURPOSES ONLY) | $ - 0 |
*Qty (e.g., number of hours per labor category) are set numbers provided by the Government for the purposes of this evaluation only.
Non-DBA Labor Total for:
Ordering Period 1 + Ordering Period 2 + Ordering Period 3 + Ordering Period 4 + Ordering Period 5 + Potential 6-Month Option Extension
(FOR EVALUATION PURPOSES ONLY) $ - 0
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
Attachment 7 For Evaluation Purposes Only Non-DBA Pricing Scenario
Total Evaluated Price Calc
TOTAL EVALUATED PRICE (TEP) CALCULATION FOR THE
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
Note: Offeror is required to complete the following cells on this worksheet:
All Blue Cells. Additionally, the offeror shall provide a separate detailed summary of how they arrived at their NTE Indirect Markup Factor Rate. This information must be provided in Volume III, Price/Contract Documentation - not as part of this matrix attachment.
All other cells will self-populate.
| Offeror's Name: | |||||
| Product or Service Description | Government Provided Estimate | Offeror's Proposed NTE Indirect Markup Factor Rate (Binding) | Total Price Element | ||
| CLIN 0001 - Ordering Period 1 Cost Estimate | $ 18,184,000 | X | $ - 0 | ||
| CLIN 0002 - Ordering Period 2 Cost Estimate | $ 18,184,000 | X | $ - 0 | ||
| CLIN 0003 - Ordering Period 3 Cost Estimate | $ 18,184,000 | X | $ - 0 | ||
| CLIN 0004 - Ordering Period 4 Cost Estimate | $ 18,184,000 | X | $ - 0 | ||
| CLIN 0005 - Ordering Period 5 Estimate | $ 18,184,000 | X | $ - 0 | ||
| CLIN 0006 - | |||||
| Potential 6-Month Option Extension Cost Estimate | $ 9,080,000 | X | $ - 0 | ||
| Subtotal: | $ - 0 | ||||
| Offeror's Proposed Price for Seed Project | |||||
| (For Award and Evaluation Purposes) | $ - 0 | ||||
| Offeror's Proposed Price for Sample Project | |||||
| (For Evaluation Purposes Only) | $ - 0 | ||||
| Offeror's Proposed Price for Non-DBA Pricing Scenario for Ordering Periods 1, 2, 3, 4, 5 and the Potential 6-Month option Extension (Binding Rates - But For Evaluation Purposes Only) | $ - 0 | ||||
| Total Evaluated Price: | $ - 0 |
Multiple Award Construction Contract (MACC)
Attachment 7 For Evaluation and Award Purposes Total Price Evaluation (TEP) Calculation
File details come from the government source that posted it. Updated .