Question_ _Response__83_-_85.pdf
PDF 266 KB Posted
- Attached to
- MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) Federal contract opportunity
- Solicitation number
- FA8601-14-R-0007
About this file
Vendor Questions Government Responses - RFIs 83 - 85
View the file
Other files for this federal contract opportunity
Show all 50
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-AWARD REQUESTS FOR INFORMATION (RFI)
VENDOR QUESTIONS/GOVERNMENT RESPONSES
#83 - 85
FINAL
REQUEST FOR PROPOSAL (RFP)
FA8601-14-R-0007
Multiple Award Construction Contract (MACC)
28 JULY 2014
Question #83
Seed Project #071930 - Has an ACM survey been completed for the areas affected?
Government Response: An ACM survey has not been conducted; however, per amendment 0005 contractor shall assume mastic and tiles in the area indicated are ACM. Additionally, per paragraph 1.D.1 of the Seed Project Statement of Work, the contractor shall be responsible for all surveys and shall incorporate the results including an environmental survey into the design.
Question #84
Seed Project #071930 - Is there “as is” drawings for the existing electric in the areas affected?
Government Response: The available record drawings have all been made available via Addendum 001 to the Seed Project (incorporated by Amendment 0001).
Question #85
Seed Project #071930 - Will there be an amendment addressing the finishing of gypsum surfaces around windows and at wall returns?
Government Response: No. This is a design-build task; designer shall be responsible for addressing these details.