MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) Federal contract opportunity
Solicitation number
FA8601-14-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Atch 16 Seed Project Addendum 002

View the file

Other files for this federal contract opportunity

Other files attached to MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
Delivery_of_Proposals.pdf PDF
FA8601-14-R-0007-0005.pdf PDF
Question_ _Response__62_-_82.pdf PDF
FA8601-14-R-0007-0004.pdf PDF
NOTICE_TO_OFFERORS.pdf PDF
Atch_5 _Wage_Decision_OH140016_Mod_16 _18_July_14.pdf PDF
FA8601-14-R-0007-0003.pdf PDF
17_July_2014_Site_Visit_Information.pdf PDF
Rules_of_Engagement.pdf PDF
MACC_17_July_2014_Sign-In_Sheet.pdf PDF
Atch_15 _Sample_Proj_Drawing_A100 _Addendum_002.pdf PDF
FA8601-14-R-0007-0002.pdf PDF
Atch_12 _20255_02.dwg DWG drawing
Atch_5 _DBA_Wage_Decision_OH140016 _Modification_15_4_July_14.pdf PDF
Atch_12 _20255_01.dwg DWG drawing
Question_ _Response__10_-_59_-_Final_-_14_Jul_14.pdf PDF
Rules_of_Engagement.pdf PDF
Question_ _Response__9.pdf PDF
Atch_1 _Appendix_F_Activity_Hazard_Analysis.pdf PDF
Atch_1 _Appendix_I_AF_Sustainable_Design_and_Development_Guide.pdf PDF
Atch_1 _Appendix_G_AF_Form_3000_Material_Submittal.pdf PDF
Atch_1 _Appendix_J_AF_3064_Construction_Progress_Schedule.pdf PDF
Atch_1 _Appendix_H_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch_1 _Appendix_K_AF_Form_103_Dig_Permit.pdf PDF
Atch_8 _Sample_Proj_Specs_-_11_Mar_11.pdf PDF
Atch_4 _Seed_Project_SOW_-_10_Oct_13.pdf PDF
Atch_3 _(Atch_1 _App_C)_WPAFB_Master_Specs_-_6_May_14.pdf PDF
Atch_6 _Section_L _PZIOC_L-004_Atch_1_Solicitation-Cross_Ref_Matrix.docx DOCX document
Atch_1 _Appendix_E_2008-EM-385-1-1_Safety_and_Health_Manual.pdf PDF
Atch_1 _Appendix_B_AF_Form_3065_Contract_Progress_Report.pdf PDF
Atch_1 _Appendix_D_Tobacco_Use_Policy.pdf PDF
Questions_ _Responses__7-8.pdf PDF
Atch_1 _Appendix_H_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch_1 _MAC_SOW_-_Revised_21_Feb_14.pdf PDF
Atch_1 _Appendix_I_AF_Sustainable_Design_and_Development_Guide.pdf PDF
Atch_1 _Appendix_G_AF_Form_3000_Material_Submittal.pdf PDF
Atch_8 _Sample_Proj_Specs_-_11_Mar_11.pdf PDF
Atch_1 _Appendix_F_Activity_Hazard_Analysis.pdf PDF
Atch_1 _Appendix_J_AF_3064_Construction_Progress_Schedule.pdf PDF
Atch_5 _-_DBA_Wage_Decision _OH14016_2_May_14_-_Notepad.pdf PDF
Delay_in_Issuance_of_MACC_RFP_-_13_Dec_13.pdf PDF
Question_ _Response__3.pdf PDF
Question_ _Response__2.pdf PDF
Question_ _Response__1.docx DOCX document
Atch_4 _Seed_Project_071930.pdf PDF
DRAFT_FA8601-14-R-0007.pdf PDF
Atch_5 _DBA_WD_OH130016_Mod_30_1_Nov_13.pdf PDF
Atch_3 _WPAFB_Master_Specifications_-_14_Aug_13.pdf PDF
Atch_6 _Section_L _PZIOC_L-004_Attachment_1_Solicitation_Cross-Reference_Matrix.pdf PDF
Atch_1 _MACC_SOW_-_14_Aug_13.pdf PDF
Show all 50

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Template Version 19 Aug 2011

ADDENDUM NUMBER 002

TO

STATEMENT OF WORK

FOR

REPAIR FIRE ALARM SYS

FACILITY 20255

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

PROJECT NUMBER: ZHTV 071930

1. The statement of work is hereby amended in part as follows:

A. Revise the Scope of Work to include the following paragraph, “1.5). See attachment 4 for the location of wall and ceiling tile and associated mastic, which are assumed to be asbestos containing materials. Contractor shall abate wall and ceiling finishes and mastic in area indicated. Abate all ACM in accordance with WPAFB Master Specification 02 08 10 ‘Removal and

Disposal of Asbestos Containing Materials (WPAFB).’ Provide new metal furring, and gypsum wall board where ACM tiles have been removed from walls. Install new acoustic ceiling tiles directly to concrete roof deck and provide new suspended acoustic ceiling in area indicated in attachment 4. Paint all new exposed drywall with 1 primer coat and two top coats.”

B. Revise the Scope of Work to include the following paragraph, “1.6). Building

255 will be sparsely occupied for the duration of the construction. Work resulting in the temporary displacement of any workers shall be coordinated a minimum of two weeks in advance.”

C. Include attachment 4 – “Building 255 Assumed ACM”.

2. This Addendum Number 002 hereby forms and is made a part of the above named project drawings and specifications.

24 July 2014