Solicitation #: FA8601-13-R-0052
ZHTV 11-0002, RENOVATE RESTROOMS F/20016
Pre-Award RFI-1
Q1. Please confirm if there is any abatement needed in the Restroom Renovation project #11-0002.
The plans have no reference except from the general and environmental notation.
Response: The contractor is responsible for the scope of work indicated in the drawings and specifications. For reference see the specification section exerpts below. Abatement of hazardous materials discovered during demolition and not identified in the drawings or specifications shall be addressed at that time.
Refer to Section 01 02 20 - General Environmental Protection paragraph 3.2/B:
B. The contractor is responsible for having a competent person on-site who is capable of identifying existing asbestos hazards in the workplace as specified in 29 CFR 1926.32(f). If the contractor encounters suspected asbestos containing materials not covered by the drawings or specifications,the contractor shall immediately notify the contracting officer.
and
Refer to Section 02 09 00 - Removal And Disposal Of Lead Containing Materials Including Lead-Based Paint paragraph 1.05.10:
1.05.10 LBP is paint with any detectable amount of lead. For OSHA purposes, all painted surfaces on WPAFB are to be considered LBP unless laboratory analysis proves otherwise. For EPA (RCRA) purposes, LBP collected separately from construction debris must be sampled and analyzed for proper characterization for disposal.