UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
NO SCALE
LOWER LEVEL FACILITY FLOOR PLAN - KEY1
G2
G2
N
A1
A1
1,2,3
1,2,3
DEMO/CONST
REF.CEI.
DEMO/CONST
REF.CEI.
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
WOMEN
MEN
WOMEN
MEN
DESIGNED RC/SK DRAWN RC/SK/KL CHECKED SK
COORDINATOR: SK DESIGN CHIEF: AM ENGINEERING CHIEF: MB
FACILITY 20016
PROJECT NO. ZHTV 110002
LOWER LEVEL KEY PLAN
DATE 05 JULY 11
DN
DN
DN
DN
DN
BASEMENT
ROOF
BLDG 20011
DN
G3
NO SCALE
G3
MAIN LEVEL FACILITY FLOOR PLAN - KEY
N
A2
A5
A4
1,2,3
1,2,3
A3
1,2
REF.CEI.
DEMO/CONST
DEMO/CONST
REF.CEI.
DEMO/CONST
REF.CEI.
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DRAWNDESIGNED CHECKED
COORDINATOR: SK DESIGN CHIEF: AM ENGINEERING CHIEF: MB
DESIGNED RC/SK DRAWN RC/SK/KL CHECKED SK
FACILITY 20016
PROJECT NO. ZHTV 110002
MAIN LEVEL KEY PLAN
DATE 05 JULY 11
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKED
P1
VESTIBULE
MEN’S
RESTROOM
WOMEN’S
RESTROOM
VESTIBULE
VESTIBULE
MEN’S
RESTROOM
WOMEN’S
RESTROOM
VESTIBULE
MARK FIXTURE NAME TRAP VENT HW CW REMARKS
WATER CLOSET
URINAL
LAVATORY
SERVICE SINK
4" 2"
2" 2" 1"
1-1/2" �"1-1/4"
3"
P-2
P-3
P-5
EXISTING TO
REMAIN
1 �" 1 �"
1"
�"�"2"
FLOOR DRAIN 3"
WALL HUNG. REFER
TO SPECIFICATIONS.
WALL HUNG. REFER
TO SPECIFICATIONS.
PLUMBING FIXTURE/EQUIP. SCHEDULE
CONNECTION POINT - NEW
TO EXISTING
CHECK VALVE
SHOCK ABSORBER. LETTER DESIGNATES
P.D.I. UNIT RATING
CLEAN OUT
DOMESTIC HOT WATER
DOMESTIC COLD WATER
VENT THRU ROOF
DOMESTIC HOT WATER RETURN
VENT
SANITARY
DCW
DHW
DHWR
SAN
VTR
V
CO
LEGEND
EXISTING DOMESTIC COLD WATER
PIPING
NEW DOMESTIC COLD WATER
PIPING
NEW DOMESTIC HOT WATER
PIPING
EXISTING SANITARY PIPING
NEW SANITARY PIPING
NEW VENT PIPING
WALL CLEAN OUTWCO
"A"
1.
2.
PLUMBING NOTES
COORDINATE WITH WORK OF OTHER TRADES AND CONSTRUCTION
MANAGER TO AVOID INTERFERENCES BEFORE BEGINNING WORK.
FIELD VERIFY EXISTING CONDITIONS.
INSULATE ALL NEW DOMESTIC HOT & COLD WATER PIPING AND
FITTINGS. REFER TO SPECIFICATIONS.
PROVIDE PIPE SLEEVES WHERE NEW PIPING PENETRATES NEW/EXISTING
WALLS.
3.
4.
P-2
P-2
P-2
P-2
P-2
P-2
P-3
P-3
P-3
P-3
P-3
P-3
029.A 028.A
079.A
078.A
N
0 61 3
SCALE: �" = 1’-0"
N
0 61 3
SCALE: �" = 1’-0"
P-3
P-3
P-3
P-3
P-3
P-3
P-2 P-2 P-2 P-2 P-2 P-2
P-3 P-3 P-3 P-3 P-3 P-3 P-3
P-3 P-3 P-3 P-3 P-3 P-3
(APPLIES TO SHT’S P1 THRU P6)
FD-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
P-1P-1P-1P-1
P-1
REFER TO STACK & RISER DETAILS SHTS. P3 THRU P6 FOR ADDITIONAL
PIPING, VALVES & FITTINGS NOT SHOWN ON PLAN VIEWS.
5.
DHWR
DHW
D H
W R
D H
W D
C W
DCW
P-4A
P-4B SERVICE SINK 3" 2" �" �"
WALL HUNG. REFER
TO SPECIFICATIONS.
FLOOR MOUNTED. REFER
TO SPECIFICATIONS.
WALL HUNG. REFER
TO SPECIFICATIONS.
CODED NOTES
PROVIDE NEW PLUMBING FIXTURES AS SHOWN, INCLUDING NEW
SANITARY, VENT, AND DOMESTIC HOT & COLD WATER PIPING,
VALVES & FITTINGS. REFER TO NEW STACK & RISER DIAGRAMS
SHEET P4. PROVIDE FIXTURE SHUT-OFF VALVES, LAVATORY
TRAPS, ETC. PER SPECIFICATION 22 00 00.
1 1
4" SAN DOWN THRU SLAB.
4" VTR
4" VENT UP TO FIRST FLOOR AND 5" SAN DOWN FROM FIRST FLOOR.
WCO
WCO
CO
CO
CO
CO CO
RESTROOMS 78 &79 PLUMBING PLAN
RESTROOMS 28 & 29 PLUMBING PLAN
GATE VALVE
EXITING DOMESTIC HOT WATER
PIPING
EXISTING VENT PIPING
P-5
P-5
FACILITY 20016
PROJECT NO. ZHTV 110002
BASEMENT PLUMBING PLAN
JP JP
FD-1
FD-1
FD-1 FD-1
ADA ELECT.
WATER COOLER
APPROXIMATELY 8’ A.F.
APPROXIMATELY 8’ A.F.
A.F. ABOVE FLOOR
ABOVE SUSP.
CEILING
ABOVE SUSP. CEILING
(APPLIES TO SHT’S P1 THRU P6)
PROVIDE WALL ACCESS PANELS TO ACCESS CLEANOUTS.
WALL HUNG. REFER
TO SPECIFICATIONS.
05 JUL 11CJT
COORDINATOR: SK DESIGN CHIEF: AM ENGINEERING CHIEF: MB
I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKED
0 1’
SCALE: 1/4 " = 1’-0"
3’ 6’
P2
LACTATION
ROOM
WOMEN’S
RESTROOM
151.A
MEN’S
RESTROOM
152.A
VESTIBULE
0 1’
SCALE: 1/4 " = 1’-0"
3’ 6’
0 1’
SCALE: 1/4 " = 1’-0"
3’ 6’
MEN’S
RESTROOM
141.A
VESTIBULE
JANITOR’S
CLOSET
141.B
142.B
LACTATION
ROOM
WOMEN’S
RESTROOM
142.A
VESTIBULE
WCO
WCO
WCO
WCO
WCO
CO
CO
CO
CO
CO
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-2
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1 P-1 P-1
P-1 P-1 P-1 P-1
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3
CODED NOTES
PROVIDE NEW PLUMBING FIXTURES AS SHOWN, INCLUDING NEW
SANITARY, VENT, AND DOMESTIC HOT & COLD WATER PIPING,
VALVES & FITTINGS. REFER TO NEW STACK & RISER DIAGRAMS
SHEET P4. PROVIDE FIXTURE SHUT-OFF VALVES, LAVATORY
TRAPS, ETC. PER SPECIFICATION 22 00 00.
CO
WCO
�" DHW UP FROM BSMT.
2" DCW UP FROM BSMT.
�" DCW UP FROM BSMT & 1�" SAN DOWN TO BSMT.
1 �" DHW & 3" DCW UP FROM BSMT.
1�" DHW & 2�" DCW UP FROM BSMT.
4" SAN DOWN THRU FLOOR.
3" SAN DOWN THRU FLOOR.
4" SAN DOWN THRU FLOOR & 4" VTR.
4" VTR.
2" SAN DOWN THRU FLOOR.
FACILITY 20016
PROJECT NO. ZHTV 110002
FIRST FLOOR PLUMPING PLANS
RESTROOMS 119 & 120 PLUMBING PLAN
RESTROOMS 141 & 142 PLUMBING PLAN
RESTROOMS 151 & 152 PLUMBING PLAN
N
N
120.A
VESTIBULE
JANITOR’S
CLOSET
119.A
VESTIBULE
WOMEN’S
RESTROOM
W C
O W
C O
P-2
P-1P-1P-1
P-1 P-1 P-1
P-2 P-2
P-3
P-3
P-3
P-3
P-3 P-3 P-3 P-3
P-3 P-3 P-3
P-3 P-3 P-3
P-3 P-3 P-3
N
P-4A
P-4A
P-4B
P-5
P-5
P-5
FD-2
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
FD-1
1�" DHW & 2 �" DCW UP FROM BSMT.
MEN’S
RESTROOM
MEN’S
RESTROOM
ABOVE SUSP. CEILING
ABOVE SUSP.
CEILING
CAP 3" SAN ABOVE FLOOR.13
JP JP CJT 05 JUL 11
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-3
P-3
P-3
P-3
P-3
P-3
P-2
P-2
P-2
P-2
P-2
P-2
P-3
P-3
P-3
P-3
P-3
P-3
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-3
P-3
P-3
P-3
P-3
P-3
P-2
P-2
P-2
P-2
P-2
P-3
P-3
P-3
P-3
P-3
P-3
P-1
P-1
P-1
P-1
P-2
P-1
P-1
P-1
P-1
P-1
DCW
DHW
DCW
DCW
DCW
DCW
DCW
DHW
DHW
DHW
DHWR
DCW
DCW
DCW
DHWR
DCW
DCW
DCW
DHW
DHW
DHW
DHW
P-5
P-4A
P-4A
1 �"
2 �"
2"
2" 1"
2"
1 �"
2"
1"
1"
1"
1"
1"
1"
1 �"
2"
2"
1"
1"
2"
2 �"
2"
2 �"
2"
1 �"
2"
1"
1"
1"
1 �"
1"
2 �"
NO SCALE
NO SCALE
RISER DIAGRAM
RESTROOMS 78 & 79
RISER DIAGRAM
RESTROOMS 28 & 29
P-5
1 �"
1 �"
1 �"
1"
3"
3"
2"
1"
"D"
"D"
"D"
"D"
"C"
"D"
"D"
"B"
"B"
"A"
"A"
"C"
"C"
"D"
"D"
"B""B"
"B"
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKED
P3
FACILITY 20016
PROJECT NO. ZHTV 110002
BASEMENT RISER DIAGRAMS
JP JP
1"
CJT 05 JUL 11
P-3
P-3
P-3
P-3
P-2
P-3
P-3
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-2
P-2
P-2
P-2
P-2
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-3
P-1 P-1
P-1 P-1
P-1 P-1
P-2
P-2
P-2
D C
W
DCW
DCW
DHW
DHW
DCW
DHW
DHW
DCW
DHW
DCW
DHW
DHWR
DCW
DHW
DHWR
P-1
P-1
P-1
P-1
DHW
DCW
P-3
P-3
P-1
P-1
P-1
P-3
P-3 P-3
P-3
P-3
P-3
P-3
P-3
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-2
P-2
P-2
P-2
P-2
P-2
DCW
DHW
DCW
DHW
DCW
DHW
DCW
DHWDHWR
D C
W
D H
W
P-4A
P-
4B DCW
P-3
P-3
P-3
P-3
P-3
P-3
P-3
2"
2 �"
2"
2"
1 �"
1 �"
1"
2"
2"
1"
1 �"
2"
2 �"
1"
1"
1 �"
1 �"
1"
1 �"
2"
1 �"
2"
1 �"
2"
2"
2"
2"
2 �" 2 �"
2"
2"
1 �"
2"
1"
2"
2"
1"
1 �"
1 �"
2"
2"
1 �"
1"
NO SCALE
NO SCALE
RISER DIAGRAM
RESTROOMS 151 & 152
RISER DIAGRAM
RESTROOMS 119 & 120
NO SCALE
RISER DIAGRAM
RESTROOMS 141 & 142
3"
3"
1 �"
1 �"
1"
3"2 �"
"C"
P-
1 �"
2"
2"
2"
"D"
"D"
"D"
"B"
"B"
"B"
"D"
"C"
"C"
"B"
"A"
"A"
"A"
"A"
"A"
"A"
"A"
"A"
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKEDJP JP
P4
FACILITY 20016
PROJECT NO. ZHTV 110002
FIRST FLOOR RISER DIAGRAMS
1 �"
1 �"
P- 4A
P-
P-
1ST 1ST
1ST
1ST
1ST
1ST
1ST
1ST
1ST
1 �"
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
NO SCALE
STACK DIAGRAM
RESTROOMS 78 & 79
P-3
P-3
P-3
P-3
P-3
P-3
P-2
P-2
P-2
P-2
P-2
P-2
P-3
P-3
P-3
P-3
P-3
P-3
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-3
P-3
NO SCALE
STACK DIAGRAM
RESTROOMS 28 & 29
P-3
P-3
P-3
P-3
P-2
P-2
P-2
P-2
P-2
P-2
P-3
P-3
P-3
P-3
P-3
P-3
SEWAGE
EJECTOR
FD-1
FD-1
3"
FD-1
FD-1
BSMT
BSMT
BSMT
1ST
1ST
BSMT
BSMT
1ST
BSMT
WCO
WCO
CO
CO
CO
CO
CO
P-4A
P-4A
CO
1ST
4" UNDER
SLAB
4" UNDER
SLAB
3" UNDER
SLAB
5" UNDER
SLAB
5" UNDER
SLAB
4"
4"
4" UNDER
SLAB
4"
4"
4"
4"
4"
3"
3"
3"UNDER
SLAB
4" UNDER
SLAB
4" UNDER
SLAB
5" UNDER
SLAB
4"
3"
4"
4"
4"
5" UNDER
SLAB
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
4"
3"
4"
3"
3"
4"
4"
4"
4"
4"
3"
3"
1 �"
1 �"
3"
3"
ACCESS COVER
CLEANOUT PIPE
CLEANOUT TEE
18 GAUGE ROUND
GALVANIZED STEEL
NO SCALE
WALL CLEANOUT DETAIL
FINISHED OR
EXTERIOR WALL
5"
4"
4" VTR
4" VTR
BSMT
TYP.
TYP.
BSMT
TYP.
1 �"
P-5
1 �" P-5
1 �"
3"
2"
3"
3"
3"
2"
3"
3"
3"
CO
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKEDJP JP
P5
FACILITY 20016
PROJECT NO. ZHTV 110002
BASEMENT STACK DIAGRAMS
TYP.
FROM RESTROOMS
151 & 152
P-3
P-3
P-3
P-3
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1 P-1
P-2 P-3
P-2 P-3
P-2 P-3
P-2
NO SCALE
STACK DIAGRAM
RESTROOMS 151 & 152
P-1
P-2
P-2
P-1
P-1
P-1
FD-1
FD-1
WCO
WCO
P-3
P-3
P-3
P-1
P-2
P-1
P-3
P-3
P-3
P-3
P-3
P-3
FD-1
P-3
P-3
P-3
FD-1
P-1
P-1
P-1
P-1
P-3
P-3
P-3
P-3 P-3
P-3 P-3
P-2
P-3
P-2
P-3
P-2
P-3
P-3
P-2
P-2
P-2
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
P-1
FD-1
NO SCALE
NO SCALE
STACK DIAGRAM
RESTROOMS 141 & 142
P-4
P-5
P-4
FD-1
WCO
P-4
P-5
CO
CO
CO
CO
CO
CO
CO
CO
CO
1ST
1ST
1ST
1ST
1ST
1ST
1ST
1ST
1ST
1ST
1ST
CO
CO
WCO
WCO
WCO
1ST
TYP.
1ST
TYP.
1ST
STACK DIAGRAM
RESTROOMS 119 & 120
FD-1
FD-1
4"
4"
4"
4"
1ST4"
4"
4"
4"
3"
2"
2"
3"
3"UNDER
FLOOR
4"
3"UNDER
FLOOR
3"
1 �"
3"
2"
2"
3"
4" VTR
4" UNDER
FLOOR
4"
3"
4"3"
4"
4"
3"
4"
4"
5"
3"
3"
3"
3" 3"
3"
4" UNDER
FLOOR
4"
4"
4"
3"
3"
2" 2"
3"
3"
3"
4" VTR
4"
1 �"
2"
2"
4"
4" UNDER
FLOOR
4"
4"
4" UNDER
FLOOR
4"
4"4"
3"
3"
3"
3"
3"
4"
4"
2"
2"
2"
4"
WCO
WCO
3"
3"
3"
3"
4"
2 �"
2 �"
2 �" VTR
4" VTR
3"
3"
3"
3"
3"
CO
WCO
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKEDJP JP
P6
FACILITY 20016
PROJECT NO. ZHTV 110002
FIRST FLOOR STACK DIAGRAMS
4"
4"
P-5
1ST 1 �"
1 �"
P-2
P-2
UP
UP
UP
UP
UP
UP
UP
UP
UP
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKEDJP JP
NO SCALE
WOMEN
MEN
WOMEN
MEN
BASEMENT SANITARY INSPECTION PLAN
EXISTING SEWAGE
EJECTOR
N
PROVIDE TV INSPECTION OF SANITARY LINE FROM
RESTROOMS TO 8" SANITARY LINE TO DETERMINE
CURENT STATE OF LINE.
8"
6"
6"
5"
6"
8"
P7
FACILITY 20016
PROJECT NO. ZHTV 110002
BASEMENT SANITARY INSPECTION PLAN
2 PROVIDE TV INSPECTION OF SANITARY LINE FROM
SEWAGE EJECTOR TO 8" SANITARY LINE TO DETERMINE
CURENT STATE OF LINE.
CODED NOTES
DN
DN
DN
DN
BASEMENT
ROOF
BLDG 20011
DN
DATE REVISION BYNO. DATE NO. REVISION BY
C I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKEDJP JP
NO SCALE N P8
WOMEN
WOMEN
WOMEN
MEN
MEN
MEN
PROVIDE TV INSPECTION OF SANITARY LINE FROM
RESTROOMS TO 8" SANITARY LINE TO DETERMINE
CURENT STATE OF LINE.
PROVIDE TV INSPECTION OF SANITARY LINE FROM
RESTROOMS TO 6" SANITARY LINE TO DETERMINE
CURENT STATE OF LINE.
PROVIDE TV INSPECTION OF SANITARY LINE FROM
RESTROOMS TO SANITARY MANHOLE TO DETERMINE
CURENT STATE OF LINE.
6"
4"
4"
5" SANITARY DOWN
TO BASEMENT
5"
4"
SANITARY
MANHOLE
FIRST FLOOR SANITARY INSPECTION PLAN
CODED NOTES
FACILITY 20016
PROJECT NO. ZHTV 110002
FIRST FLOOR SANITARY INSPECTION PLAN
I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKED
M1
VESTIBULE
MEN’S
RESTROOM
WOMEN’S
RESTROOM
VESTIBULE
VESTIBULE
MEN’S
RESTROOM
WOMEN’S
RESTROOM
VESTIBULE
028029
029.A 028.A
079.A
078.A
N
0 61 3
SCALE: �" = 1’-0"
N
0 61 3
SCALE: �" = 1’-0"
EXISTING DUCTWORK TO REMAIN
LEGEND
JP JP
FACILITY 20016
PROJECT NO. ZHTV 110002
BASEMENT HVAC PLANS
RESTROOMS 78 & 79 HVAC PLAN
RESTROOMS 28 & 29 HVAC PLAN
NEW WORK
EXHAUST GRILLE
ROOF MOUNTED EXHAUST FAN
EF EXHAUST FAN
(APPLIES TO SHT’S M1 THRU M3)
1.
2.
MECHANICAL NOTES
REMOVE ALL EXHAUST AIR DIFFUSERS IN RESTROOMS.
PROVIDE NEW EXHAUST AIR DIFFUSERS AS SHOWN. SEE
SCHEDULE THIS SHEET.
3. CONTRACTOR SHALL CLEAN ALL RESTROOM DUCTWORK.
CFM MAX NEG.
STATIC
PRESSURE
(in. w.g.)
FLOOR
PLAN
SYMBOL
MAX
NOISE
CRITERIA
(NC)
NOMINAL INLET
DUCT SIZE
(in x in)
MODEL
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
TITUS MODEL
50 F EGGCRATE
1" X 1" X 1" GRID
OR EQUAL
13 2560
1 1
24"x 12" DUCT UP
24"x 12"
DUCT UP
EXHAUST GRILLE SCHEDULE
SUSPENDED CEILING
NO SCALE
TYPICAL RETURN AIR GRILLE DETAIL
BALANCING DAMPER
DUCT SIZE AS INDICATED
INLET DUCT SIZE
(SEE SCHEDULE THIS SHEET)
RETURN AIR
MAIN
RETURN AIR
GRILLE
TRANSITION TO RETURN AIR GRILLE
WIDTH
10 x 6
14 x 8
10 x 6
10 x 6
14 x 8
14 x 8
14 x 10
14 x 8
14 x 10
12 x 8
10 x 8
10 x 6
8 x 4
MAT.
AL.
COLOR
WHITE
DUCTWORK AND FAN SIZES SHOWN SHALL BE CONSIDERED AS
APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL
REQUIRED DIMENSIONS, AND ALL MATERIAL REQUIREMENTS
PRIOR TO ORDERING.
(APPLIES TO SHT’S M1 THRU M3)
CONNECTION POINT - NEW
TO EXISTING
TYP.
TYP.
I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKED
0 1’
SCALE: 1/4 " = 1’-0"
3’ 6’
M2
FACILITY 20016
PROJECT NO. ZHTV 110002
FIRST FLOOR HVAC PLANS
LACTATION
ROOM
WOMEN’S
RESTROOM
151.A
MEN’S
RESTROOM
152.A
VESTIBULE
0 1’
SCALE: 1/4 " = 1’-0"
3’ 6’
JP JP
RESTROOMS 151 & 152 HVAC PLAN
RESTROOMS 141 & 142 HVAC PLAN
RESTROOMS 119 & 120 PLAN
N
N
N
0 1’
SCALE: 1/4 " = 1’-0"
3’ 6’
TYP.
TYP.
TYP.
20"x 20"
DUCT UP
14"x 14"
DUCT UP
20"x 20"
DUCT UP
I
V
IL
ENGI
N
E E
R
US AF
W PAFB
WRIGHT-PATTERSON AIR FORCE BASE
88TH ABW
DATEDRAWNDESIGNED CHECKEDJP JP
A
20011
56789101112131415
N.I.C.
N.I.C.
N.I.C.
N.I.C. N.I.C.
N.I.C.
MODEL
SCALE: �" = 1’-0"
ORTH
ROOF HVAC PLAN
TAG
N
M
L
K
J
I
H
G
F
E
D
C
B
A
RMS
SERVED
TYPE CFM TOTAL STATIC
PRESSURE
MIN MOTOR
HP
VOLTS PHASE HERTZ
EXHAUST FAN SCHEDULE
EF-1
EF-3
EF-5
EF-6
141, 142
28,29
119,120
151, 152,78,79
CENTRIFUGAL
CENTRIFUGAL
CENTRIFUGAL
CENTRIFUGAL
CODED NOTES
REPLACE EF-1. SEE SCHEDULE THIS SHT.
REPLACE EF-3. SEE SCHEDULE THIS SHT.
REPLACE EF-5. SEE SCHEUDLE THIS SHT.
REPLACE EF-6. SEE SCHEDULE THIS SHT.
FACILITY 20016
PROJECT NO. ZHTV 110002
ROOF HVAC PLANS
M3
UNFUSED DISCONNECT SWITCH
REMOVABLE HOUSING
BASE
BACKDRAFT DAMPERS
RUN POWER LEADS IN CORNER INSIDE CURB
SECURE FAN TO CURB WITH SHEET
METAL SCREWS 6" O.C. ALL AROUND
ALUMINUM
BIRDSCREEN
NO SCALE
TYPICAL ROOF MOUNTED EXHAUST FAN DETAIL
MFGR’S EXTENDED PRE-FAB CURB
STANDING SEAM
METAL ROOF
FLASHING AND
CAULK ALL AROUND
PROVIDE W/GRAVITY BACKDRAFT DAMPER
PROVIDE W/BIRDSCREEN
REMARKS
1, 2
1, 2
1, 2
1, 2
GREENHECK
GB-180-5
GREENHECK
GB-180-3
GREENHECK
GB-220-7
GREENHECK
GB-101-3