110002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 is to incorporate both Addendum1 as w ell as the latest Davis-Bacon Wage Determination.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jul-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8601-13-R-0052
X 9B. DATED (SEE ITEM 11)
24-Jun-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt ofOffer is extended, X is not extended.
Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning copies ofthe amendment; (b) By acknowledging receipt of this amendment on each copy ofthe offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriat ion date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not , is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(Ifapplicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2013
CODE
AFLCMC/PZIOC - CONSTRUCTION SECTION
POC: ROBIN J. TIPTON
1940 ALLBROOK DRIVE, ROOM 109
WRIGHT-PATTERSON AFB OH 45433-5309
FA8601 7. ADMINISTERED BY (Ifother than item6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA8601-13-R-0052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 1/SUMMARY OF CHANGES
The purpose of this amendment is to:
1. To incorporate the latest Davis Bacon Wage Determination, OH130016, Modification 21, dated 5 July 2013.
This version replaces all previous versions. (Reference Attachment 33).
2. To incorporate Addendum 01 in its entirety.
3. All other terms and conditions remain unchanged.
ADDENDUM NUMBER 1
TO
DRAWINGS AND SPECIFICATIONS
FOR
BUILDING 16 RESTROOM RENOVATION
FACILITY 20016
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
PROJECT NUMBER: ZHTV 1100023
1. The contract Drawings and Specifications are hereby amended in part as follows:
A. On Drawing G1 dated 05 July 11, at the Sign Specification heading add the following note:
Sign Locations: provide new M/F signage at each of the renovated restrooms.
B. On Drawing G2 dated 05 July 11, add the heading “General Note” and the following:
1. Use of the northeast loading dock will be permitted as an entry point for deliveries from the lower level. A dumpster will be permitted along Monohan Way adjacent to the dock access, exact location TBD. The northeast loading dock is fully covered and is accessed from a ramp/drive below the adjacent building 11A, the access height is restricted to 10’-6”.
C. On Drawing G3 dated 05 July 11, add the heading “General Note” and the following:
1. Use of the south loading dock will be permitted as an entry point for deliveries from the first floor. A dumpster will be permitted in the south parking lot, exact location TBD.
Use of the exterior ramp from the south parking lot down to the lower level will be permitted. Use of the freight elevator will be permitted.
D. On Drawing A2 dated 05 July 11, at detail 2/ Construction Plan, in the Men’s Restroom 152 revise the coded note “23” on the south wall (2 instances) and replace with a coded note “6”.
E. On Drawing A3 dated 05 July 11, at detail 3/ Reflected Ceiling Plan, in the Vestibules 151.A and 152.A revise the coded note “10” and replace with a coded note “27”.
F. On Drawing A5 dated 05 July 11, at detail 3/ Reflected Ceiling Plan, in the Janitor’s Closet 118 revise the coded note “11” and replace with a coded note “27”.
G. On Drawing M1 dated 05 July 11, at the general Mechanical Notes, delete note 3 and replace with the following:
3. Contractor shall clean all restroom duckwork as shown on the drawings including risers. Include 100 LF project allowance for cleaning exhaust risers.
2. This Addendum Number 1 hereby forms and is made a part of the above named project drawings and specifications.
16 July 2013
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF DOCUMENTS, EXHIBITS AN
LIST OF DOCUMENTS, EXHIBITS AND ATTACHMENTS
List of Attachments
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Drawing: G0 1 5 JUL 11 Attachment 2 Drawing: G1 1 5 JUL 11 Attachment 3 Drawing: G2 1 5 JUL 11 Attachment 4 Drawing: G3 1 5 JUL 11 Attachment 5 Drawing: A1 1 5 JUL 11 Attachment 6 Drawing: A2 1 5 JUL 11 Attachment 7 Drawing: A3 1 5 JUL 11 Attachment 8 Drawing: A4 1 5 JUL 11 Attachment 9 Drawing: A5 1 5 JUL 11 Attachment 10 Drawing: A6 1 5 JUL 11 Attachment 11 Drawing: I-100 1 5 JUL 11 Attachment 12 Drawing: I-110 1 5 JUL 11 Attachment 13 Drawing: I-111 1 5 JUL 11 Attachment 14 Drawing: I-112 1 5 JUL 11 Attachment 15 Drawing: P1 1 5 JUL 11 Attachment 16 Drawing: P2 1 5 JUL 11 Attachment 17 Drawing: P3 1 5 JUL 11
Attachment 18 Drawing: P4 1 5 JUL 11 Attachment 19 Drawing: P5 1 5 JUL 11 Attachment 20 Drawing: P6 1 5 JUL 11 Attachment 21 Drawing: P7 1 5 JUL 11 Attachment 22 Drawing: P8 1 5 JUL 11 Attachment 23 Drawing: M1 1 5 JUL 11 Attachment 24 Drawing: M2 1 5 JUL 11 Attachment 25 Drawing: M3 1 5 JUL 11 Attachment 26 Drawing: E1 1 15 APR 11 Attachment 27 Drawing: E2 1 15 APR 11 Attachment 28 Drawing: E3 1 30 JUN 11 Attachment 29 Drawing: E4 1 15 APR 11 Attachment 30 Drawing: E5 1 15 APR 11 Attachment 31 Drawing: E6 1 5 JUL 11 Attachment 32 Specifications 355 26 APR 13 Attachment 33 Davis-Bacon Wage Decision, OH 16, MOD 21 60 5 JUL 13
(End of Summary of Changes)