FA8601-13-R-0052-0002.pdf

PDF 19 KB Posted

Attached to
Renovate Restrooms F/20016
Solicitation number
FA8601-13-R-0052
Issued by

About this file

Amendment 0002

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

110002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

To extend the closing date and incorporate the latest Davis-Bacon Wage Decision.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8601-13-R-0052

X 9B. DATED (SEE ITEM 11)

24-Jun-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt ofOffer X is extended, is not extended.

Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning 1 copies ofthe amendment; (b) By acknowledging receipt of this amendment on each copy ofthe offer submitted;

or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriat ion date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not , is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(Ifapplicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2013

CODE

AFLCMC/PZIOC - CONSTRUCTION SECTION

POC: POC: DEVON BANKS

1940 ALLBROOK DRIVE, ROOM 109

WRIGHT-PATTERSON AFB OH 45433-5309

FA8601 7. ADMINISTERED BY (Ifother than item6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8601-13-R-0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002 SUM OF CHANGES

The purpose of Amendment 0002 is to:

1. To incorporate the latest Davis Bacon Wage Determination, OH130016, Modification 22, dated 19 July 2013.

This version replaces all previous versions. (Reference Attachment 33).

2. Extend the closing date of Request for Proposal (RFP) FA8601-13-R-0052 from 2:00 p.m. on Wednesday, 24 July 2013 to 2:00 p.m. on Thursday, 25 July 2013.

3. Effective 15 July 2013 – the Contract Specialist (CS) is hereby amended as follows:

FROM: Neal Duiker TO: Devon Banks, devon.banks@us.af.mil, 937-522-4640

All correspondence shall be addressed to both the CO, Robin Tipton and the CS, Devon Banks.

3. All other terms and conditions remain unchanged.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-Jul-2013 02:00 PM to 25-Jul-2013 12:00 AM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF DOCUMENTS, EXHIBITS AN

LIST OF DOCUMENTS, EXHIBITS AND ATTACHMENTS

List of Attachments

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawing: G0 1 5 JUL 11 Attachment 2 Drawing: G1 1 5 JUL 11 Attachment 3 Drawing: G2 1 5 JUL 11 Attachment 4 Drawing: G3 1 5 JUL 11 Attachment 5 Drawing: A1 1 5 JUL 11 Attachment 6 Drawing: A2 1 5 JUL 11 Attachment 7 Drawing: A3 1 5 JUL 11 Attachment 8 Drawing: A4 1 5 JUL 11 Attachment 9 Drawing: A5 1 5 JUL 11 Attachment 10 Drawing: A6 1 5 JUL 11 Attachment 11 Drawing: I-100 1 5 JUL 11 Attachment 12 Drawing: I-110 1 5 JUL 11 Attachment 13 Drawing: I-111 1 5 JUL 11 Attachment 14 Drawing: I-112 1 5 JUL 11 Attachment 15 Drawing: P1 1 5 JUL 11 Attachment 16 Drawing: P2 1 5 JUL 11

FA8601-13-R-0052

Attachment 17 Drawing: P3 1 5 JUL 11 Attachment 18 Drawing: P4 1 5 JUL 11 Attachment 19 Drawing: P5 1 5 JUL 11 Attachment 20 Drawing: P6 1 5 JUL 11 Attachment 21 Drawing: P7 1 5 JUL 11 Attachment 22 Drawing: P8 1 5 JUL 11 Attachment 23 Drawing: M1 1 5 JUL 11 Attachment 24 Drawing: M2 1 5 JUL 11 Attachment 25 Drawing: M3 1 5 JUL 11 Attachment 26 Drawing: E1 1 15 APR 11 Attachment 27 Drawing: E2 1 15 APR 11 Attachment 28 Drawing: E3 1 30 JUN 11 Attachment 29 Drawing: E4 1 15 APR 11 Attachment 30 Drawing: E5 1 15 APR 11 Attachment 31 Drawing: E6 1 5 JUL 11 Attachment 32 Specifications 355 26 APR 13 Attachment 33 Davis-Bacon Wage Decision, OH 16, MOD 22 61 19 JUL 13

(End of Summary of Changes)

File details come from the government source that posted it. Updated .