About this file

This document contains a Q&A log from a site visit for a Simplified Acquisition of Base Engineering Requirements (SABER) construction project at Wright-Patterson Air Force Base. The project involves renovating office space by building new interior walls to convert three offices into two offices meeting an STC 52 rating. Questions addressed include the availability of as-built drawings and Revit models, blocking and ceiling requirements, window and door configurations, mechanical and electrical systems, contractor work scope, and testing needs. The related federal contract opportunity notice specifies that the solicitation is set aside for 8(a) small businesses located in Ohio for NAICS code 236220. The Department of the Air Force Materiel Command Lifecycle Management Center at Wright-Patterson Air Force Base is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to WPAFB Construction: Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
30011_Furniture Plan.pdf PDF
WPAFB_BFS_and_ Appendicies_Mar 2016.pdf PDF
Attachment 9 - SABER RFP Pricing Worksheet 2 Mar 2021.xlsx XLSX spreadsheet
Solicitation - FA860121R0015.pdf PDF
SABER QA Log.docx DOCX document
SABER QA Log.docx DOCX document
For SEED - Replace Water Lines 2006.zip ZIP file
For SEED - Building 11 Renovation 2006.zip ZIP file
For SEED - Replace HVAC and AHUA 2004.zip ZIP file
For SEED - Repair HVAC Private Offices 2014.zip ZIP file
For SEED - New Electrical Updates - Basement 2005.zip ZIP file
SABER QA Log.docx DOCX document
SABER QA Log.docx DOCX document
SABER QA Log.docx DOCX document
SABER QA Log.docx DOCX document
Attachment 2 Final 2021 BASIC SOW 8 Feb 2021.docx DOCX document
Attachment 9 - SABER RFP Pricing Worksheet 8 Feb 21.xlsx XLSX spreadsheet
Solicitation - FA860121R0015.pdf PDF
Attachment 1 - Solication Cross Reference Matrix 22Jan21 final.docx DOCX document
Attachment 6 - Wage Determination - Montgomery.pdf PDF
Attachment 4 - SEED Drawing.pdf PDF
Attachment 3 - SEED SOO.docx DOCX document
Attachment 5 - Wage Determination - Greene.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Log: WPAFB SABER Solicitation No. FA860121R0015

No.
Question Asked:
Government’s Response:
1
CAD Drawings or As-Builts available?
Yes. CE working on getting those.
2
Are only the new walls to get the STC rating or all walls?
All walls except for the exterior wall with the windows shall meet the STC rating.
3
Any HAZMAT issues present?
No. Assume no HAZMAT issues present. None are known.
4
Any blocking requirements for the new partition?
Blocking should be provided for support of the new partition as required for structural integrity
5
Is there any objection to losing some interior space in the new rooms to build a new inner wall on the corridor or side walls?
No objection
6
Does the Government want the contractor to remove the plaster ceiling above the suspended ceiling to make true to deck?
Remove just at the location of the new wall
7
Do the new ceiling tiles and 2x2 grid need to match existing?
No. Can be base facility standard
8
Window treatments to remain?
Yes
9
Need to relocate windows?
No, since SOO went from 3 offices to 2 offices, there is no need to remove/relocate windows or do outside masonry
10
Does the Government really want 2 doors for each office?
No. Government desires one door for each office, which will be two doors total.
11
Current mechanical balancing reports?
No
12
As-built drawings and Revit (sp?)
Record Drawings does have As-Builts for Building 11. Revit models and CAD exports are acceptable by Record Drawings
13
Does the contractor need to remove projector and AV equipment?
No. Government will handle the removal of all furniture, whiteboard, projector, and all AV equipment.
14
After whiteboard comes down, need to patch and paint everything?
Yes
15
Are wall heaters independent of each other?
These are supplemental heaters and are not independent
16
Coefficient D towards architectural fees?
Coefficient D is specifically used for application to services by an A/E firm used outside of the SABER Contractor for specialties by a professional engineer or architect that are not typically required on standard SABER projects
17
Is professional oversight required on this project?
Normally just the supervisor on the site doing daily job walks. There may be some SABER projects that do require professional oversight.
18
Are the wall heaters functioning and are they to remain?
Yes
19
Would the holes in the upper ceiling to the next level need to be sealed?
Yes
20
What transformation is the Government seeking between the SOO and the SOW?
More details to the SOO are provided during job walks/site visits. Government reviews the SOW for inclusion of the further details that were discussed during the site visit.
21
Will the Government need a temperature control in each new office room?
Yes
22
Average value of SABER orders?
All over. Mostly between $10k and $250k
23
Is there space for a contractor trailer on base?
Yes. Area B
24
Does the STC 52 pertain to the doors too and tested?
Yes
25
What is to be done with the current doors and frames?
The current door and frame will be demoed and disposed accordingly
26
Extent of contractor’s work on com lines?
Contractor should rough in the com lines. Base COM will handle final com installation.
27
Should the contractor fully demo the side walls to meet the STC standard
Don’t need to fully demo the side walls, but do what needs to be done to meet the STC standard. Government is willing to lose space in office rooms if another wall has to be built in front of existing wall.
28
Is the chase in the corner of the conference room with all the conduit running through it allowed to stay in the office?
Yes. No need to remove the chase and the conduit
29
Testing required for the STC?
No testing required for the STC 52 in the space. There is not a certification requirement only a design to meet the STC 52 performance on partitions to adjacent spaces.