Attachment 3 - SEED SOO.docx
DOCX document 33 KB Posted
- Attached to
- WPAFB Construction: Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA8601
About this file
This Statement of Objectives describes a construction project at Wright-Patterson Air Force Base to convert an existing conference room into two private offices totaling 313 square feet. The project scope includes hazardous material removal, demolition, construction of new stud walls and ceilings, installation of doors, locks, lighting, HVAC, finishes and other requirements. Submittals such as schedules, drawings, and as-builts are required. The performance period is 80 days. This opportunity is set aside for 8(a) firms located in Ohio under Solicitation FA8601 for the Simplified Acquisition of Base Engineering Requirements contract at Wright-Patterson Air Force Base, awarded by the Department of the Air Force Materiel Command Lifecycle Management Center.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES (SOO)
for Project #: ZHTV20SEED Work Order #: 02020 Title:
WRIGHT-PATTERSON AFB, OH
CENMP Construction Manager: Allen A. Beedy Date: 11 January 2021
1. Project Purpose: Convert existing Conference Room to construct (3) additional private offices are needed to meet the separation of management staff for privacy and COVID protocols.
2. General Project Scope: Construct (2) Private Offices (154 SF Each) 313 SF Total
3. General Requirements: (taken from FL-11)
3.1. Period of Performance: 80 days. Ref: Construction Time Estimate on page 5.
3.2. Contractor must field verify all dimensions.
3.3. Contractor must forward a job walk summary 48 hrs after each job walk.
3.4. All work shall be accomplished in a professional and craftsman-like manner.
3.5. All work shall be in compliance with the current SABER Contract SOW and Specifications.
3.5. All materials shall be installed per manufacturers’ recommendations, unless specified otherwise in writing. All materials shall be utilized within the manufactures’ limitations and intended purposes.
3.6. In the event of damages of any nature caused by this work due to improper protection, precaution or safety measure, such damages shall be repaired or such property shall be replaced by the Contractor at no cost to the Government. In the event the Contractor does not satisfactorily repair or replace such damage caused by the work of this contract in a timely manner, the Government will make the necessary corrections and the contractor shall reimburse the Government for inconvenience, labor and materials involved.
4. Liquidated Damages: No
5. Design Analysis/calculations and Professional Engineer (PE) Certification required: No
6. Fire protection and life-safety analysis by Fire Protection Engineer (FPE) required: No
7. Test Report required: No If yes, what test report(s) is/are required:
8. *Schedule of Materials Submittals:
| X |
| AF Form 1354 (Real Property) |
Shop Drawings
| X |
| AF Form 3064 (Schedule) |
| X |
| Texture/Pattern Samples |
| X |
| As-builts |
Site Restoration
Color Boards
Utilities
| X |
| Construction Schedule |
Warranty Package
| Controls |
| X |
| Waste Diversion Plan |
| X |
| Door Schedule |
Window Schedule
| X |
| Electrical |
Manufacturer's Recommendations
| X |
| Mechanical |
Operating Instructions
Ozone Depleting Substances (AF From 1471)
Plumbing
9. *Drawings Required:
Arch details/Finish Carpentry
Plumbing Plan
Cover Sheet
Power Plan/Panel Schedule
| X |
| Demolition Plan |
| X |
| Reflected Ceiling Plan |
| X |
| Electrical Lighting Plan |
Roof Plan
| X |
| Elevations-Exterior |
Structural Plan
| X |
| Elevations-Interior |
| X |
| Telecommunications Plan |
Existing Site Plan
Wall/Roof sections
| X |
| Finish Schedule |
| X |
| Window/door Schedule |
| X |
| Fire Alarm/Detection Plan |
Fire Suppression Plan
| X |
| Floor Plans |
Grading/Landscape Plan
| X |
| Lighting Schedule |
| X |
| Mechanical Plan |
New Site Plan
*This is not an all-inclusive list. This does not relieve the Contractor of their responsibility to provide the Government required submittals/drawings.
10. General Scope of Work: Construct (2) New Private Offices. Ref: RS Means Divisions broken down by craft (use division numbers), unless it is more feasible to breakdown the work break down structure in another manner, such as by room or facility.
10.1 HAZARDOUS MATERIAL:
10.1.1 Contractor shall remove all lead paint and mold if present as required for new construction.
10.2 DEMOLITION:
10.2.1 Remove existing doorway into Conference Room.
10.2.2 Remove ceiling grid, tiles and lights in designated area.
10.2.3 Remove any existing wiring, receptacles or other utilities within removed walls
10.2.4 Remove all finishes.
10.3 CONSTRUCTION:
10.3.1 Infill areas around new windows with brick masonry to match existing elevation.
10.3.2 Provide 2’x2’ ceiling tile and grid in each office.
10.3.3 Frame in a new stud wall to true deck to enclose (2) new office 313 square feet in total.
10.3.4 Provide Sound attenuation insulation to achieve an STC rating for privacy (STC 52)
10.3.5 Install new drywall and Level 4 finish.
10.3.6 Provide and install (2) new door frames and (2) doors for each office.
10.3.7 Provide and install (2) new office locksets and hardware per BFS.
10.4 ELECTRICAL:
10.4.1 Provide (2) ceiling lights per office with 2’x2’ LED Light troffers per RCP.
10.4.2 Provide and install (6) power receptacles per office and cover plates as specified by Government.
10.4.3 Provide and install any applicable Emergency and alarm notifications (strobe, audio, etc.) per office.
10.4.4 Provide and install room occupancy sensors, light switches and wiring.
10.4.5 Provide and install comm. as designated on furniture plan.
10.5 HVAC:
10.5.1 Install new supply and return duct lines to each enclosed office.
10.5.2 Provide and install return and supply diffusers in enclosed office.
10.5.3 If required, install new VAV box.
10.5.4 Balance and test HVAC
| 10.7. | FINISHES: | |
| 10.7.1 | Contractor shall prime and paint all walls to match existing spaces. | |
| 10.7.2 | Install new wall base to match existing spaces. | |
| 10.7.3 | Install carpet in office to match existing. |
Construction Time Estimate
Construction time itemized estimate as follows:
| Function: | Days: | ||
| Submittal Approval | ___14_____ | ||
| Mobilization | ____1_____ | ||
| Sub Negotiations | ___10_____ | ||
| Long Lead Items | ____0_____ | ||
| Job Preparations | ____0_____ | ||
| Construction (MS Project) | ___52_____ | ||
| Clean up | ____2_____ | ||
| Final Inspection/Punchlist | ____1_____ | ||
| Subtotal: | ___80_____ |
Additional Factors:
| Weather Delays | ____0_____ | |||
| Security Delays | ____0_____ | |||
| Phasing Delays | ____0_____ | |||
| Reduction for Over Time | ____0_____ | |||
| Subtotal: | ____0_____ | |||
| Total: | ____0_____ |