Attachment 9 - SABER RFP Pricing Worksheet 2 Mar 2021.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
WPAFB Construction: Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA8601
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document includes a pricing worksheet and details of a federal contract opportunity for construction services at Wright Patterson Air Force Base. The simplified acquisition of base engineering requirements (SABER) contract has an estimated total value of over $115 million across a five year base period and a six month option. The pricing worksheet provides coefficients for different types of work including standard and non-standard hours, materials, and professional services. Offerors must complete the blue cells with their pricing coefficients while the remaining cells will automatically calculate pricing based on the specified formula. The opportunity is set aside for 8(a) small businesses located in Ohio with a NAICS code of 236220 for commercial and institutional building construction. The Department of the Air Force Materiel Command Lifecycle Management Center at Wright Patterson Air Force Base is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to WPAFB Construction: Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
30011_Furniture Plan.pdf PDF
WPAFB_BFS_and_ Appendicies_Mar 2016.pdf PDF
Solicitation - FA860121R0015.pdf PDF
SABER QA Log.docx DOCX document
SABER QA Log.docx DOCX document
For SEED - Replace Water Lines 2006.zip ZIP file
For SEED - Building 11 Renovation 2006.zip ZIP file
For SEED - Replace HVAC and AHUA 2004.zip ZIP file
For SEED - Repair HVAC Private Offices 2014.zip ZIP file
For SEED - New Electrical Updates - Basement 2005.zip ZIP file
SABER QA Log.docx DOCX document
SABER QA Log.docx DOCX document
SABER QA Log.docx DOCX document
SABER SEED Visit - RFI Log.docx DOCX document
SABER QA Log.docx DOCX document
Attachment 2 Final 2021 BASIC SOW 8 Feb 2021.docx DOCX document
Attachment 9 - SABER RFP Pricing Worksheet 8 Feb 21.xlsx XLSX spreadsheet
Solicitation - FA860121R0015.pdf PDF
Attachment 1 - Solication Cross Reference Matrix 22Jan21 final.docx DOCX document
Attachment 6 - Wage Determination - Montgomery.pdf PDF
Attachment 3 - SEED SOO.docx DOCX document
Attachment 5 - Wage Determination - Greene.pdf PDF
Attachment 4 - SEED Drawing.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SABER PRICING WORKSHEET

(FA8601-21-R-0015, Section J, Attachment 9)

Ordering
PeriodEstimated Ordering Period AmountCoefficient ACoefficient BCoefficient CCoefficient DCoefficient
TotalOrdering Period Evaluated Price
WeightCoefficientWeightCoefficientWeightCoefficientWeightCoefficient
Year 1$22,100,000.0075.00%10.00%5.00%10.00%0.0000$0.00
Year 2$22,500,000.0075.00%10.00%5.00%10.00%0.0000$0.00
Year 3$23,000,000.0075.00%10.00%5.00%10.00%0.0000$0.00
Year 4$23,500,000.0075.00%10.00%5.00%10.00%0.0000$0.00
Year 5$23,900,000.0075.00%10.00%5.00%10.00%0.0000$0.00
Option - 6 Months$12,153,404.2675.00%10.00%5.00%10.00%0.0000$0.00

Seed Task Price

Total Evaluated Price $0.00

Notes:
1. Offeror is required to complete all blue cells. All other cells will self populate based on the formulas specified in Section M of the RFP.
2. The coefficient weights and estimated ordering period amounts specified are for evaluation purposes only. They are not indicative of actual contract utilization.
3. Section 11.1.6 of the Statement of Work (SOW) provides the coefficent definition and what shall be included in the proposed coefficients.
4. Coefficient A is for work performed during standard working hours (reference SOW Section 11.1.6.1).
5. Coefficient B is for work performed during non-standard working hours (reference SOW Section 11.1.6.2).
6. Coefficient C is for equipment and material not included in the RSMeans Unit Price Book (reference SOW Section 11.1.6.3).
Shall be no less than 1.0000 and not greater than 1.1000.
7. Coefficient D is for professional engineering services and permits not included in the RSMeans Unit Price Book (reference SOW Section 11.1.6.4).
Shall be no less than 1.0000 and not greater than 1.1000.
8. Section 11.4.1.2.B of the SOW specifies the only allowable adjustments to RSMeans Unit Price Book line items.

Source Selection Information (when completed) – See Far 2.101 and 3.104 Controlled Unclassified Information

File details come from the government source that posted it. Updated .