SABER QA Log.docx
DOCX document 17 KB Posted
- Attached to
- WPAFB Construction: Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA8601
About this file
This document contains a Q&A log and details of a federal contract opportunity for construction services at Wright-Patterson Air Force Base. The Simplified Acquisition of Base Engineering Requirements for WPAFB solicitation is set aside for 8(a) small businesses located in Ohio involved in general building construction. The Q&A log addresses page limits, formatting requirements, and exclusions for project examples, resumes, and teaming agreements in proposals due in response to the solicitation. Relevant response dates are provided.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Log: WPAFB SABER Solicitation No. FA860121R0015
| No. |
| Date Submitted: |
| Date Answered: |
| Question Asked: |
| Government’s Response: |
| 1 |
| 2/19/21 |
| 2/22/21 |
Reference RFP L.4.2.4 – Step One, Prior Experience Compliance Gate
Two questions:
(1) Are Project Examples required to be double-spaced? If so, would the Government consider excluding these from the 45-page limit?
(2) Are Project Examples required for our A/E partner, and if so, does the 3 to 5-project requirement include their projects?
1) Project examples may be single spaced
2) A/E Partner does not need to provide 3-5 separate projects. The Government assumes that the A/E partner or sub would be included as part of the prime’s 3-5 project examples.
| 2 |
| 2/19/21 |
| 2/22/21 |
| Reference RFP L.4.2.4 – Step Two, Factor 1, Subfactor 1, Item D – Personnel Resumes |
We understand that resumes are excluded from the 45-page limit. Are they required to be double-spaced?
Resumes may be in the format in which the resumes are written, and are not required to be double spaced.
| 3 |
| 2/19/21 |
| 2/22/21 |
| Reference RFP L.4.2.4 – Step Two, Factor 1, Subfactor 1, Item C – Teaming Agreement |
A Teaming Agreement usually runs 7 to 8 pages. Can this item be excluded from the 45-page limit?
The teaming agreement page count may be excluded from the 45-page limit.