JUL2025A00Z.pdf

PDF 80 KB Posted

Attached to
LITENING AN/AAQ-28 Contractor Logistic Support (CLS)
Solicitation number
FA8540-24-R-0007
Issued by

About this file

This document is a Data Item Description (DID) for the Engineering Change Proposal System Safety Report (ECPSSR), with the document number DI-SALF-80103D, approved on 20250715 by the Air Force Materiel Command (AFMC). The ECPSSR is used to document safety impacts associated with proposed engineering changes throughout a system's life cycle, including potential supporting documentation like analyses, test results, and trade-off studies. The report must comprehensively detail the reason for the engineering change proposal, list hazardous areas and their potential system design impacts, analyze existing hazards in the Hazard Tracking System, estimate risk assessment code changes, identify software impacts, and summarize the overall safety implications of the proposed engineering change.

The document specifies detailed content requirements for the ECPSSR, including describing how proposed changes might positively or negatively affect existing hazard controls, estimating changes to the Risk Assessment Code (RAC), identifying potentially impacted software with potential changes to Software Control Category and Software Criticality Index, and recommending updates to hazard analyses and Level of Rigor (LOR) task activities if the engineering change is authorized. The document supersedes the previous version DI-SALF-80103C and is part of a suite of related system safety documentation, with copies available online at https://quicksearch.dla.mil.

View the file

Other files

File Type Posted
FA854024R0007-0008.pdf PDF
Attach 9_GFP.pdf PDF
Attach 1_CATP_PWS.pdf PDF
Attach 8_SectionLPricingInstructions.pdf PDF
Attach 7_ConsolidatedClauseList.pdf PDF
Attach 6_WageDeterminations.pdf PDF
Exhibit 1_DD1423_CDRLsPkg.pdf PDF
Attach 5_TandE_OandA.pdf PDF
Attach 2_AFMC_FORM158_Packaging.pdf PDF
Attach 3_DDFORM1653_Transportation.pdf PDF
A00Y TMCR GUEE 24-16 LITENING Updated6_12_2025.pdf PDF
JUL2025A00Y.pdf PDF
AUG2025A00J.pdf PDF
FA854024R0007-0007 FINAL.pdf PDF
JUL2025A01G.pdf PDF
JUL2025A01F.pdf PDF
FA8540-24-R-0007-0006.pdf PDF
FA854024R0007-0005.pdf PDF
FA854024R0007_0004.pdf PDF
FA854024R0007_0003.pdf PDF
Attach_6_DD1423Pkg.pdf PDF
Attach_1_2025_CATP_PWS_RevC.pdf PDF
FA854024R0007-0001.pdf PDF
FA854024R0007_0002.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

DATA ITEM DESCRIPTION

Title: ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)

Number: DI-SAFT-80103D Approved Date: 20250715

AMSC Number: F10581 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: 40 (AFMC/SE) Project Number: SAFT-2025-003

Applicable Forms: N/A

Use/Relationship: The Engineering Change Proposal System Safety Report (ECPSSR) is used for each Engineering Change Proposal (ECP) or Change Notice (CN) to document the safety impacts over the system life cycle associated with the introduction of the proposed engineering change into the design. This may include additional supporting documentation such as analyses, test results, and trade-off studies.

a. This Data Item Description (DID) contains the content and format preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID is related to DI-SAFT-80101, System Safety Hazard Analysis Report (SSHAR); DI- SAFT-80102, Safety Assessment Report (SAR); DI-SAFT-80104, Waiver or Deviation System Safety Report (WDSSR); DI-SAFT-80105, System Safety Program Progress Report (SSPPR); DI- SAFT-80106, Health Hazard Assessment Report (HHAR); and DI-SAFT-82085, Hazard Tracking System (HTS) Data..

(Copies of these DIDs are available online at https://quicksearch.dla.mil.)

c. This DID supersedes DI-SAFT-80103C.

Requirements:

1.Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2.Format. The ECPSSR shall be in the contractor’s format.

3.Content. The ECPSSR shall include the following information resulting from a review of each

ECP.

Source: http://assist.dla.mil -- Downloaded: 2025-08-29T14:30Z Check the source to verify that this is the current version before use.

https://quicksearch.dla.mil/

DI-SAFT-80103D

3.1. The reason for the ECP.

3.2. A list, in narrative or tabular form, of all hazardous areas associated with the ECP. Each hazardous area shall describe how the hazardous area would impact the system design.

3.3. A list of existing hazards in the Hazard Tracking System (HTS) that would be impacted by the

ECP.

3.3.1. These impacts may be positive (e.g. a reduction of risk in the form of additional hazard controls) or negative (e.g. an increase of risk or reduction of the effectiveness of a hazard control).

3.3.2. For each identified hazard, an estimate of how the hazard’s MIL-STD-882E(C1) Table III Risk Assessment Code (RAC) could be affected by the ECP.

3.4. If there are previously identified hazards associated with the ECP, these hazards shall be included in a tabular form that accounts for the same information as in the HTS to include the

RAC

3.4.1. If it is determined that there are no hazards, a description of the analysis process and factors which allowed this conclusion shall be included.

3.5. The safety impact of the ECP upon the existing system that summarizes all hazardous areas and impacted hazards.

3.6. An identification of any update(s) of existing hazard analyses required to incorporate the effect(s) of the engineering change if the change is authorized.

3.7. A listing of all of the software impacted by the ECP.

3.7.1. For each unit of software identified, an estimation of potential impacts to the Software Control Category (SCC), Software Criticality Index (SwCI) and associated Level of Rigor (LOR) task activities.

3.7.2. An identification of any update(s) to LOR task activities required to incorporate the effect(s) of the engineering change if the change is authorized.

End of DI-SAFT-80103D

Source: http://assist.dla.mil -- Downloaded: 2025-08-29T14:30Z Check the source to verify that this is the current version before use.

File details come from the government source that posted it. Updated .