Exhibit 1_DD1423_CDRLsPkg.pdf
PDF 4 MB Posted
- Solicitation number
- FA8540-24-R-0007
About this file
This document is a Contract Data Requirements List (CDRL) for the LITENING CATP2 Indefinite Delivery/Indefinite Quantity (IDIQ) contract awarded to Northrop Grumman Systems Corporation by the Air Force Life Cycle Management Center (AFLCMC). The CDRL outlines approximately 30 different data delivery requirements for the LITENING pod program, including technical, management, safety, and logistics reports. Key data items include Presentation Materials, Deficiency Reports, Engineering Change Proposals, Configuration Management Plans, Test Plans, Software Version Descriptions, Scientific and Technical Reports, System Safety Program Plans, and Hazard Tracking System Data.
The contract (FA8540-XX-D-XXXX) covers the LITENING EW-A program, with most data items to be submitted to AFLCMC WNX AV. Submission frequencies range from one-time to quarterly, with most items requiring 30 calendar days for government review. Distribution statements are primarily marked as "D" (Administrative/Operational Use) or "E" (Software Documentation/Critical Technology), and first submissions are typically due within 30-120 days after contract award. The comprehensive CDRL ensures detailed documentation and oversight of the LITENING pod's development, testing, safety, and logistical processes throughout the contract period.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/17/2025 10:50:33 AM EST CDRL Table of Contents LITENING_CATP2 IDIQ CDRL Package
CONTRACT #: FA8540-XX-D-XXXX
CONTRACTOR: NORTHROP GRUMMAN SYSTEMS
CORPORATION
SET NAME: CATP 2_LITEN-Basic PD-A SYSTEM ITEM: LITENING
PROGRAM: EW-A - LITENING
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
A000 AFLCMC/WNY N/A FA8540-19-D-0001
Non-Deliverable CDRL
A001 AFLCMC WNX AV DI-ADMN-81373/T PWS Ref: 4.3.4, 4.9, 5.1, 7.2
Presentation Material
A002 AFLCMC WNX AV DI-PSSS-81535B PWS Ref: 3.8.2, 4.4, 4.9, 5.1, 6.1
Deficiency Report (DR)
A003 AFLCMC WNX AV DI-SESS-80639E PWS Ref: 5.1, 6.4
Engineering Change Proposal (ECP)
A004 AFLCMC WNX AV DI-SESS-80642E PWS Ref: 5.1, 6.4
Notice of Revision (NOR)
A005 AFLCMC WNX AV DI-SESS-80858D PWS Ref: 6.1
Supplier's Configuration Management Plan
A006 AFLCMC WNX AV DI-IPSC-81436A PWS Ref: 3.8.2, 4.9, 5.1
Interface Design Description
A007 AFLCMC WNX AV DI-SESS-81254D PWS Ref: 4.9, 5.1
Request for Nomenclature (DD Form 61)
A008 AFLCMC WNX AV DI-ADMN-81250C PWS Ref: 3.8.1, 6.3.1
Meeting Minutes
A009 AFLCMC WNX AV DI-MGMT-81749B PWS Ref: 4.3.1
DoD Maintenance Workload (50/50) Report
A00A AFLCMC WNX AV DI-IPSC-81431A/T PWS Ref: 2.1, 3.8
System/Subsystem Specification (SSS)
A00B AFLCMC WNX AV DI-ILSS-80872/T PWS Ref: 5.2
Training Material (Aircrew Academics)
A00C AFLCMC WNX AV DI-IPSC-81442A/T PWS Ref: 3.8.2, 4.9
Software Version Description (SVD)
A00D AFLCMC WNX AV DI-AVCS-80700A/T PWS Ref: 3.8.2, 4.9, 7.2
Computer Software Product End Items
A00E AFLCMC WNX AV DI-MGMT-81453C/T PWS Ref: 3.5
Data Accession List (DAL)
A00F AFLCMC WNX AV DI-MISC-80711A/T PWS Ref: 3.8, 4.4.8.1.1, 4.9, 5.1, 7.1, 7.2
Scientific and Technical Reports
A00G AFLCMC WNX AV DI-MISC-81454D PWS Ref: 3.8.2, 4.9
"Computer Program Identification Number (CPIN) Catalog Information"
A00H AFLCMC WNX AV DI-NDTI-80566A PWS Ref: 3.8.2, 4.9, 5.1
Test Plan
A00J AFLCMC WNX AV DI-NDTI-80603A/T PWS Ref: 3.8.2, 4.9, 5.1
Test Procedure
A00K AFLCMC WNX AV DI-NDTI-80809B PWS Ref: 3.8.2, 4.9, 5.1
Test/Inspection Report
A00L AFLCMC WNX AV DI-MISC-81832 PWS Ref: 3.4
Counterfeit Prevention Plan
A00M AFLCMC WNX AV DI-MGMT-80368A PWS Ref: 4.3.1, 4.4.4, 7.3
Status Report
A00N AFLCMC WNX AV DI-SESS-80640E PWS Ref: 5.1, 6.5
Request for Variance (RFV)
A00P AFLCMC WNX AV DI-QCIC-81722 PWS Ref: 4.3.2
Quality Program Plan (QPP)
A00Q AFLCMC WNX AV DI-MGMT-80501 PWS Ref: 4.4.4
Corrective Action Plan
A00R AFLCMC WNX AV DI-SESS-80255B/T PWS Ref: 4.6.1
Failure Summary and Analysis Report
A00S AFLCMC WNX AV DI-SAFT-80102D PWS Ref: 3.8.3, 9.4
Safety Assessment Report (SAR)
A00T AFLCMC WNX AV DI-MGMT-81803A PWS Ref: 3.2
Item Unique Identification (IUID) Marking Plan
A00U AFLCMC WNX AV DI-SESS-81785B PWS Ref: 3.8
Systems Engineering Management Plan (SEMP)
A00V AFLCMC WNX AV DI-MGMT-81804A PWS Ref: 3.2
Item Unique Identification (IUID) Marking Activity, Validation & Verification
A00W 406 SCMS/GUEE TM-86-01 PWS Ref: 6.2
Technical Manual Contract Requirement (TMCR)
Technical Manuals
A00X AFLCMC WNX AV DI-SAFT-80103D PWS Ref: 3.8.3, 9.8
Engineering Change Proposal System Safety Report
(ECPSSR)
A00Y AFLCMC WNX AV DI-SAFT-80104D PWS Ref: 3.8.3, 9.9
Waiver or Deviation System Safety Report (WDSSR)
A00Z AFLCMC WNX AV DI-MGMT-81468B PWS Ref: 4.3.5, 7.3
Contract Funds Status Report (CFSR)
A010 AFLCMC WNX AV DI-SESS-81874 PWS Ref: 5.1, 6.4
Engineering Data for Provisioning (EDFP)
A011 AFLCMC WNX AV DI-SESS-81758A/T PWS Ref: 4.4.8, 5.1, 7.1.1
Logisitics Product Data
A012 AFLCMC WNX AV DI-MGMT-81861C/T PWS Ref: 4.3.1, 4.9
Integrated Program Management Data and Analysis Report
(IPMDAR)
A013 AFLCMC WNX AV DI-ADMN-81249C PWS Ref: 6.3.1
Meeting Agenda
A014 AFLCMC WNX AV DI-SESS-81759A/T PWS Ref: 5.1
Logistics Product Data Summary
A015 AFLCMC WNX AV DI-MGMT-82173 PWS Ref: 3.7.1
Government Furnished Equipment (GFE) Inventory Reporting
A016 AFLCMC WNX AV DI-SESS-81757A/T PWS Ref: 3.8.5
Design Review Information Package (DRIP)
A017 AFLCMC WNX AV DI-SAFT-81563 PWS Ref: 9.2
Accident/Incident Report Accident/Incident Report
A018 AFLCMC WNX AV DI-SAFT-81626 PWS Ref: 9.9
System Safety Program Plan (SSPP)
A019 AFLCMC WNX AV DI-MGMT-81398D PWS Ref: 4.4.8, 9.4
Hazard Material Management Program Plan
A01A AFLCMC WNX AV DI-MISC-81397D PWS Ref: 9.5
Hazard Material Management Program (HMMP) Report
A01B AFLCMC WNX AV DI-SAFT-80101D PWS Ref: 9.6
System Safety Hazard Assessment Report (SSHAR)
A01C AFLCMC WNX AV DI-SAFT-82085A PWS Ref: 9.11
Hazard Tracking System (HTS) Data
LITENING_CATP2 IDIQ CDRL Package
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER ADMN
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A000
2. TITLE OF DATA ITEM
Non-Deliverable CDRL
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
N/A
5. CONTRACT REFERENCE
FA8540-19-D-0001
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
NA
9. DIST STATEMENT
REQUIRED
TBD
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final
Reg Repro
16. REMARKS
Non-Deliverable CDRL Block A: CLIN x001-008/ x039-044/ x046 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/000
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/12/17
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373/T
5. CONTRACT REFERENCE
PWS Ref: 4.3.4, 4.9, 5.1, 7.2
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x001-008/ x039-044/ x046 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/001 Refer to "General Notes" for additional information.
BLOCK 4: Tailor DID as follows:
Section 10.1: Delete - ", with the exception that the government must approve the use of any contractor insignia, trade names or symbols."
BLOCK 5: PWS para 4.3.4, 4.9, 5.1, 7.2
BLOCK 9: The Contractor shall select Distribution Statement D reason code(s) consistent with Presentation Material content and instructions in the CDRL General Notes (Section 3).
BLOCK 10: Frequency of delivery of approval items will be negotiated in each delivery order.
BLOCK 11: TBN in each DO.
BLOCK 12: TBN in each DO.
BLOCK 13: TBN in each DO.
BLOCK 14: Refer to Section 7 of "Contract Data Requirements List (CDRL) General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/12/17
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Deficiency Report (DR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81535B
5. CONTRACT REFERENCE
PWS Ref: 3.8.2, 4.4, 4.9, 5.1, 6.1
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x001-008/ x039-044/ x048 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/002 Refer to "General Notes" for additional information.
BLOCK 5: PWS para 2.3, 3.8.2, 4.4, 4.9, 5.1, and 6.1 BLOCK 9: Reason for DIST STATEMENT "D" is - "Vulnerability Information"
BLOCKS 10, 12-13:
As defined by T.O. 00-35D-54. Submit a report whenever a material or a quality deficiency of fielded (not test) hardware or software occurs utilizing Standard Form 368. Deliver a formal report of findings 30 calendar days after receipt of the Deficiency Report (DR) exhibit for all Mishap Investigation and Category-1 DRs. Deliver a formal report of findings 60 calendar days after receipt of the DR exhibit for all Category-2 DRs. USG will have 30 days to review.
Approved draft will serve as final submission. Resubmission due 30 days after disapproval.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
Refer to "General Notes" for additional information.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639E
5. CONTRACT REFERENCE
PWS Ref: 5.1, 6.4
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x039-044; x047-048 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/003 Refer to "General Notes" for additional information.
BLOCK 8: Government requires 30 calendar days for review, approval/disapproval and comments cycle.
BLOCK 9: The Distribution Statement D reason is - "Administrative or Operational Use".
BLOCK 10: Defined as any time an ECP is required.
BLOCK 13: After initial 30 calendar days for first submission review, the Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. USG will have 30 days for approval/disapproval. Extent of approval requirements include format and content.
Approved draft shall serve as the final submission.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Notice of Revision (NOR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80642E
5. CONTRACT REFERENCE
PWS Ref: 5.1, 6.4
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x039-044; x047-048 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/004 Refer to "General Notes" for additional information.
BLOCK 8: Government requires 30 calendar days for review
BLOCK 9: The Contractor shall select Distribution Statement D reason code(s) consistent with Presentation Material content and instructions in the CDRL General Notes (Section 3).
BLOCK 10, 12, 13: ASREQ defined as any time there is a functional, allocated or product baseline change.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Supplier's Configuration Management Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80858D
5. CONTRACT REFERENCE
PWS Ref: 6.1
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x0001; x5001 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/005 Refer to "General Notes" for additional information.
BLOCK 8: Government requires 30 calendar days for review, approval/disapproval and comments cycle. Approved draft will serve as final submission.
BLOCK 9: The Distribution Statement E reason is - "Administrative or Operational Use".
BLOCK 10: ASREQ defined as any time there is a change to the CMP.
BLOCK 12: The date of the first submission shall be as specified on the Delivery Order or Subtask. When no date is specified, submit within 60 days of Delivery Order or Subtask.
BLOCK 13: The Contractor shall deliver revisions, when the Contractor's organization, procedures, and/or controls of the Supplier’s CM program change.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Interface Design Description
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81436A
5. CONTRACT REFERENCE
PWS Ref: 3.8.2, 4.9, 5.1
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x039-x044 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/006 Refer to "General Notes" for additional information.
BLOCK 8: Government requires 30 calendar days for review, approval/disapproval and comments cycle.
BLOCK 9: The Contractor shall select Distribution Statement D reason code(s) consistent with Presentation Material content and instructions in the CDRL General Notes (Section 3).
BLOCK 10: ASREQ defined as any time there is a change to hardware or software that results in a change to the IDD.
BLOCK 12: The date of the first submission shall be as specified on the Delivery Order. When no date is specified, submit within 60 days of the Delivery Order that requires this CDRL.
BLOCK 13: The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
NOTE:
Content/Paragraph structure in NGC provided document may differ from
DID.
Replaces former DID DI-SESS-81431A System/Segment Interface Control Replaces former DID DI-SESS-81248B Interface Control Document (ICD)
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Request for Nomenclature (DD Form 61)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81254D
5. CONTRACT REFERENCE
PWS Ref: 4.9, 5.1
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x039-x044 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/007 Refer to "General Notes" for additional information.
BLOCK 8: Government requires 30 calendar days for review, approval/disapproval and comments cycle.
BLOCK 9: The Distribution Statement D reason is - "Administrative or Operational Use".
BLOCK 10: ASREQ defined as any time there is a change to the nomenclature.
BLOCK 12: The date of the first submission shall be as specified on the Delivery Order. When no date is specified, submit within 60 days of Delivery Order.
BLOCK 13: The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
Provide a soft copy in Adobe Acrobat file format.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Meeting Minutes
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250C
5. CONTRACT REFERENCE
PWS Ref: 3.8.1, 6.3.1
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x001-x008; x033-x036; x039-x045; x048 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/008 Refer to "General Notes" for additional information.
BLOCK 3: Place the Meeting title and conference date(s) on the Title Page.
BLOCK 8: Government requires 30 calendar days for review, approval/disapproval and comments cycle.
BLOCK 9: The Distribution Statement D reason is - "Administrative or Operational Use".
BLOCK 10: ASREQ defined as any time conference meeting minutes are delivered.
BLOCK 12: Submit within 14 days of conference end date.
BLOCK 13: The Contractor shall revise and resubmit within 14 days of disapproval/comments receipt. Extent of approval requirements include format andcontent. Approved draft shall serve as the final submission.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
DoD Maintenance Workload (50/50) Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81749B
5. CONTRACT REFERENCE
PWS Ref: 4.3.1
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ANNLY
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x001-x008 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/009 Refer to "General Notes" for additional information.
BLOCK 4: DID tailored as follows: TBD
BLOCK 11: N/A
BLOCK 12: 30 days after contract award.
BLOCK 13: Annually due NLT 15 September of each subsequent year.
BLOCK 14: (see General Notes, section 7)
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A00A
2. TITLE OF DATA ITEM
System/Subsystem Specification (SSS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81431A/T
5. CONTRACT REFERENCE
PWS Ref: 2.1, 3.8
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x044 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/00A Refer to "General Notes" for additional information.
BLOCK 4: DID tailored as follows:
Paragraph 3: delete all after " . . . on the Contract Data Requirements List (CDRL) (DD1423)
BLOCK 8: Government requires 30 calendar days for review, approval/disapproval and comments cycle.
BLOCK 9: The Distribution Statement E reasons are - "Critical Technology, Software Documentation, Export Controlled".
BLOCK 10: ASREQ defined as any time there is a change to the SSS.
BLOCK 12: The date of the first submission shall be as specified on the Delivery Order, Subtask. When no date is specified, submit within 60 days of Delivery Order or Subtask.
BLOCK 13: The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
NOTE:
Content/Paragraph structure in NGC provided document may differ from
DID.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A00B
2. TITLE OF DATA ITEM
Training Material (Aircrew Academics)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80872/T
5. CONTRACT REFERENCE
PWS Ref: 5.2
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x035-x036; x044 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/00B Refer to "General Notes" for additional information.
BLOCK 4: DID tailored as follows:
Delete sections: 10 with the exception of section 10.1.1
BLOCK 8: The government requires 30 calendar days review, approval/disapproval, and comments cycle. The contractor shall respond to Government comments within 30 calendar days.
BLOCK 9: The Distribution Statement E reason is - "?"
BLOCK 10: ASREQ is defined as any time there is a change to the training or maintenance materials.
BLOCK 12: Documentation listed section 5.2 of the PWS shall be delivered or made available NLT 60 days after contract award.
BLOCK 13: Documents changed or edited shall be delivered or made available NLT 45 days prior to flight testing for pilot familiarization.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
NOTE:
Revisions shall be submitted accordingly for review/approval.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A00C
2. TITLE OF DATA ITEM
Software Version Description (SVD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81442A/T
5. CONTRACT REFERENCE
PWS Ref: 3.8.2, 4.9
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x044 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/00C Refer to "General Notes" for additional information.
BLOCK 3: Place the Title of the covered Computer Software Configuration Item on the Title Page.
BLOCK 4: Tailor DID as follows:
Contractor Format is acceptable.
Submit in text searchable Adobe Acrobat format.
Inventory of software contents shall include the object code inventory.
SVD shall include Possible Problems and Known Issues per DID Section
3.7 as well as Open DRs.
BLOCK 8: Government requires 30 calendar days for review, approval/disapproval and comments cycle.
BLOCK 9: The Distribution Statement E reasons are - ""Software Documentation, Vulnerability Information, Export Controlled"".
BLOCK 10: ASREQ defined as any time there is a change to the SVD being delivered.
BLOCK 12: Submit Concurrent or prior to software release BLOCK 13: The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
BLOCK 14: Refer to Section 7 of ""General Notes"" for address.
NOTE:
Content/Paragraph structure in NGC provided document may differ from
DID.
For engineering SVD releases, the changes to be documented since last release shall be = changes since previous engineering release.
For production SVD releases, the changes to be documented since last release shall be = changes since last fielded release."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A00D
2. TITLE OF DATA ITEM
Computer Software Product End Items
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-AVCS-80700A/T
5. CONTRACT REFERENCE
PWS Ref: 3.8.2, 4.9, 7.2
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x044 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/00D Refer to "General Notes" for additional information.
BLOCK 4: LCP OFP or Computer Software required for LITENING pod LCP OFP loading and LITENING Troubleshooting and maintenance
BLOCK 4:
1. LCP OFP or Computer Software required for LITENING pod LCP OFP loading and LITENING Troubleshooting and maintenance tools
2. Computer software to be delivered in format suitable for its intended use. Electronic Media or electronic file transfer
BLOCK 9: The Distribution Statement E reason is - "Software Documentation".
BLOCK 10: ASREQ defined as any time there is change to the deliverable.
BLOCK 12: As required in individual delivery orders. Due NLT 30 calendar days afterreceipt of delivery order or subtask.
BLOCK 13: The Contractor shall revise and resubmit within 30 days ofdisapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A00E
2. TITLE OF DATA ITEM
Data Accession List (DAL)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453C/T
5. CONTRACT REFERENCE
PWS Ref: 3.5
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
60DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN NONE Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/00E
BLOCK 9: The Distribution Statement D reason is - "Administrative or Operational Use".
BLOCK 14: Refer to Section 7 of "General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A00F
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A/T
5. CONTRACT REFERENCE
PWS Ref: 3.8, 4.4.8.1.1, 4.9, 5.1, 7.1, 7.2
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN- x009-x024; x026-x032; x039-x046 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/00F Refer to "General Notes" for additional information.
BLOCK 4: DID tailored as follows:
Document shall be submitted in contractor format.
Delete 10.2 BLOCK 5: PWS Para 3.8, 4.4.8.1.1, 4.9, 5.1, 7.1, 7.2 BLOCK 8: The Government requires 30 calendar days review, approval/disapproval, and comments cycle.
BLOCK 9: The Contractor shall select Distribution Statement E reason(s) consistent with the instructions in the CDRL General Notes (Section 3).
BLOCK 10: ASREQ defined as any time there is a new report delivered.
BLOCK 12: The date of the first submission shall be as specified on the Delivery Order. When no date is specified, the first submission is ASREQ and will be specified by the Procuring Contracting Officer
(PCO).
BLOCK 13: Subsequent submissions shall be as specified on the Delivery Order if required by the Government. Approved draft will serve as final submission.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
See Blk 16
B. EXHIBIT
A-See Blk 16
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
LITENING
E. CONTRACT/PR NO.
FA8540-XX-D-XXXX
F. CONTRACTOR
NORTHROP GRUMMAN SYSTEMS CORPORATION
1. DATA ITEM NO.
A00G
2. TITLE OF DATA ITEM
"Computer Program Identification Number (CPIN) Catalog Information"
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81454D
5. CONTRACT REFERENCE
PWS Ref: 3.8.2, 4.9
6. REQUIRING OFFICE
AFLCMC WNX AV
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block A: CLIN x044 Block B: Exhibit- A/B/C/D/E/F/G/H/J/K Block 1: Data Item-Exhibit A through K/00G
BLOCK 8: Government requires TBD 30 calendar days for review, approval/disapproval and comments cycle.
BLOCK 9: The Distribution Statement E: Distribution authorized to DoD Components only (Direct Military Support, Critical Technology, Export Controlled). For Other requests for this document please reference the CDRL General Notes.
BLOCKS 10, 12 and 13: The Contractor shall request CPIN assignments for the LITENING Operational Flight Plan (OFP). Coordination should be done with the assigned LITENING Equipment Specialist prior to requesting a CPIN. Request CPINs IAW T.O. 00-5-16 NLT 30 calendar days prior to software CDR. The Contractor shall use web site https;//acpins.tinker.af.mil to request the required Computer Program Identification Numbers (CPIN). Updates shall be delivered as required. A copy of the Test Program Sets for depot support equipment (as required) will be provided to the LITENING Equipment Specialist for the CPIN library.
BLOCK 14: Refer to Section 7 of "General Notes" for address.
Upon final approval of the new software OFP, the Contractor shall deliver the data in electronic format to the Contractor's NGC Livelink Website Additionally, one (1) hard copy on a CD-ROM or DVD, shall be delivered to:
AFLCMC/WNV
Attention: Security Office 320 Richard Ray Blvd Bldg 300 West Wing, Bay C Rm C303 Robins AFB GA 31098 The media label should represent the information that has been input into the ACPINS database.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/01/08
I. APPROVED BY
EDGE.AMANDA.M.1396466712
J. DATE
2025/12/17
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .