FA854024R0007-0001.pdf
PDF 739 KB Posted
- Solicitation number
- FA8540-24-R-0007
About this file
This is an amendment (0001) to solicitation FA8540-24-R-0007, issued by AFLCMC/HBKB at Robins AFB GA, updating Section L Instructions to Offerors. The amendment provides detailed requirements for cost/price proposal submissions for the LITENING CATP contract.
Key requirements include: submission of certified cost/pricing data with Proposal Adequacy Checklist; detailed cost breakdowns by CLIN and contractor fiscal year; live Microsoft Excel cost models with active formulas for prime and major subcontractors (>$2M); submission of historical actual costs from 2019-2023 for contract FA8540-19-D-0001; thorough technical and cost analysis for subcontracts over $2M; unredacted subcontractor proposals required for amounts exceeding $12.5M or 10% of overall price and over $2M; proposal walkthrough with materials due 5 days prior; and electronic proposal submission through DoD SAFE to multiple agencies (LITENING Contracting Officer, Pricer, DCMA, DCAA, Navy Price Fighters) plus one hard copy. The amendment emphasizes that non-compliance with proposal requirements will require correction within 15 calendar days.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JSU
2. AMENDMENT/MODIFICATION NO.
FA8540-24-R-0007-0001
3. EFFECTIVE DATE
5 NOV 2024
4. REQUISITION/PURCHASE REQ. NO.
F3QCAB4100A001
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
AVIONICS, AFLCMC/HBKB
320 RICHARD RAY BLVD.
BLDG 300 WEST WING, BAY C, RM C303,
ROBINS AFB GA 31098-1663
BUYER: Taylor M. Walker/HBKB taylor.walker.10@us.af.mil Phone: (478) 222- 5272 Fax: (000) 000-0000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8540
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA854024R0007
9B. DATED (SEE ITEM 11)
17-SEP-2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
LITENING CATP
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8540-24-R-0007-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to update Section L, Instructions to Offerors.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + TBC
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
L-001 Instructions to Offeror
14. Cost Proposal Adequacy: In response to this Request for Proposal (RFP), the Offeror shall prepare and submit certified cost or pricing data and supporting attachments/documentation in accordance with Table 15-2, Instructions for Submitting Cost/Price Proposals When Certified Cost or Pricing Data Are Required, of FAR 15.408. Further, the Offeror shall (1) utilize the DFARS provision 252.215-7009, Proposal Adequacy Checklist (PAC), in pre-submission proposal quality reviews, and (2) furnish the completed checklist as part of their proposal submission.
15. The responsibility for providing a well-prepared and fully supported cost proposal lies solely with the Offeror. The basis and rational for all proposed costs shall be provided as part of the proposal so that the Contracting Officer has the information necessary to evaluate the reasonableness of the proposed price.
16. If the Offeror is unsure as to whether a checklist item is required in support of the proposal, or how to adequately comply with a checklist item, the Offeror shall contact the Contracting Officer as soon as possible after receipt of the RFP, but in any case prior to proposal submittal, to resolve the questions.
17. Non-compliances with the DFARS PAC and the additional requirements of this provision will require immediate correction. If non-compliances occur, a revised and adequate proposal must be received within fifteen (15) calendar days. Completion of the checklist does not relieve the Offeror from the responsibility to comply with all applicable regulations and any special requirements of the solicitation.
18. The Offeror shall flow down this provision to subcontractors/affiliates required to submit certified cost or pricing data in support of this RFP.
19. The Offeror is advised that the Contracting Officer may find costs associated with revision/rework of inadequate cost proposals unreasonable and will consider the nature and extent of any proposal inadequacies when assessing/negotiating profit/fee.
20. To preclude delays in negotiations and contract award, the completed PAC submitted with the proposal shall provide a clear explanation for any checklist items not included in the proposal, particularly items not provided based on any of the exceptions to certified cost or pricing data found at FAR 15.403-1(b) and DFARS 212.102(a)(i)(B).
21. Cost Proposal Requirements: In addition to the requirements identified in the DFARS PAC, the following also apply to the cost proposal submitted in response to this RFP.
22. Breakout by year – If the proposal includes more than one Contract Line Item (CLIN), the proposal shall include a breakout of CLIN prices by cost element by Contractor Fiscal Year (CFY). The breakout by year shall also be provided by Contract Period. The proposal shall define the timeframe of the Offeror Fiscal Year, for example January – December.
23. If the proposal includes more than one CLIN/subCLIN, recurring/non-recurring costs shall be identified for each CLIN/subCLIN.
24. When the proposal includes material costs, the proposal shall include a Consolidated Bill of Materials (CBOM) at the total contract level in an electronic sortable format such as a Microsoft Microsoft Excel spreadsheet or another format approved by the Contracting Officer. Vendor names are required for each part number.
25. When amounts proposed in the CBOM include application of escalation, the proposal shall identify the base value, the escalation rate(s) used, and the escalation amount associated with each item escalated.
26. When the proposed amount is based on historical data which has been adjusted (for example, for differences in quantities), the CBOM shall clearly identify the adjustments made to the historical data and the reason for each adjustment.
27. All costs proposed based on Cost Estimating Relationships (CERs) shall be fully supported. The proposal shall identify the basis for the proposed rate, the base to which the rate is applied, and shall clearly demonstrate the calculation of proposed costs based on CERs. The contractor shall identify all CERs that have been audited and/or reviewed by DCAA and/or DCMA. For CERs not audited or reviewed by DCAA or DCMA, the contractor shall include a basis of estimate (BOE) for each CER to include historical actuals used as the basis.
1586913308C Highlight
28. For any costs incurred prior to proposal submission, the proposal shall identify actual hours and cost incurred as well as hours/costs to complete and the time phasing associated with these hours/costs. This information/data shall be provided in a time-phased cost element summary format.
29. Submission of Historical Actual Costs Incurred: The contractor shall provide the following information for prior acquisition FA8540-19-D-0001 in Microsoft Microsoft Excel format for calendar years 2019 – 2023.
30. Contract Number (including modification number if applicable)
31. Contract Type
32. Contract Quantity
33. Contract Price
34. Actual Cost Incurred, including a breakout of actuals by hours and by cost as recurring/non-recurring costs and by cost element. If performance is not complete on a specified contract action, provide an estimate to complete and the basis for that estimate.
35. The contractor shall also require that its top five major sole source subcontractors provide the information listed in the above paragraphs (i) a.
through e. on prior contracts for items the prime is purchasing from the subcontractors for this effort. If a subcontractor’s information on prior actuals is not included in the prime’s proposal, the proposal should identify status and anticipated receipt date(s). If the subcontractor deems the information proprietary, the subcontractor may submit the information directly to the contracting officer.
36. When possible, this data should be used as the Basis of Estimate.
37. Assist Audits: The proposal shall identify those actions where assist audits have been requested by the Prime or sub-tier contractors and identify the request date and scheduled receipt date for those audits. The need for assist audits resulting from proprietary data rights assertions at any tier shall be identified to the Contracting Officer as soon as the Offeror becomes aware of the need. Government performance assist audits do not relieve the Offeror of the responsibility to accomplish and provide price/cost analysis of subcontractor proposals. If the offeror intends to request Performance-Based Payments (PBP), the offeror’s proposal shall include a monthly expenditure profile, proposed events and their projected completion dates, rationale on why the proposed event demonstrates significant progress towards the completion of the end item, proposed values for each event, completion criteria for each event, and an identification of each event as severable or cumulative.
38. Commercial product and commercial service considerations:
1586913308C Highlight
1586913308C Highlight
39. The Offeror’s proposal shall provide support for any subcontractor commercial product or commercial service determinations addressing, at a minimum, the following:
40. Description of supplies or services
41. Specific identification of the type of commercial product or commercial service claim (FAR 2.101, Commercial Product sub-definitions (1) through (6) or Commercial Service sub-definitions (1) through (3)), and the basis on which the product or service meets the definition; and
42. For modified commercial products (Commercial Product sub-definition (3)), classification of the modification(s) with supporting rational as either;
43. Of a type customarily available in the commercial marketplace (FAR
2.101 Commercial Product sub-definition (3)(i)); or
44. A minor modification of a type not customarily available in the commercial marketplace made to meet Federal Government requirements (FAR 2.101 Commercial Product sub-definition (3)(ii))*.
*Per FAR 15.403-1(c)(3)(iii)(B), modifications that meet the definition of minor modifications of a type not customarily available in the commercial marketplace as defined in FAR 2.101, paragraph (3)(ii) of the Commercial Product definition, will require the submission of certified cost and pricing data when the total price of all such modification exceeds the greater of the certified cost or pricing data threshold (FAR 15.403-4) or 5% of the total price of the contract at time of award. All commerciality support shall be presented unredacted to the Government to include invoices and other supporting documentation.
45. For proposed subcontract commercial products or commercial services “of a type”, or “evolved” or “modified” (FAR 2.101 Commercial Product sub-definitions (1) through (3) or Commercial Service sub-definition (2)), the offeror shall provide a technical description of the differences between the proposed product or service and the comparison product or service and thoroughly address the cost differences between the proposed product or service and the comparison product or service.
46. The proposal shall include, or the Offeror shall make available, data other than certified cost or pricing data to establish price reasonableness of the proposed subcontract commercial product or commercial service (to include any modifications not subject to the requirement to submit certified cost or pricing data) by supplying the following:
47. Information/data related to competition, if competition is the Offeror’s basis for asserting the reasonlessness of the proposed subcontract price.
48. Information/data related to prices (sales data, market price assessments, etc.)
Note that subcontractors may submit sales data directly to the Contracting Officer if the subcontractor deems the data proprietary.
1586913308C Highlight
1586913308C Highlight
49. The prime contractor’s or higher tier subcontractor’s price analysis/price reasonableness determination for the commercial subcontract in accordance with FAR 15.404-3(b)(1) and (2)
50. Cost information/data (cost element breakdown and supporting documentation not subject to certification in accordance with FAR 15.406-2).
Instances where cost information may be required include but are not limited to commercial products offered but never actually sold to the public, “of a type” commercial products or commercial services, or when sales data is limited and/or not recent and/or not for the same/similar quantities.
51. Note the preferred method of establishing the price reasonableness of commercial products and commercial services is to obtain commercial sales data. It is recognized that other methods, such as market price assessment data or evaluation of cost data no subject to certification, are also acceptable when prior sales data cannot be obtained. Sales data shall
52. Demonstrate sale to the general public*;
53. Be current; and
54. Where possible, be in like quantities
*Products sold to state, local, or foreign governments or items sold with applications only to state, local, or foreign governments or US Government end items, are not considered to be sales to the general public unless the proposed commercial product meets the FAR 2.101 Commercial Product sub-definition (6).
Furthermore, if any proposed commercial product and/or service is deemed other than commercial by the Government, the prime and/or subcontractors shall provide certified cost or pricing data and submit a full cost proposal compliant with Table 15-2 of FAR 15.408.
55. Additional Cost/Price Proposal Requirements:
56. All Bill of Materials (BOMs) provided with the prime’s proposal must be in a live Microsoft Excel file format, and the BOM must provide traceability to the CLIN level and WBS level.
57. The Contractor shall include all supporting data for the Basis of Estimate (BOE) on the BOE or as an attachment to the BOE. Basis of Estimates (BOEs) shall use actual and recent data, as close as possible to actual proposal submission date. Estimating rationale such as “per management direction”, “engineering judgment”, or any other debatable substantiation should be avoided whenever possible. In addition, the following areas are specifically highlighted:
58. A complete and thorough technical and cost/price analysis of each subcontractor/vendor to be awarded non-competitively and proposed in excess of $2M (certified cost or pricing data threshold) must be provided at the time of proposal submittal. If cost/price analysis of each subcontractor is not available at the time of proposal submittal, the Contractor shall provide a schedule for submission of each subcontractor analysis. Negotiations will not begin until these analyses are provided. Note a dual award to two (2) sources does not constitute competition.
59. If any subcontractor amount exceeds $12.5M or 10% of the overall price and is over $2M, a copy of the subcontractor’s un-redacted proposal containing cost or pricing data is due concurrent with the submission of the proposal but no later than 5 days after receipt of the Prime Contractor’s receipt of the subcontract proposal. Any subcontract terms or conditions are also to be submitted with the proposal. If the subcontractor refuses to submit an un-redacted proposal to the prime due to proprietary data, the Prime Contractor shall notify the Government prior to proposal submittal and provide a point of contact (POC) to the subcontractor so the Government can obtain this information. Additionally, the prime shall facilitate introductions and data responses/exchanges between the government and subcontractors.
60. Submission of electronic cost model.
61. The proposal submission shall include a live Microsoft Excel cost model with active formulas demonstrating the mathematical calculation of the prime contractor’s proposed costs to include all rate data and allocation for build-up of cost. In the event of a major subcontractor (i.e. a supplier whose proposed price exceeds $2M), a live Microsoft Excel cost model meeting the requirements outlined in this paragraph must also be submitted for every major subcontractor. The electronic cost model shall include a cost build-up by Program Year and by Calendar Year by cost element, by BOE, and by CLIN/subCLIN, consistent with the yearly breakout required by paragraph (D)(1) of this provision. The electronic cost model shall link each Work Breakdown Structure (WBS) to the applicable CLINs with a total summary by cost element for each program year and a total summary for all years by cost element. All information supporting each CLIN should be visible and verifiable in the electronic cost model. The formulas included in the electronic cost model shall not be locked, and the model shall be editable by the Government. The Government requires that the information provided be provided to all subcontractors and interdivisional transfers.
62. The Offeror shall conduct a proposal walkthrough. To facilitate a timely and meaningful walkthrough, supporting data for the discussion topics shall be provided no later than five (5) business days prior to scheduled walkthrough.
63. The Offeror shall keep Robins AFB LITENING Contracting Office informed of schedule(s) to negotiate key supplier proposals. If supplier negotiations have concluded, the Prime Contractor shall provide memos of negotiation.
64. The Offeror (Prime Contractor) shall submit an electronic copy of proposal through DoD SAFE to the LITENING Contracting Officer, LITENING Pricer, DCMA, DCAA, and Navy Price Fighters (NPFs).
In addition, one (1) hard copy of proposal shall be submitted to the Contracting Officer at the following address:
AFLCMC/HBKB
Attn: Cheri Thetford 320 Richard Ray Blvd Bldg 300 West Wing, Bay C Rm C303, Ste S23 Robins AFB GA 31098
65. The Offeror shall take actions to ensure the proposal is current throughout the acquisition.
File details come from the government source that posted it. Updated .