Atch_11_Total_Resources_Volume.xlsx
XLSX spreadsheet 2 MB Posted
- Attached to
- Maintenance and Repair Shop Equipment
- Solicitation number
- FA8533-16-R-0001
About this file
Attachment 11 - Total Resources Volume
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOE Material Summary Offeror's are required to provide a Material BOE summary that clearly lists the types and quantities of material resources proposed regardless of source (prime and subcontractors) by the SOW and CWBS time phased by Government Fiscal Year. Since the Technical and Schedule Evaluators will be primarily concerned with soundness of an offeror’s approach, including the realism and reasonableness of the types & quantities of materials, proposed unit prices and extended cost should be a sanitized version of the Priced Bill of Material, which offerors must provide in Volume IV Cost/Price. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.
SAMPLE-Labor Summary
| Employee Of: | Total All Government Fiscal Years | CWBS | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | ||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for B-2A UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For B-1B UUT TPSs | 5.1.3.4 Cybersecurity Testing For B-1B TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | |||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | 1.1 Total Hours | 3600 | 1200 | 1300 | 1500 | 84 | ||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | 1.1.1 Total Hours | 150 | 100 | 100 | 84 | |||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1 | 1.1.1.1 Total Hours | 100 | 100 | 100 | 84 | |||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.1 | Design | Senior Engineer | 100 | 100 | 100 | |||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.2 | Fabricate | Technician | 10 | |||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | 20 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Machinist | 10 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | 20 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.3 | Integrate | Senior Engineer | 8 | |||||||||||||||||||||||||||||||||||||||||||||
| Company A | Systems Engineer | 8 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | 8 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.1.1.4 | Test | Senior Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Test Engineer | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.2 | CI 2…n | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.# | SIMILAR BREAKDOWN AS 1.1.1.1 EXAMPLE | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | 1.1.2 Total Hours | 50 | ||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1 | 1.1.2.1 Total Hours | 50 | ||||||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.1 | Design | Senior Software Engineer | 50 | 100 | 50 | |||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.2 | Code | Software Engineer | 75 | |||||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.3 | Integrate | Software Engineer | 50 | |||||||||||||||||||||||||||||||||||||||||||||
| Company B | 1.1.2.1.4 | Test | Software Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.2 | CSCI 2…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.# | SIMILAR BREAKDOWN AS 1.1.2.1 EXAMPLE | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | 1.1.3 Total Hours | 2800 | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.3.1 | B-2 UUT Test Requirements Analysis | Senior Engineer | 100 | |||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | 200 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | 100 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.3.2 | B-1 UUT Test Requirements Analysis | Senior Engineer | 200 | |||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | 400 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | 200 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | 200 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | 200 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.3.3 | B-52 UUT Test Requirements Analysis | Senior Engineer | 200 | |||||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | 400 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | 200 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Junior Engineer | 200 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | 200 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.1.4 | Core Tester Data | Junior Engineer | 400 | 400 | 500 | 600 | ||||||||||||||||||||||||||||||||||||||||||
| Technical Writer | 400 | 600 | 700 | 800 | |||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | 1.2 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1 | 1.2.1 Total Hours | |||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS 1 Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.1 | Design | Senior Engineer | 50 | 50 | 50 | |||||||||||||||||||||||||||||||||||||||||||
| Company A | Electrical Engineer | 100 | 50 | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.2 | Code/Fabricate | Electrical Engineer | 20 | |||||||||||||||||||||||||||||||||||||||||||||
| Company A | Machinist | 20 | |||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.3 | Integrate | Systems Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| Company A | Technician | ||||||||||||||||||||||||||||||||||||||||||||||||
| Company A | 1.2.1.1.4 | Test | Test Engineer | ||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS 1 Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.1 | Design | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.2 | Code/Fabricate | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.3 | Integrate | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2.4 | Test | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.2 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.2.# | SIMILAR BREAKDOWN AS 1.2.1 EXAMPLE | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | System Safety | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Nuclear Certification | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences/Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Security | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above |
CLIN 0001 BOE Labor Summary
| Employee Of: | Total of All Government Fiscal Years | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| Notional CWBS | 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for Increment I UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For Increment II UUT TPSs | 5.1.3.4 Cybersecurity Testing For Increment II TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | System Safety | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Nuclear Certification | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.10 | Security | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Government Fiscal Year 1 | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| Notional CWBS | 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for Increment I UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For Increment II UUT TPSs | 5.1.3.4 Cybersecurity Testing For Increment II TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | System Safety | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Nuclear Certification | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.10 | Security | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Government Fiscal Year 2 | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| Notional CWBS | 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for Increment I UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For Increment II UUT TPSs | 5.1.3.4 Cybersecurity Testing For Increment II TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | System Safety | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Nuclear Certification | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.10 | Security | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Government Fiscal Year 3 | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| Notional CWBS | 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for Increment I UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For Increment II UUT TPSs | 5.1.3.4 Cybersecurity Testing For Increment II TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | System Safety | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Nuclear Certification | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.10 | Security | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Government Fiscal Year 4 | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| Notional CWBS | 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for Increment I UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For Increment II UUT TPSs | 5.1.3.4 Cybersecurity Testing For Increment II TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | System Safety | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Nuclear Certification | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.10 | Security | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Government Fiscal Year 5 | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| Notional CWBS | 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for Increment I UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For Increment II UUT TPSs | 5.1.3.4 Cybersecurity Testing For Increment II TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.2 | B-2A TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.3 | B-2A TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3 | B-1B UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1 | B-1B TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.1 | B-1B TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.2 | B-1B TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.3.1.3 | B-1B TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4 | B-52H UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1 | B-52H TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.1 | B-52H TPS x Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.2 | B-52H TPS x Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.4.1.3 | B-52H TPS x Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5 | Systems Engineering | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1 | Program Protection | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.1 | Cybersecurity | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.1.2 | Counterfeit Prevention | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.2 | Configuration Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.3 | System Safety | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.5.4 | Nuclear Certification | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6 | Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.1 | Business/Program Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.2 | Contracts/Subcontracts Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.3 | Financial/Earned Value Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.4 | Travel | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.5 | Conferences | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.6 | Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.7 | Data Management | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.8 | Reviews | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.9 | Audits | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.6.10 | Security | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7 | Formal Test and Evaluation | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.1 | Developmental Test and Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.7.2 | Operational Test and Evaluation (OT&E) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.8 | Program Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.9 | Development Environment | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.10 | Training | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.11 | Initial Spares | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.12 | Over and Above | ||||||||||||||||||||||||||||||||||||||||||||||||
| Employee Of: | Government Fiscal Year 6 | Labor Category | BOE Reference | 3.0 General Requirements | 4.0 Increment I | 5.0 Increment II | |||||||||||||||||||||||||||||||||||||||||||
| 3.1 Program Conferences | 4.1 EMD | 4.2 Production | 5.1 EMD | ||||||||||||||||||||||||||||||||||||||||||||||
| 3.1.1 Post Award Conference | 3.1.2 Engineering Data Guidance Conference | 3.1.3 Technical Order (T.O.) Guidance Conference | 3.1.4 Provisioning Guidance Conference | 4.1.1 SRR | 4.1.2 SFR | 4.1.3 PDR | 4.1.4 CDR | 4.1.5 BAT SVR | 4.1.6 OTRR | 4.1.7 OT&E Support | 4.1.8 PCA | 4.1.9 BAT Core Tester Test Requirements Documents | 4.1.10 PRR | 4.2.1 BAT Core Tester Production for B-2A | 4.2.2 BAT Core Tester Production Acceptance Procedures and Reports | 4.2.3 B-2A TPS Production | 4.2.4 Warranty | 5.1.1 PDR | 5.1.2 CDR | 5.1.3 SVR | 5.1.4 Operational Test Readiness Review (OTRR) | 5.1.5 OT&E Support | 5.1.6 PCA | ||||||||||||||||||||||||||
| Notional CWBS | 4.1.5.1 Develop / Build Production Representative (Core Tester) Articles | 4.1.5.2 Testing of BAT Core Tester | 4.1.5.3 Develop / Build Production Representative Article UUT TPSs | 4.1.5.4 Environmental Testing for UUT TPS Hardware | 4.1.5.5 Reliability Testing for Increment I UUT TPSs | 4.1.5.6 TRR | 4.1.5.7 Integrated TPS CI DT&E | 4.1.5.8 Integrated System DT&E | 5.1.3.1 Develop / Build Production Representative Article UUT TPSs | 5.1.3.2 Environmental Testing For UUT TPS Hardware | 5.1.3.3 Reliability Testing For Increment II UUT TPSs | 5.1.3.4 Cybersecurity Testing For Increment II TPSs | 5.1.3.5 Test Readiness Review (TRR) | 5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI) | 5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E) | ||||||||||||||||||||||||||||||||||
| 4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS) | 4.1.5.2.1 Environmental Testing | 4.1.5.2.2 Reliability Testing | 4.1.5.2.3 Cybersecurity Testing | 4.1.5.2.4 BAT Core Tester for Red Team Analysis | 4.1.5.3.1 UUT Test Requirements Documents (TRDs) | 4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI) | 4.1.5.7.1 TPS FIAT | 5.1.3.1.2 UUT Test Requirements Documents (TRDs) | 5.1.3.7.1 TPS FIAT/Integrated System DT&E | ||||||||||||||||||||||||||||||||||||||||
| WBS/Item Number | WBS Description | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1 | BAT System | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1 | BAT Core Tester | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1 | BAT Core Tester Hardware | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.1.1 | Configuration Item (CI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2 | BAT Core Tester Software | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.2.1 | Computer Software Configuration Item (CSCI) 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3 | Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.1 | B-2 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.2 | B-1 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.3.3 | B-52 UUT Test Requirements Analysis | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.1.4 | Core Tester Data | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2 | B-2A UUT TPSs | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1 | B-2A TPS 1…n (specify) | ||||||||||||||||||||||||||||||||||||||||||||||||
| 1.2.1.1 | B-2A TPS x Hardware |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .