Atch_11_Total_Resources_Volume.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
Maintenance and Repair Shop Equipment
Solicitation number
FA8533-16-R-0001
Issued by

About this file

Attachment 11 - Total Resources Volume

View the file

Other files

File Type Posted
Updated_BAT_NEWS_dated_20_Jun_16.pdf PDF
Atch_7_Past_Performance_Questionnaire_dated_01Jun16.pdf PDF
Updated_BAT_NEWS_dated_15_Jun_16.pdf PDF
Questions_and_Answers_V.pdf PDF
FA8533-16-R-0001-0002.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_15Jun16_Rev2.pdf PDF
Atch_26_BAT_Sections_L_and_M_dated_08Jun16.pdf PDF
Question_and_Answers_IV.pdf PDF
Updated_BAT_NEWS_dated_10_Jun_16.pdf PDF
Questions_and_Answers_III.pdf PDF
Updated_BAT_NEWS_dated_06_Jun_16.pdf PDF
Atch_26_BAT_Sections_L_and_M_23May16.pdf PDF
Atch_8_Relevancy_Assessment_Updated.pdf PDF
FA853316R0001_______0001.pdf PDF
BAT_CDRL_A00D_Logistics_Product_Data_with_IPPS.pdf PDF
Updated_BAT_NEWS_dated_23_May_16.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_23May16_Rev1.pdf PDF
Atch_14_Performance_Specification_23May16_Rev1.pdf PDF
Questions_and_Answers_II.pdf PDF
BAT_NEWS_dated_20_May_16.pdf PDF
Updated_BAT_NEWS_dated_11_May_16.pdf PDF
FA8533-16-R-0001_BAT_Questions_W_Answers.pdf PDF
Updated_BAT_NEWS_dated_9_May_16_(2).pdf PDF
Updated_BAT_NEWS_dated_9_May_16.pdf PDF
Atch_8_Relevancy_Assessment.pdf PDF
Updated_BAT_NEWS_dated_5_May_16.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_12_Excel_Cost_Model_27Apr16.xlsx XLSX spreadsheet
Atch_13_Bomber_Armament_Tester_Statement_of_Work_2May16.pdf PDF
Atch_26_BAT_Sections_L_and_M.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_20_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
PPI_Tool.accdb —
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
FA8533-16-R-0001.pdf PDF
Atch_10_TEP_Example.xlsx XLSX spreadsheet
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_25_DD_Form_1653.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
Atch_21_SGFP_BAT_GFP_Form.pdf PDF
Atch_22_Appendix_C.pdf PDF
Atch_24_Form_158.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_14_Performance_Specification_2May16.pdf PDF
Atch_9_Excel_Price_Model_27Apr16.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOE Material Summary Offeror's are required to provide a Material BOE summary that clearly lists the types and quantities of material resources proposed regardless of source (prime and subcontractors) by the SOW and CWBS time phased by Government Fiscal Year. Since the Technical and Schedule Evaluators will be primarily concerned with soundness of an offeror’s approach, including the realism and reasonableness of the types & quantities of materials, proposed unit prices and extended cost should be a sanitized version of the Priced Bill of Material, which offerors must provide in Volume IV Cost/Price. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.

SAMPLE-Labor Summary

Employee Of:Total All Government Fiscal YearsCWBSLabor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for B-2A UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For B-1B UUT TPSs5.1.3.4 Cybersecurity Testing For B-1B TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester1.1 Total Hours360012001300150084
1.1.1BAT Core Tester Hardware1.1.1 Total Hours15010010084
1.1.1.1Configuration Item (CI) 11.1.1.1 Total Hours10010010084
Company A1.1.1.1.1DesignSenior Engineer100100100
Company A1.1.1.1.2FabricateTechnician10
Company AJunior Engineer20
Company AMachinist10
Company AElectrical Engineer20
Company A1.1.1.1.3IntegrateSenior Engineer8
Company ASystems Engineer8
Company ATechnician8
Company A1.1.1.1.4TestSenior Engineer
Company ATest Engineer
1.1.1.2CI 2…n
1.1.1.#SIMILAR BREAKDOWN AS 1.1.1.1 EXAMPLE
1.1.2BAT Core Tester Software1.1.2 Total Hours50
1.1.2.1Computer Software Configuration Item (CSCI) 11.1.2.1 Total Hours50
Company B1.1.2.1.1DesignSenior Software Engineer5010050
Company B1.1.2.1.2CodeSoftware Engineer75
Company B1.1.2.1.3IntegrateSoftware Engineer50
Company B1.1.2.1.4TestSoftware Engineer
1.1.2.2CSCI 2…n (specify)
1.1.2.#SIMILAR BREAKDOWN AS 1.1.2.1 EXAMPLE
1.1.3Requirements Analysis1.1.3 Total Hours2800
Company A1.1.3.1B-2 UUT Test Requirements AnalysisSenior Engineer100
Company AElectrical Engineer200
Company ATechnician100
Company A1.1.3.2B-1 UUT Test Requirements AnalysisSenior Engineer200
Company AElectrical Engineer400
Company AJunior Engineer200
Company AJunior Engineer200
Company ATechnician200
Company A1.1.3.3B-52 UUT Test Requirements AnalysisSenior Engineer200
Company AElectrical Engineer400
Company AJunior Engineer200
Company AJunior Engineer200
Company ATechnician200
Company A1.1.4Core Tester DataJunior Engineer400400500600
Technical Writer400600700800
1.2B-2A UUT TPSs1.2 Total Hours
1.2.1B-2A TPS 11.2.1 Total Hours
1.2.1.1B-2A TPS 1 Hardware
Company A1.2.1.1.1DesignSenior Engineer505050
Company AElectrical Engineer10050
Company A1.2.1.1.2Code/FabricateElectrical Engineer20
Company AMachinist20
Company A1.2.1.1.3IntegrateSystems Engineer
Company ATechnician
Company A1.2.1.1.4TestTest Engineer
1.2.1.2B-2A TPS 1 Software
1.2.1.2.1Design
1.2.1.2.2Code/Fabricate
1.2.1.2.3Integrate
1.2.1.2.4Test
1.2.1.3B-2A TPS Data
1.2.2B-2A TPS 1…n (specify)
1.2.2.#SIMILAR BREAKDOWN AS 1.2.1 EXAMPLE
1.3B-1B UUT TPSs
1.3.1B-1B TPS 1…n (specify)
1.4B-52H UUT TPSs
1.4.1B-52H TPS 1…n (specify)
1.5Systems Engineering
1.5.1Program Protection
1.5.1.1Cybersecurity
1.5.1.2Counterfeit Prevention
1.5.2Configuration Management
1.5.3System Safety
1.5.4Nuclear Certification
1.6Program Management
1.6.1Business/Program Management
1.6.2Contracts/Subcontracts Management
1.6.3Financial/Earned Value Management
1.6.4Travel
1.6.5Conferences/Reviews
1.6.6Logistics Management
1.6.7Data Management
1.6.8Audits
1.6.9Security
1.7Formal Test and Evaluation
1.7.1Developmental Test and Evaluation (DT&E)
1.7.2Operational Test and Evaluation (OT&E)
1.8Program Data
1.9Development Environment
1.10Training
1.11Initial Spares
1.12Over and Above

CLIN 0001 BOE Labor Summary

Employee Of:Total of All Government Fiscal YearsLabor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
Notional CWBS4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for Increment I UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For Increment II UUT TPSs5.1.3.4 Cybersecurity Testing For Increment II TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester
1.1.1BAT Core Tester Hardware
1.1.1.1Configuration Item (CI) 1…n (specify)
1.1.2BAT Core Tester Software
1.1.2.1Computer Software Configuration Item (CSCI) 1…n (specify)
1.1.3Requirements Analysis
1.1.3.1B-2 UUT Test Requirements Analysis
1.1.3.2B-1 UUT Test Requirements Analysis
1.1.3.3B-52 UUT Test Requirements Analysis
1.1.4Core Tester Data
1.2B-2A UUT TPSs
1.2.1B-2A TPS 1…n (specify)
1.2.1.1B-2A TPS x Hardware
1.2.1.2B-2A TPS x Software
1.2.1.3B-2A TPS x Data
1.3B-1B UUT TPSs
1.3.1B-1B TPS 1…n (specify)
1.3.1.1B-1B TPS x Hardware
1.3.1.2B-1B TPS x Software
1.3.1.3B-1B TPS x Data
1.4B-52H UUT TPSs
1.4.1B-52H TPS 1…n (specify)
1.4.1.1B-52H TPS x Hardware
1.4.1.2B-52H TPS x Software
1.4.1.3B-52H TPS x Data
1.5Systems Engineering
1.5.1Program Protection
1.5.1.1Cybersecurity
1.5.1.2Counterfeit Prevention
1.5.2Configuration Management
1.5.3System Safety
1.5.4Nuclear Certification
1.6Program Management
1.6.1Business/Program Management
1.6.2Contracts/Subcontracts Management
1.6.3Financial/Earned Value Management
1.6.4Travel
1.6.5Conferences
1.6.6Logistics
1.6.7Data Management
1.6.8Reviews
1.6.9Audits
1.6.10Security
1.7Formal Test and Evaluation
1.7.1Developmental Test and Evaluation (DT&E)
1.7.2Operational Test and Evaluation (OT&E)
1.8Program Data
1.9Development Environment
1.10Training
1.11Initial Spares
1.12Over and Above
Employee Of:Government Fiscal Year 1Labor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
Notional CWBS4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for Increment I UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For Increment II UUT TPSs5.1.3.4 Cybersecurity Testing For Increment II TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester
1.1.1BAT Core Tester Hardware
1.1.1.1Configuration Item (CI) 1…n (specify)
1.1.2BAT Core Tester Software
1.1.2.1Computer Software Configuration Item (CSCI) 1…n (specify)
1.1.3Requirements Analysis
1.1.3.1B-2 UUT Test Requirements Analysis
1.1.3.2B-1 UUT Test Requirements Analysis
1.1.3.3B-52 UUT Test Requirements Analysis
1.1.4Core Tester Data
1.2B-2A UUT TPSs
1.2.1B-2A TPS 1…n (specify)
1.2.1.1B-2A TPS x Hardware
1.2.1.2B-2A TPS x Software
1.2.1.3B-2A TPS x Data
1.3B-1B UUT TPSs
1.3.1B-1B TPS 1…n (specify)
1.3.1.1B-1B TPS x Hardware
1.3.1.2B-1B TPS x Software
1.3.1.3B-1B TPS x Data
1.4B-52H UUT TPSs
1.4.1B-52H TPS 1…n (specify)
1.4.1.1B-52H TPS x Hardware
1.4.1.2B-52H TPS x Software
1.4.1.3B-52H TPS x Data
1.5Systems Engineering
1.5.1Program Protection
1.5.1.1Cybersecurity
1.5.1.2Counterfeit Prevention
1.5.2Configuration Management
1.5.3System Safety
1.5.4Nuclear Certification
1.6Program Management
1.6.1Business/Program Management
1.6.2Contracts/Subcontracts Management
1.6.3Financial/Earned Value Management
1.6.4Travel
1.6.5Conferences
1.6.6Logistics
1.6.7Data Management
1.6.8Reviews
1.6.9Audits
1.6.10Security
1.7Formal Test and Evaluation
1.7.1Developmental Test and Evaluation (DT&E)
1.7.2Operational Test and Evaluation (OT&E)
1.8Program Data
1.9Development Environment
1.10Training
1.11Initial Spares
1.12Over and Above
Employee Of:Government Fiscal Year 2Labor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
Notional CWBS4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for Increment I UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For Increment II UUT TPSs5.1.3.4 Cybersecurity Testing For Increment II TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester
1.1.1BAT Core Tester Hardware
1.1.1.1Configuration Item (CI) 1…n (specify)
1.1.2BAT Core Tester Software
1.1.2.1Computer Software Configuration Item (CSCI) 1…n (specify)
1.1.3Requirements Analysis
1.1.3.1B-2 UUT Test Requirements Analysis
1.1.3.2B-1 UUT Test Requirements Analysis
1.1.3.3B-52 UUT Test Requirements Analysis
1.1.4Core Tester Data
1.2B-2A UUT TPSs
1.2.1B-2A TPS 1…n (specify)
1.2.1.1B-2A TPS x Hardware
1.2.1.2B-2A TPS x Software
1.2.1.3B-2A TPS x Data
1.3B-1B UUT TPSs
1.3.1B-1B TPS 1…n (specify)
1.3.1.1B-1B TPS x Hardware
1.3.1.2B-1B TPS x Software
1.3.1.3B-1B TPS x Data
1.4B-52H UUT TPSs
1.4.1B-52H TPS 1…n (specify)
1.4.1.1B-52H TPS x Hardware
1.4.1.2B-52H TPS x Software
1.4.1.3B-52H TPS x Data
1.5Systems Engineering
1.5.1Program Protection
1.5.1.1Cybersecurity
1.5.1.2Counterfeit Prevention
1.5.2Configuration Management
1.5.3System Safety
1.5.4Nuclear Certification
1.6Program Management
1.6.1Business/Program Management
1.6.2Contracts/Subcontracts Management
1.6.3Financial/Earned Value Management
1.6.4Travel
1.6.5Conferences
1.6.6Logistics
1.6.7Data Management
1.6.8Reviews
1.6.9Audits
1.6.10Security
1.7Formal Test and Evaluation
1.7.1Developmental Test and Evaluation (DT&E)
1.7.2Operational Test and Evaluation (OT&E)
1.8Program Data
1.9Development Environment
1.10Training
1.11Initial Spares
1.12Over and Above
Employee Of:Government Fiscal Year 3Labor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
Notional CWBS4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for Increment I UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For Increment II UUT TPSs5.1.3.4 Cybersecurity Testing For Increment II TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester
1.1.1BAT Core Tester Hardware
1.1.1.1Configuration Item (CI) 1…n (specify)
1.1.2BAT Core Tester Software
1.1.2.1Computer Software Configuration Item (CSCI) 1…n (specify)
1.1.3Requirements Analysis
1.1.3.1B-2 UUT Test Requirements Analysis
1.1.3.2B-1 UUT Test Requirements Analysis
1.1.3.3B-52 UUT Test Requirements Analysis
1.1.4Core Tester Data
1.2B-2A UUT TPSs
1.2.1B-2A TPS 1…n (specify)
1.2.1.1B-2A TPS x Hardware
1.2.1.2B-2A TPS x Software
1.2.1.3B-2A TPS x Data
1.3B-1B UUT TPSs
1.3.1B-1B TPS 1…n (specify)
1.3.1.1B-1B TPS x Hardware
1.3.1.2B-1B TPS x Software
1.3.1.3B-1B TPS x Data
1.4B-52H UUT TPSs
1.4.1B-52H TPS 1…n (specify)
1.4.1.1B-52H TPS x Hardware
1.4.1.2B-52H TPS x Software
1.4.1.3B-52H TPS x Data
1.5Systems Engineering
1.5.1Program Protection
1.5.1.1Cybersecurity
1.5.1.2Counterfeit Prevention
1.5.2Configuration Management
1.5.3System Safety
1.5.4Nuclear Certification
1.6Program Management
1.6.1Business/Program Management
1.6.2Contracts/Subcontracts Management
1.6.3Financial/Earned Value Management
1.6.4Travel
1.6.5Conferences
1.6.6Logistics
1.6.7Data Management
1.6.8Reviews
1.6.9Audits
1.6.10Security
1.7Formal Test and Evaluation
1.7.1Developmental Test and Evaluation (DT&E)
1.7.2Operational Test and Evaluation (OT&E)
1.8Program Data
1.9Development Environment
1.10Training
1.11Initial Spares
1.12Over and Above
Employee Of:Government Fiscal Year 4Labor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
Notional CWBS4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for Increment I UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For Increment II UUT TPSs5.1.3.4 Cybersecurity Testing For Increment II TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester
1.1.1BAT Core Tester Hardware
1.1.1.1Configuration Item (CI) 1…n (specify)
1.1.2BAT Core Tester Software
1.1.2.1Computer Software Configuration Item (CSCI) 1…n (specify)
1.1.3Requirements Analysis
1.1.3.1B-2 UUT Test Requirements Analysis
1.1.3.2B-1 UUT Test Requirements Analysis
1.1.3.3B-52 UUT Test Requirements Analysis
1.1.4Core Tester Data
1.2B-2A UUT TPSs
1.2.1B-2A TPS 1…n (specify)
1.2.1.1B-2A TPS x Hardware
1.2.1.2B-2A TPS x Software
1.2.1.3B-2A TPS x Data
1.3B-1B UUT TPSs
1.3.1B-1B TPS 1…n (specify)
1.3.1.1B-1B TPS x Hardware
1.3.1.2B-1B TPS x Software
1.3.1.3B-1B TPS x Data
1.4B-52H UUT TPSs
1.4.1B-52H TPS 1…n (specify)
1.4.1.1B-52H TPS x Hardware
1.4.1.2B-52H TPS x Software
1.4.1.3B-52H TPS x Data
1.5Systems Engineering
1.5.1Program Protection
1.5.1.1Cybersecurity
1.5.1.2Counterfeit Prevention
1.5.2Configuration Management
1.5.3System Safety
1.5.4Nuclear Certification
1.6Program Management
1.6.1Business/Program Management
1.6.2Contracts/Subcontracts Management
1.6.3Financial/Earned Value Management
1.6.4Travel
1.6.5Conferences
1.6.6Logistics
1.6.7Data Management
1.6.8Reviews
1.6.9Audits
1.6.10Security
1.7Formal Test and Evaluation
1.7.1Developmental Test and Evaluation (DT&E)
1.7.2Operational Test and Evaluation (OT&E)
1.8Program Data
1.9Development Environment
1.10Training
1.11Initial Spares
1.12Over and Above
Employee Of:Government Fiscal Year 5Labor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
Notional CWBS4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for Increment I UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For Increment II UUT TPSs5.1.3.4 Cybersecurity Testing For Increment II TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester
1.1.1BAT Core Tester Hardware
1.1.1.1Configuration Item (CI) 1…n (specify)
1.1.2BAT Core Tester Software
1.1.2.1Computer Software Configuration Item (CSCI) 1…n (specify)
1.1.3Requirements Analysis
1.1.3.1B-2 UUT Test Requirements Analysis
1.1.3.2B-1 UUT Test Requirements Analysis
1.1.3.3B-52 UUT Test Requirements Analysis
1.1.4Core Tester Data
1.2B-2A UUT TPSs
1.2.1B-2A TPS 1…n (specify)
1.2.1.1B-2A TPS x Hardware
1.2.1.2B-2A TPS x Software
1.2.1.3B-2A TPS x Data
1.3B-1B UUT TPSs
1.3.1B-1B TPS 1…n (specify)
1.3.1.1B-1B TPS x Hardware
1.3.1.2B-1B TPS x Software
1.3.1.3B-1B TPS x Data
1.4B-52H UUT TPSs
1.4.1B-52H TPS 1…n (specify)
1.4.1.1B-52H TPS x Hardware
1.4.1.2B-52H TPS x Software
1.4.1.3B-52H TPS x Data
1.5Systems Engineering
1.5.1Program Protection
1.5.1.1Cybersecurity
1.5.1.2Counterfeit Prevention
1.5.2Configuration Management
1.5.3System Safety
1.5.4Nuclear Certification
1.6Program Management
1.6.1Business/Program Management
1.6.2Contracts/Subcontracts Management
1.6.3Financial/Earned Value Management
1.6.4Travel
1.6.5Conferences
1.6.6Logistics
1.6.7Data Management
1.6.8Reviews
1.6.9Audits
1.6.10Security
1.7Formal Test and Evaluation
1.7.1Developmental Test and Evaluation (DT&E)
1.7.2Operational Test and Evaluation (OT&E)
1.8Program Data
1.9Development Environment
1.10Training
1.11Initial Spares
1.12Over and Above
Employee Of:Government Fiscal Year 6Labor CategoryBOE Reference3.0 General Requirements4.0 Increment I5.0 Increment II
3.1 Program Conferences4.1 EMD4.2 Production5.1 EMD
3.1.1 Post Award Conference3.1.2 Engineering Data Guidance Conference3.1.3 Technical Order (T.O.) Guidance Conference3.1.4 Provisioning Guidance Conference4.1.1 SRR4.1.2 SFR4.1.3 PDR4.1.4 CDR4.1.5 BAT SVR4.1.6 OTRR4.1.7 OT&E Support4.1.8 PCA4.1.9 BAT Core Tester Test Requirements Documents4.1.10 PRR4.2.1 BAT Core Tester Production for B-2A4.2.2 BAT Core Tester Production Acceptance Procedures and Reports4.2.3 B-2A TPS Production4.2.4 Warranty5.1.1 PDR5.1.2 CDR5.1.3 SVR5.1.4 Operational Test Readiness Review (OTRR)5.1.5 OT&E Support5.1.6 PCA
Notional CWBS4.1.5.1 Develop / Build Production Representative (Core Tester) Articles4.1.5.2 Testing of BAT Core Tester4.1.5.3 Develop / Build Production Representative Article UUT TPSs4.1.5.4 Environmental Testing for UUT TPS Hardware4.1.5.5 Reliability Testing for Increment I UUT TPSs4.1.5.6 TRR4.1.5.7 Integrated TPS CI DT&E4.1.5.8 Integrated System DT&E5.1.3.1 Develop / Build Production Representative Article UUT TPSs5.1.3.2 Environmental Testing For UUT TPS Hardware5.1.3.3 Reliability Testing For Increment II UUT TPSs5.1.3.4 Cybersecurity Testing For Increment II TPSs5.1.3.5 Test Readiness Review (TRR)5.1.3.6 TPS Fault Detection/Fault Isolation (FD/FI)5.1.3.7 Integrated TPS Configuration Item (CI) and Integrated System Developmental Testing & Evaluation (DT&E)
4.1.5.1.1 BAT Calibration and Measurement Requirements Summary (CMRS)4.1.5.2.1 Environmental Testing4.1.5.2.2 Reliability Testing4.1.5.2.3 Cybersecurity Testing4.1.5.2.4 BAT Core Tester for Red Team Analysis4.1.5.3.1 UUT Test Requirements Documents (TRDs)4.1.5.6.1 TPS Fault Detection/Fault Isolation (FD/FI)4.1.5.7.1 TPS FIAT5.1.3.1.2 UUT Test Requirements Documents (TRDs)5.1.3.7.1 TPS FIAT/Integrated System DT&E
WBS/Item NumberWBS Description
1BAT System
1.1BAT Core Tester
1.1.1BAT Core Tester Hardware
1.1.1.1Configuration Item (CI) 1…n (specify)
1.1.2BAT Core Tester Software
1.1.2.1Computer Software Configuration Item (CSCI) 1…n (specify)
1.1.3Requirements Analysis
1.1.3.1B-2 UUT Test Requirements Analysis
1.1.3.2B-1 UUT Test Requirements Analysis
1.1.3.3B-52 UUT Test Requirements Analysis
1.1.4Core Tester Data
1.2B-2A UUT TPSs
1.2.1B-2A TPS 1…n (specify)
1.2.1.1B-2A TPS x Hardware

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .