Atch_8_Relevancy_Assessment.pdf

PDF 14 KB Posted

Attached to
Maintenance and Repair Shop Equipment
Solicitation number
FA8533-16-R-0001
Issued by

About this file

Atch_8_Relevancy_Assessment

View the file

Other files

File Type Posted
Updated_BAT_NEWS_dated_20_Jun_16.pdf PDF
Atch_7_Past_Performance_Questionnaire_dated_01Jun16.pdf PDF
Updated_BAT_NEWS_dated_15_Jun_16.pdf PDF
Questions_and_Answers_V.pdf PDF
FA8533-16-R-0001-0002.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_15Jun16_Rev2.pdf PDF
Atch_26_BAT_Sections_L_and_M_dated_08Jun16.pdf PDF
Question_and_Answers_IV.pdf PDF
Updated_BAT_NEWS_dated_10_Jun_16.pdf PDF
Questions_and_Answers_III.pdf PDF
Updated_BAT_NEWS_dated_06_Jun_16.pdf PDF
Atch_26_BAT_Sections_L_and_M_23May16.pdf PDF
Atch_8_Relevancy_Assessment_Updated.pdf PDF
FA853316R0001_______0001.pdf PDF
BAT_CDRL_A00D_Logistics_Product_Data_with_IPPS.pdf PDF
Updated_BAT_NEWS_dated_23_May_16.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_23May16_Rev1.pdf PDF
Atch_14_Performance_Specification_23May16_Rev1.pdf PDF
Questions_and_Answers_II.pdf PDF
BAT_NEWS_dated_20_May_16.pdf PDF
Updated_BAT_NEWS_dated_11_May_16.pdf PDF
FA8533-16-R-0001_BAT_Questions_W_Answers.pdf PDF
Updated_BAT_NEWS_dated_9_May_16_(2).pdf PDF
Updated_BAT_NEWS_dated_9_May_16.pdf PDF
Updated_BAT_NEWS_dated_5_May_16.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_12_Excel_Cost_Model_27Apr16.xlsx XLSX spreadsheet
Atch_13_Bomber_Armament_Tester_Statement_of_Work_2May16.pdf PDF
Atch_26_BAT_Sections_L_and_M.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_20_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
PPI_Tool.accdb —
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
FA8533-16-R-0001.pdf PDF
Atch_10_TEP_Example.xlsx XLSX spreadsheet
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_25_DD_Form_1653.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_11_Total_Resources_Volume.xlsx XLSX spreadsheet
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
Atch_21_SGFP_BAT_GFP_Form.pdf PDF
Atch_22_Appendix_C.pdf PDF
Atch_24_Form_158.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_14_Performance_Specification_2May16.pdf PDF
Atch_9_Excel_Price_Model_27Apr16.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA8533-16-R-0001

ATTACHMENT 8

Relevancy Assessment

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

RELEVANCY TABLE

(Complete with each effort submitted for evaluation)

This table will assist the PCO in evaluating the relevancy of the proposed effort to the BAT requirement.

The offeror shall enter information on each contract identified in its Past Performance Volume into the “Relevancy Table” as indicated below. Additional copies of this attachment may be produced for completion on contracts as necessary. Offeror shall only complete column two. Offeror’s answers are applicable only to the effort identified in paragraph B. above, not the offeror’s proposed solutions to the instant effort. * Use additional pages as needed to describe

RELEVANCY TABLE

This table is not all inclusive and offerors are encouraged to provide as much information as possible to enable the Government to correlate the submitted effort to one of the relevancy definitions.

Category

Contract/Effort_____________________

Circle all that apply

1. Nature of Business Area(s) Involved

Design

Development

Production

Sustainment

Other: ______________

2. Product effort

Armament Test System (automatic or manual)

Armament /Avionics Core Tester Armament Test System (automatic or manual)

Armament/Avionics Test Program Sets (TPS)

3. Application

USAF - Fighter or Bomber

DoD - Fighter

Other Aircraft (e.g. Helicopter, UAV, etc.)

Other Platform Armament (e.g. Tank, Naval Vessels, etc.)

4. Primary Operational Environment

Organizational Level (O-Level)

Intermediate Level (I-Level)

Depot Level (D-Level)

5. Is the product on the master nuclear certification list?

Yes

No

N/A

6. Were technical manuals or engineering drawings or other supporting technical documentation required in the work/contract effort?

Technical Manuals

Engineering Drawings

7. Were software documentation or test requirements documents required in the

Software Documentation

Test Requirements Documents

8. Was testing involved in the

Reliability

Environmental

Cybersecurity

9. Contract Type(s)

CPIF

FFP

FPIF

10. Contract Length (months, years, etc.)

11. Quantities produced (per month or year)

12. Did the effort include familiarization/training on product

Yes

No

13. Is the effort similar to the BAT program encompassed in this effort?

Similar*

Not Similar

* Describe in detail what makes it similar

14. Program Complexity

Complex*

Non-Complex

*Describe in detail how the program effort is of a similar complexity.

14. Present status of program effort

Complete

Not Complete

* Explain present status

SOURCE SELECTION INFORMATION - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .