FA8533-16-R-0001_BAT_Questions_W_Answers.pdf

PDF 79 KB Posted

Attached to
Maintenance and Repair Shop Equipment
Solicitation number
FA8533-16-R-0001
Issued by

About this file

BAT Questions and Answers

View the file

Other files

File Type Posted
Updated_BAT_NEWS_dated_20_Jun_16.pdf PDF
Atch_7_Past_Performance_Questionnaire_dated_01Jun16.pdf PDF
Updated_BAT_NEWS_dated_15_Jun_16.pdf PDF
Questions_and_Answers_V.pdf PDF
FA8533-16-R-0001-0002.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_15Jun16_Rev2.pdf PDF
Atch_26_BAT_Sections_L_and_M_dated_08Jun16.pdf PDF
Question_and_Answers_IV.pdf PDF
Updated_BAT_NEWS_dated_10_Jun_16.pdf PDF
Questions_and_Answers_III.pdf PDF
Updated_BAT_NEWS_dated_06_Jun_16.pdf PDF
Atch_26_BAT_Sections_L_and_M_23May16.pdf PDF
Atch_8_Relevancy_Assessment_Updated.pdf PDF
FA853316R0001_______0001.pdf PDF
BAT_CDRL_A00D_Logistics_Product_Data_with_IPPS.pdf PDF
Updated_BAT_NEWS_dated_23_May_16.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_23May16_Rev1.pdf PDF
Atch_14_Performance_Specification_23May16_Rev1.pdf PDF
Questions_and_Answers_II.pdf PDF
BAT_NEWS_dated_20_May_16.pdf PDF
Updated_BAT_NEWS_dated_11_May_16.pdf PDF
Updated_BAT_NEWS_dated_9_May_16_(2).pdf PDF
Updated_BAT_NEWS_dated_9_May_16.pdf PDF
Atch_8_Relevancy_Assessment.pdf PDF
Updated_BAT_NEWS_dated_5_May_16.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_12_Excel_Cost_Model_27Apr16.xlsx XLSX spreadsheet
Atch_13_Bomber_Armament_Tester_Statement_of_Work_2May16.pdf PDF
Atch_26_BAT_Sections_L_and_M.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_20_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
PPI_Tool.accdb —
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
FA8533-16-R-0001.pdf PDF
Atch_10_TEP_Example.xlsx XLSX spreadsheet
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_25_DD_Form_1653.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_11_Total_Resources_Volume.xlsx XLSX spreadsheet
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
Atch_21_SGFP_BAT_GFP_Form.pdf PDF
Atch_22_Appendix_C.pdf PDF
Atch_24_Form_158.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_14_Performance_Specification_2May16.pdf PDF
Atch_9_Excel_Price_Model_27Apr16.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8533-16-R-0001 Bomber Armament Tester (BAT) Questions:

1. RFP Section L Paragraph A. (2) states “Print shall be no smaller than a font size of 12 with single line spacing.”

Is it the Government’s intent that this only addresses plain text, and can text contained within a chart, graph, drawing, diagram, or supporting illustration be no smaller than a font size of 8 as long as it is readable on a printed page?

Answer: RFP Section L, paragraph A. Proposal Instructions, (2) clearly states that all

“Print shall be no smaller than a font size of 12 with single line spacing.” RFP Section L paragraph A, (4) allows the Microsoft Project 2010 IMS Gantt Chart to be submitted “in no less than 8-point font …”

2. RFP Section L Paragraph G. 5) Total Resources Volume (WBS Breakout) states “The electronic copy of this volume shall be in .xls file format to aid in the evaluation. PDF or other format will not be accepted.”

May the offeror provide the information required in Attachment 11 – Total Resources

Volume WBS Breakdown in MS Project rather than manually entering the information into the Excel file? Providing the information required in an MS Project file will allow the contractor to more efficiently provide the information for Government proposal evaluation and use during contract execution, while also reducing potential errors due to manual copying from the fully resource loaded IMS MS Project file to fill out the

Attachment 11 Excel file.

Answer: No. RFP Section L paragraph G. (5) Total Resources Volume (WBS Breakout) clearly states “The electronic copy of this volume shall be in .xls file format to aid in the evaluation. PDF or other format will not be accepted.”

3. The Attachment 11 CLIN BOE Labor Summary sheets list SOW paragraphs across the top in rows 1-5. However, those General, EMD, and Production SOW paragraphs do not match the CLIN structure; some are missing and some are listed that don’t belong to that

CLIN. For example, the “CLIN0001” sheet has Production SOW paragraphs (e.g., SOW section 4.2 which should only be mapped to the Production 0004AA/AB CLINs instead) and has the General SOW paragraphs beyond 3.1 totally missing.

Will the Government modify the CLIN sheets to only include all of the General, EMD, and Production SOW paragraphs that are appropriate for each CLIN?

Answer: The Government does not intend to modify the CLIN sheets in Attachment 11.

Any entry that is not applicable for a given CLIN sheet should be left blank the contractor.

File details come from the government source that posted it. Updated .