Questions_and_Answers_V.pdf

PDF 81 KB Posted

Attached to
Maintenance and Repair Shop Equipment
Solicitation number
FA8533-16-R-0001
Issued by

About this file

Questions and Answers (Q A) 5

View the file

Other files

File Type Posted
Updated_BAT_NEWS_dated_20_Jun_16.pdf PDF
Atch_7_Past_Performance_Questionnaire_dated_01Jun16.pdf PDF
Updated_BAT_NEWS_dated_15_Jun_16.pdf PDF
FA8533-16-R-0001-0002.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_15Jun16_Rev2.pdf PDF
Atch_26_BAT_Sections_L_and_M_dated_08Jun16.pdf PDF
Question_and_Answers_IV.pdf PDF
Updated_BAT_NEWS_dated_10_Jun_16.pdf PDF
Questions_and_Answers_III.pdf PDF
Updated_BAT_NEWS_dated_06_Jun_16.pdf PDF
Atch_26_BAT_Sections_L_and_M_23May16.pdf PDF
Atch_8_Relevancy_Assessment_Updated.pdf PDF
FA853316R0001_______0001.pdf PDF
BAT_CDRL_A00D_Logistics_Product_Data_with_IPPS.pdf PDF
Updated_BAT_NEWS_dated_23_May_16.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_23May16_Rev1.pdf PDF
Atch_14_Performance_Specification_23May16_Rev1.pdf PDF
Questions_and_Answers_II.pdf PDF
BAT_NEWS_dated_20_May_16.pdf PDF
Updated_BAT_NEWS_dated_11_May_16.pdf PDF
FA8533-16-R-0001_BAT_Questions_W_Answers.pdf PDF
Updated_BAT_NEWS_dated_9_May_16_(2).pdf PDF
Updated_BAT_NEWS_dated_9_May_16.pdf PDF
Atch_8_Relevancy_Assessment.pdf PDF
Updated_BAT_NEWS_dated_5_May_16.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_12_Excel_Cost_Model_27Apr16.xlsx XLSX spreadsheet
Atch_13_Bomber_Armament_Tester_Statement_of_Work_2May16.pdf PDF
Atch_26_BAT_Sections_L_and_M.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_20_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
PPI_Tool.accdb —
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
FA8533-16-R-0001.pdf PDF
Atch_10_TEP_Example.xlsx XLSX spreadsheet
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_25_DD_Form_1653.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_11_Total_Resources_Volume.xlsx XLSX spreadsheet
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
Atch_21_SGFP_BAT_GFP_Form.pdf PDF
Atch_22_Appendix_C.pdf PDF
Atch_24_Form_158.pdf PDF
Atch_1_Cross_Reference_Martix.pdf PDF
Atch_14_Performance_Specification_2May16.pdf PDF
Atch_9_Excel_Price_Model_27Apr16.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8533-16-R-0001 Bomber Armament Tester (BAT) Questions & Answers #5

1. We understand that according to Section M, paragraph 3.4.3 “Cost Realism” a Most Probable

Cost (MPC) will be used in making a determination of best value. We also understand that the cost-type CLINs referenced in Section M, paragraph 3.4.4 will be subject to an MPC adjustment via a cost realism analysis.

Question: Should the TEP language for these CLINs reflect a calculation that includes the

Most Probable Cost instead of Proposed Target Cost as the language currently reads?

Answer: Section M, Paragraph 3.4.4 Total Evaluated Price (TEP), has been amended to reflect a change to Notes 1, 2, and 3, and CLINs 0001, 1001, 2001, 0003AA, 0003AB, 0003AC, 1003AA, 1003AB, 2003AA, and 2003AB. All other Section M verbiage remains unchanged.

2. BAT Statement of Work, Section 1.2.4, Government Data Rights. The first paragraph of this section notes that "All hardware, software, firmware, development environments and technical data items delivered under this contract that are not Commercial Off the Shelf

(COTS) shall be delivered with Government Purpose Rights, at a minimum, for the BAT

System to be maintained, sustained, modified, re-used, or re-procured competitively at the discretion of the Government after the contract is concluded." However, the second paragraph of this section notes that "All software executables and source code developed by the contractor for the BAT System shall be property of the Government for unlimited use. This includes BAT Core tester software, TPS, and qualification software. BAT Core

Tester software is defined as the operating system software, firmware, power-on confidence test software, self-test software, calibration software, test executive software, system recovery and/or security software required to meet cybersecurity requirements." These two paragraphs appear in conflict with one another regarding software rights to be provided the government. The first paragraph allows software to be delivered with Government Purpose

Rights, but the second paragraph notes that all software must be provided with unlimited rights. In addition, these two paragraphs are not in accordance with RFP clause DFARS

252.227-7014, Rights in Noncommercial Computer Software and Noncommercial Computer

Software Documentation.

Question: Will the government resolve the disconnect regarding software rights to be provided by the contractor?

Answer: In response to the question regarding software rights to be provided by the contractor, the Government has clarified SOW Paragraph 1.2.4 Government Data Rights.

The clarified verbiage is in SOW Rev 2, dated 15 June 16, as incorporated in RFP

Amendment 0002.

3. Considering the direction provided in SOW Paragraph 1.2.4, please provide clarification on software rights to be provided to the Government.

Question: Will the government accept an offeror's proposal which includes the pricing for multiple licenses of the RTS software? Will the Government accept this software without unlimited rights? If not, will the Government provide the required number of RTS software licenses to the contractor during execution?

Answer: Determination of technical acceptability is based upon the evaluation factors within Section L and M and meets the requirements set forth in the Performance

Specification and Statement of Work. The Government has clarified SOW Paragraph 1.2.4

Government Data Rights, in SOW Rev 2, dated 15 June 16, as incorporated in RFP

Amendment 0002.

4. In the Q&As # 15, we understand that a copy of our Industrial Safety and Health Plan is required to be submitted with our proposal. This is a lengthy document. Please confirm that we may submit this plan in electronic form only (not a printed hardcopy).

Answer: No. That is not correct. The Safety and Health Plan shall be submitted in the format(s) consistent with the Volume I Completed RFP instructions in Section L of the RFP under the Number of Copies column. See notice in RFP Amendment 0002.

Question: We have received notice from one of our past performance POC’s that the individual that will be providing the completed questionnaire to the Government is not the same POC that we have listed in the PPI tool (and hardcopy printout). Do you require change pages to our submission to highlight the new POC or is an e-mail notification with the new POC information sufficient?

Answer: Any changes to previously-identified past performance POCs should be updated by page change(s). The page change(s) may be submitted as an email attachment to the contracting officer in order to expedite the notification process.