Atch_1_Cross_Reference_Martix.pdf

PDF 13 KB Posted

Attached to
Maintenance and Repair Shop Equipment
Solicitation number
FA8533-16-R-0001
Issued by

About this file

Attachment 1 - Cross Reference Matrix

View the file

Other files

File Type Posted
Updated_BAT_NEWS_dated_20_Jun_16.pdf PDF
Atch_7_Past_Performance_Questionnaire_dated_01Jun16.pdf PDF
Updated_BAT_NEWS_dated_15_Jun_16.pdf PDF
Questions_and_Answers_V.pdf PDF
FA8533-16-R-0001-0002.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_15Jun16_Rev2.pdf PDF
Atch_26_BAT_Sections_L_and_M_dated_08Jun16.pdf PDF
Question_and_Answers_IV.pdf PDF
Updated_BAT_NEWS_dated_10_Jun_16.pdf PDF
Questions_and_Answers_III.pdf PDF
Updated_BAT_NEWS_dated_06_Jun_16.pdf PDF
Atch_26_BAT_Sections_L_and_M_23May16.pdf PDF
Atch_8_Relevancy_Assessment_Updated.pdf PDF
FA853316R0001_______0001.pdf PDF
BAT_CDRL_A00D_Logistics_Product_Data_with_IPPS.pdf PDF
Updated_BAT_NEWS_dated_23_May_16.pdf PDF
Atch_13_Bomber_Armament_Tester_Statement_of_Work_23May16_Rev1.pdf PDF
Atch_14_Performance_Specification_23May16_Rev1.pdf PDF
Questions_and_Answers_II.pdf PDF
BAT_NEWS_dated_20_May_16.pdf PDF
Updated_BAT_NEWS_dated_11_May_16.pdf PDF
FA8533-16-R-0001_BAT_Questions_W_Answers.pdf PDF
Updated_BAT_NEWS_dated_9_May_16_(2).pdf PDF
Updated_BAT_NEWS_dated_9_May_16.pdf PDF
Atch_8_Relevancy_Assessment.pdf PDF
Updated_BAT_NEWS_dated_5_May_16.pdf PDF
Atch_6_Transmittal_Letter.pdf PDF
Atch_12_Excel_Cost_Model_27Apr16.xlsx XLSX spreadsheet
Atch_13_Bomber_Armament_Tester_Statement_of_Work_2May16.pdf PDF
Atch_26_BAT_Sections_L_and_M.pdf PDF
Atch_16_Contract_Data_Requirements_List_B00U-B018.pdf PDF
Atch_4_Client_Authorization_Letter.pdf PDF
Atch_20_RGFP_BAT_GFP_Form.pdf PDF
Atch_15_Contract_Data_Requirements_List_A001-A00G.pdf PDF
PPI_Tool.accdb —
Atch_2_Electronic_Format_for_All_Proposal_Volumes.pdf PDF
Atch_19_CDRL_General_Notes.pdf PDF
FA8533-16-R-0001.pdf PDF
Atch_10_TEP_Example.xlsx XLSX spreadsheet
Atch_17_Contract_Data_Requirements_List_B001-B00T.pdf PDF
Atch_25_DD_Form_1653.pdf PDF
Atch_18_Contract_Data_Requirements_List_C001-C008.pdf PDF
Atch_11_Total_Resources_Volume.xlsx XLSX spreadsheet
Atch_7_Past_Performance_Questionnaire.pdf PDF
Atch_3_Past_Performance_Information_for_Offerors.pdf PDF
Atch_21_SGFP_BAT_GFP_Form.pdf PDF
Atch_22_Appendix_C.pdf PDF
Atch_24_Form_158.pdf PDF
Atch_14_Performance_Specification_2May16.pdf PDF
Atch_9_Excel_Price_Model_27Apr16.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA8533-16-R-0001

ATTACHMENT 1

CROSS REFERENCE MATRIX (CRM)

The Cross Reference Matrix will be utilized as a tool to show critical interrelationships and dependencies among Section L (Instructions to Offerors), Section M (Evaluation Basis for Award), the Statement of Work (SOW), the Performance Specification, the CLINs or Sub-CLINs, and the Contract Data Requirements List (CDRL). The Cross Reference Matrix will help an offeror ensure they have responded to all of the evaluation criteria and proposal submittal requirements identified in the solicitation. If the matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over the matrix. Additionally, to the extent the matrix discloses details as to the manner by which the Government intends to evaluate the offeror’s proposals for award, Section M references in the matrix are for informational purposes only, and the Government shall be obligated to evaluate proposals solely in conformance with Section M of the solicitation.

The offeror shall provide a Cross Reference Matrix that identifies Proposal Volume and Paragraph reference(s) for each Subfactor/element identified below.

SUBFACTOR STATEMENT OF WORK PERFORMANCE SPECIFICATION PROPOSAL REFERENCE OTHER

Subfactor One - Systems Engineering

UUT Analysis Risk Mitigation Plan 4.1.1(a) Functional Allocation & UUT Utilization Matrix 3.1.2, 3.1.16

Intergrated Master Schedule with Rationale 4.1, to include all subparagraphs

5.1.2 and 5.1.7;

6.1.2 and 6.1.7

Subfactor Two - Reliability Reliability Tasks 3.4(d) 3.2.2.2.1 Configuration Item Reliability Risk Mitigation 3.4(f) 3.2.2.2.1

Subfactor Three - Cybersecurity Cyber-Secure Design 3.1.20.1 through 3.1.20.9 and 3.20(c) Cyber-Secure Development Environment 3.5.3.5

File details come from the government source that posted it. Updated .